Professional Documents
Culture Documents
I Preparation Work -
TAX 10% -
In Word :
(…...........................................)
BOQ (BILL OF QUANTITY)
ARCHITECTURE BUILDING WORK
HANSEL DEE PROJECT BORACAY, PHILIPPINES
(HS5) BEACH BAR & RESTO
A Installation Work
1 Hebbel Installation Work for Wall, Thikcness = 15 cm. 45,69 m2 - -
2 Hebbel Installation Work for Wall, Thikcness = 20 cm. 33,47 m2 - -
3 Hebbel Installation Work for Wall, Thikcness = 25 cm. 16,30 m2 - -
4 Hebbel Installation Work for Wall, Thikcness = 30 cm. 21,73 m2 - -
5 Practical Column Installation Work, Size 11 x 11 cm. 29,60 m1 - -
6 Practical Ring Beam Installation Work, Size 11 x 11 cm. 15,30 m1 - -
7 Mortar Plastering Work for Wall 234,37 m2 - -
8 Neat Plastering Work 234,37 m2 - -
9 Water Proof Work for Toilet Wall 27,00 m2 - -
10 Mortar Plastering Work for Roof Plat & Planter Roof/Pebbles Roof 34,90 m2 - -
11 Water Proof Work for Planter Roof/Pebbles Roof 34,90 m2 - -
12 Corner Thread Work 150,80 m1 - -
13 Riverstone Work for Building Access Stairs 4,50 m3 - -
14 Conblock Installation Work for Fix Bench Base Frame 8,17 m2 - -
15 Plastering Work for Fix Bench 10,37 m2 - -
16 Cement Polish Finish for Fix Bench 10,37 m2 - -
Subtotal -
B Floor Work
1 Decorative Concrete Tile "Tegel" Type B, size 20x20cm 63,60 m2 - -
2 Grey Granite Tile (Anti Slip) Floor Installation, Size 60 X 60 cm. 11,40 m2 - -
3 Concrete Flame Finish Floor Installation 33,00 m2 - -
Subtotal -
Subtotal -
D Ceilling Work
1 Conwood Lath 4" Cut Ceilling Installation 23,30 m2 - -
2 Gypsum Board Ceilling Installation, Thickness = 9mm 9,00 m2 - -
3 Rattan Bamboo Layer for Ceilling Instalation 110,60 m2 - -
4 Concrete Expose -Dulux Paint-White W500 Finish Ceilling Installation 1,90 m2 - -
5 Concrete Flame Finish Ceilling Installation 18,48 m2 - -
Subtotal -
Subtotal -
F Finishing Work
1 Concrete Flame Finish for Wall 135,10 m2 - -
2 Natural Stone Random Size Finish Work for Wall 78,33 m2 - -
3 Wall Paint Finish - White Color (Ex. Dulux White W500) for Gypsum Ceilling 9,00 m2 - -
4 Polish Installation Work for Conwood Ceilling, Clear Doff Finish 23,30 m2 - -
5 Polish Installation Work for Door Panels, Clear Doff Finish 19,74 m2 - -
6 Polish Installation Work for Door & Window Jamb, Clear Doff Finish 41,60 m1 - -
7 Polish Installation Work for Wooden Beam, Solid Wood Size 15 x 20 cm 21,40 m1 - -
8 Polish Installation Work for Wooden Rafter, Solid Wood Size 8 x 12 cm 224,00 m1 - -
9 Polish Installation Work for Wooden Support, Solid Wood Size 6 x 12 mm 26,50 m1 - -
10 Polish Installation Work for Solid Wood Fascia Board Size 2 x 25 cm 30,00 m1 - -
11 Polish Installation Work for Wooden Beam, Solid Wood Size 10 x 15 cm 46,70 m1 - -
12 Polish Installation Work for Solid Rattan For Roof 43,20 m2 - -
Subtotal -
Subtotal -
H Sanitary Installation
1 Toto Closet Type CES9788WZ 2,00 set - -
2 Toto Drain Type TX1C 2,00 set - -
3 Toto Tissue Holder Type DS731 2,00 set - -
4 Lavatory Toto Type LW578J 2,00 set -
5 Faucet Lavatory Toto Type TX116LV 2,00 set -
Subtotal -