Professional Documents
Culture Documents
Islamabad Pakistan
Overview of TGA
Projects
o Energy Efficient Brick Production (EEBP)
2
Overview of TGA
3
Overview of TGA
4
TGA’s Projects
5
Energy Efficient Brick Production (EEBP)
Project
6
Energy Efficient Brick Production (EEBP)
Vision
Goal
7
Outline of the EEBP Project
8
VSBK Technology - History
China
10
Vertical Shaft Brick Kiln (VSBK)
VSBK Operation
Loading A continuous Kiln
with stationary fire
and moving
bricks arrangement
Burning out
and
vitrrification
Unloading
11
Bull’s Trench Kiln (BTK)
A continuous kiln with Figure 1: Top view- Schematic
diagram FCBTK
J
stationary Office B
26 sq. ft.
bricks arrangement C
Office Office
Office Office
Office Office
Office Office
Office Office
Office Office
G
26 sq. ft. 26 sq. ft.
2
H
Office Office
I
113 sq. ft. 113 sq. ft.
Office
26 sq. ft.
12
Construction of 3 Pilot Kilns (Sep 2008-Feb 2009)
20
Loading of VSBK Shafts
21
Loading of VSBK Shafts
22
Loading Pattern of VSBK Shafts
23
Coal Weighing
24
Coal Charging
25
Initial Firing
26
Initial Firing
27
Temperature Monitoring
28
Record Keeping
29
Unloaded VSBK Bricks
30
Batch of VSBK Fired Bricks
31
Stock of VSBK Bricks
32
Ash Fusion Problems
33
Salient Features of VSBK Vs. BTK
Total Construction cost (Rs) 2.8 Millions 1.0 Million
Total Land Required (2 Shafts) 3 Kanals (16320 Sq ft) 5 Kanal (27200 Sqft)
34
Brick Production Capacity
Daily Production
A-Grade Bricks 95 % 70 %
35
Brick Strength Comparison VSBK vs. BTK
36
Outputs of the EEBP - Inception Phase
37
Analysis of Brick Sector – Studies
o Legal review of the Brick Sector in Pakistan
>>Laws not specific to brick sector
39
Main Themes EEBP
Jan - Dec 2011
40
TGA’s Projects
41
Compressed Earth Blocks Project
Completed Activities
o Preparatory Activities on CEB
o Trainings of Trainers
49
THANK YOU
50