Professional Documents
Culture Documents
SCOPE OF WORK
1. Survey of the existing HVAC
System.
Condition DB WB % RH
Summer 110 75 20
Monsoon 95 83 60
Winter 45 41 70
Inside 75 55
Air changes per hour = 12 ACPH
ONCE THROUGH
LOCATION TR CFM
Shift Lab 21.51 4687
General Shift Lab 22.4 5273
Analyzer Room 4.1 1104
Sin dist Room 3.3 920
ICP MS Room 3.35 962
Water Lab 7.7 2199
ATR Testing Lab 7.6 2007
TOTAL ONCE THRU 70 17152
NORMAL
LOCATION TR CFM
Officers room 1.43 703
Utility Room 1.44 456
Officers Room 2 1.43 703
Officers Room 3 1.43 703
COCM Room 1.29 653
Engine Room 4.41 1743
TOTAL NORMAL 11.43 4961
GRAND TOTAL OLD BUILDING 81 22113
NEW BUILDING ALL ONCE THROUGH
ONCE THROUGH
LOCATION TR CFM
Spectroscopy 9.96 2850
Gas Chromotography 13.2 3777
Chemical Store 2.67 748
Glass Ware 2.67 748
G C Spare 2.67 748
Water and Waste Water 6.67 2087
Analyzer Room 5 1284
Process Control 16.91 4752
Sample Retention 7.28 1100
TOTAL ONCE THRU 67 18094
ONCE THROUGH
LOCATION TR CFM
Officers Room 5.26 815
Density Room 5.2 815
Officers Room ff 2.7 765
Meeting Room 5.15 1334
AQCM Room 3.2 1100
Lunch and Locker 4.58 1441
TOTAL 26.09 6270
GRAND TOTAL NEW BUILDING 93 24364
b. Chiller and Pump selection
Chiller
Based on combined heating load requirement of
both building is 182 TR. A Chiller unit is formally
selected of 200 TR capacity.