Project Details
625kVA 625kVA
DG SET-1 DG SET-2
11KV/433V, 1250kVA
TRANSFORMER (OLTC)
Electrical
(OUTDOOR TYPE)
Uninterrupted Power :
UPS is planned for emergency lighting in cellar, corridors,
security devices like CCTV, Access control systems, VDP and
Equipment's like Tread mills,
Meter &
Transformer
Yard
BLOW UP
Basement 1 :
Electrical &
DG Rooms
BLOW UP
TRANFORMERS :
1No 11KV/433V 1250KVA ONAN Transformer with OLTC
DG SETS:
2No’s 625KVA DG sets.
Power
CAPACITOR BANKS WITH CONTACTOR
Distribution SWITCHES :
Capacitor duty contactor of the capacitor banks with harmonic
filters are planned
END FEED
UNIT
As per IS 3043.
Main PCC and Electrical panels/ Raisers and UPS Bodies are
proposed to be connected to Earth mat using 50X6mm GI strip.
GRID EARTHING
Earthing
TERRACE FLOOR
17
TH FLOOR -FLATS
Lightning BUILDING
COLUMN
Protection
LP is planned based on IS IEC/IS 62305, using conventional type system with
FIRST FLOOR
CELLAR-1
CELLAR-2
All horizontal grid on Terrace interconnected so that no part of the roof is more
CELLAR-3
than 9M away from the nearest horizontal conductor
Roof Conductors are proposed to connect with columns. Columns are used as
Down conductors.
COLUMN
Terrace Floor
Level
Protection Lower
Basement Slab
Reinforcement
in Raft Slab
Internal Planned FRLS Copper Conductor Wires With Fire Retardant Heavy
Distribution Gauge PVC Conduits.
Planned Bus Duct Rising Mains Through Dedicated Ducts Instead Of
Copper Wires Vertically.
INCOMING CABLES
RG11
RG11
CAT6
CAT6
RG11
RG11
DTH
CAT6
CONVENTIONAL OFC BASED
Plumbing
Systems
WATER BALANCE DIAGRAM
Raw water shall be treated with necessary water treatment for Domestic
water usage as confirming to IS:10500-2012.
Water STP treated water shall be used for toilet flushing , gardening / irrigation
Domestic
FLOOR 13
FLOOR 12
FLOOR 07
FLOOR 10
FLOOR 06
Water
FLOOR 08
FLOOR 05
DOWN
COMER 2 FLOOR 01
Distribution
DOWN
COMER 3
W
T
P
FROM
BOREWELL RAW WATER FROM MCH
BORES SOFT WATER FOR 1.5 DAY’S STORAGE
1.5 DAY’S STORAGE
@160 CU.M
@235 CU.M
FLUSH WATER DISTRIBUTION
1) VERTICAL RISERS 1& 2TYPICAL PRESSURE
RANGES FROM 1.2KG/SQCM TO 3.4KG/SQCM
Flush VERTICAL
RISER 3
Water VERTICAL
FLOOR 17
Distribution
RISER 1
FLOOR 12
FLOOR 9 FLOOR 11
FLOOR 5 FLOOR 10
FLOOR 4
FLOOR 2
FLOOR 1
RM RM
HP-1 HP-2
Hot For every Top floor apartment, solar hot water system is proposed as
dedicated system with Water and Backup power drawn from respective
Water unit
Water & Rain water pipes from roof top shall be 110mm dia rain water pipes
through sanitary ducts ( 110mm dia : 168.6sq.m area coverage)
Cellar connected to the recharge pits
Drains Propose sub soil drain for lower basement floor, however same shall be
confirmed by the structural consultant
System
Detection
System
Active
Suppression
FIRE System
FIGHTING
Protection
Passive
System
FIRE PROTECTION SYSTEM
Following are the requirements for fire protection system as per NBC 2016, part-IV for
Residential occupancy building (A-4 category) with height above 45.00mt but not
exceeding 60.00 mt. : (Each tower shall consist of following fire safety measures)
Note: One sump along with a set of pumps shall be provided for each 100 hydrants or
part thereof with a maximum number of two pump sets.
since the number of hydrants are exceeding 100 no’s, 2 sumps along with 2 sets of
pumps are required and to be considered for all the blocks.
FIRE PROTECTION SYSTEM
Safety requirements for Residential occupancy building: (In each
Tower)
S.No Description Required Provided
LIFE SAFETY 1. No of staircases 2 2
SYSTEMS 2.
Aggregate Width of
2.75M 3.00M
staircase
All staircases Cross
Cross ventilated or ventilated & Lift
3. Ventilation of staircase
pressurized Lobbies are
pressurized.
1 No. of Wet riser for Block-A & 2 Nos. of wet risers for Blocks B,C
& D are required and considered as per the floor area and travel
Fire Fighting distances requirements
Systems Wet risers are planned with 150 mm dia MS class-B pipes for
Sprinkler & Hydrant systems.
Internal hydrant system planned in entire building as per IS : 5290
& NFPA 24.
One number of single headed hydrant valve is provided at every
fire shaft with a Hose box consisting of 2x15Mtrs RRL hoses and a
branch pipe.
systems.
FIRE PROTECTION SYSTEM
Hydrant Hose reel drums with 36m length hose reel planned near every fire shaft
Fire Sump & Fire pump room is provided with following fire pump capacities:
Pumps 2 no’s of 2280 lpm @ 100m head electrically driven End suction Back
pull out pumps for sprinkler system & hydrant system.
details 1 no of 2280 lpm @ 100m head common stand by diesel engine
driven End suction back pull out pump.
1 no of 180 lpm @ 100m head jockey End suction back pull out
pump.
Positive suction is provided for fire pump room at Basement-1 level.
Brigade 1 no. 2 Way brigade inlet is connected to hydrant riser in each
shaft.
connectivity
details 4 way brigade inlet is directly connected to fire sump.
FIRE PROTECTION SYSTEM
Fire charts indicating the fire safety precautions and fire plan
with escape route shall be finalized later
Fire Signages
Conventional Fire Conventional Fire alarm system is provided in each tower.
Fire alarm panel is provided at ground floor in FCC room.
Alarm System 2core x 1.5 sq.mm ATC armoured FR (fire resistant) cable
Heat detectors are provided in electrical room & Smoke
detectors in Service room areas.
FIRE ALARM SYSTEM
Observations
TDR document shall be provided for Fire Approval
submission.
LPG Gas
Reticulation
Insert the Sub Title
of Your Presentation
LPG reticulation planned with domestic (14.2kg) cylinders.
SYSTEM Bank capacity shall not be more than 1000kgs as per CCOE / NBC/ is 6044/
OISD 162 guidelines.
Bank with 60 no’s cylinders each for 10 days of refill capacity so that
capacity is less than 1000kg for working.
Gas bank of the same capacities planned for standby with Auto
Changeover
From the bank, main gas pipes are taken through flat utility duct area.
Gas meters with pulse output / pre-paid meters planned in utility duct of
LPG GAS kitchen for every unit
RETICULATION
SYSTEM
LP GAS RETICULATION SYSTEM
LP GAS RETICULATION SYSTEM
ACMV
Systems
SCOPE OF DESIGN
Building Blocks are planned with HVAC DX-System for all the floors.
The indoor units shall be Hi-wall split units / cassette units, Fan coil
units or ducted type depending upon the internal
Architectural/interior layouts.
ACMV system The outdoor units shall be located at Floor level/ceiling supported
level based on the Architectural/Client confirmed locations.
description for
Each Indoor unit is connected to the respective dedicated Out Door
Residential Unit with copper refrigerant piping (i.e. Liquid and Gas Pipe).
Conventional (Direct Expansion) Type of Air Conditioning System:
Each Indoor unit drain pipe is connected to nearest drain point which
should be concealed in the floor and further connected to drain point
ACMV
Schemes
BASEMENT VENTILATION SYSTEM:
All blowers operated through timer based & can be integrated with BMS/
Mechanical fire panel
Ventilation In Fire Mode, Fire panel signal will supersede the operation of the basement
ventilation system
System As per NBC Fresh air to be planned with fresh air cut-outs with an area
equivalent as 2.5% of the basement floor area.
Note:-(Given ventilation cutouts is above 2.5%. So, forced fresh air ventilation is
not provided.)
BASEMENT VENTILATION SYSTEM:
JET FANS OPERATION:
6ACPH in normal mode. Total 12ACPH in emergency mode.
Extract fans, 2 of 50% duty each
Rated for 250°C / 60 mins
Generally mounted at celling level
Jet fans fully assembled for easy installation
Mechanical High / low speed operation
Ventilation Final locations to be confirmed based on CFD
System
BASEMENT VENTILATION SYSTEM SCHEMATIC:
Mechanical
Ventilation
System in
Basement plan
FACILITIES PROVIDED WITH MECH. VENTILATION SYSTEM:
Pump Rooms, DG Room, LT Panel Room, Electrical Panel Room and Battery Room
(Note: Toilets & STP shall be maintained negative pressure to prevent spreading of
foul smell / air.)
Mechanical
Ventilation Sl. No. Service No. of Air changes / hour
1 Toilets 12
System 2 Utility -Plant rooms, pump rooms 12
4 S.T.P 30 ACH
Smoke
management
NBC Staircase & Lift Lobby Pressurization Criteria
system
ELV
Systems
IP CC SURVEILLIANCE SYSTEM
Surveillance Ramp Entry / Exit from Basements, Stilt floors, Site plan Main entrance/exit
gates for both sides, Internal / External drive way areas & Services rooms like
Electrical Panel Rooms , Water Pump Room, fire pump room, Chiller plant
room and DG room.
All cameras are proposed to be monitored from BMS / Security Room. Also
Date:29-11-2018.
can be remotely viewed on LAN / WAN.
NVR Backup is planned for 30 days recording capacity.
Wiring for internal Cameras are with unarmoured CAT6 Cables, &
External Cameras are with Armoured Cat6 Cables / OFC cable.
POE (Power Over Ethernet) Gigabit Ethernet switches 4/8/16/24 are
planned for connectivity of cameras at multiple locations and all switches
System site plan for entry and exit for two wheeler entry.
For Visitors, Operation of boom barrier is with remote control by
security.
Camera for monitoring the Entry & exit of vehicles and personnel is
considered in CCTV Package.
Solar Fencing Perimeter Protection System is proposed on Compound wall .
The system will operate as a psychological and physical barrier for the
Trespassers.
Total Length of the fence is divided by no of Zones, hence the Trespassers shall
be quickly identified.
Each zone length is considered maximum up to 200 meters.
Solar Fence Main Control Panel is located at the Main gate Security Room, provided with
Hooter for alarm intimation.
System Energizer sends short pulses for 0.3 mille seconds duration of 4 to 9 KV in an
interval of 1.2 seconds, which causes shock and fear in intruders
12V / 90 AH Battery (Reputed Make) along with electronic system will be kept
in a protected place, preferably near Security Cabin.
12V / 74Wp Solar PV Module of reputed make will be supplied, which can
generate the required power. Battery shall provide a backup of more than 48
Hrs.
In the event of complete darkness or solar power input failure,
Auxiliary supply of 230V AC shall be provided by User.
THE SYSTEM CONSISTS OF THE FOLLOWING:
Main Controllers, Monitoring and Reporting Unit & Fence
Energizer
BEMS
Video door phone can be placed in living or drawing room.
Door phone camera at the main door entrance.
V D P System Multiple VDP’s up to 3 no’s can be placed in different areas.
Standalone Provision to connect gas leak detector, panic button, cameras etc.
VDP
DigitalDoor Lock
VIDEO DOOR PHONE SYSTEM – INTEGRATED ( OPTIONAL)
All The Services In Integrated In Single Fiber.
HD ready as higher band width supported up to 50mbps-100mbps per user.
Voice is integrated in optical line terminal equipment with sip application
server.
IPTV easily supported on FTTH.
FTTH
FTTH supports up to 20kms from end to end device.
Low maintenance as all are centrally configurable & managed devices.
System
FTTH
System
FTTH
System