MEP Services

Presentation
CHOICE INFRA @ MIYAPUR

MEP CONSULTANTS:
Agenda
01 Electrical Systems

02 Plumbing Systems

03 Fire and Life Safety

04 LPG Systems

05 ACMV Systems

06 ELV Systems
Project Details

Height of Building : 53.70M


Number of Floors :
3 Basements + 1Stilt+ Number of Blocks : 4
17Floors
Project Details

3 BHK Flats: 408Nos

Total Flats : 408Nos


Electrical
Systems
Electrical
Systems
External Internal
Electrification Electrification

Insert the Sub Title


of Your Presentation
External
Electrification
HT METERING WITH 100% DG BACK UP

Connected Load For Each 3BHK Flat(one Flat/Floor) : 19.0kW


Expected Demand For Each 3BHK Flat(one Flat/Floor) : 4.0kW
Insert the Sub Title
of Your Presentation
External
Electrification

Insert the Sub Title


of Your Presentation
CLIENT SIDE
SUPPLIER SIDE 11kV HT 1BKREAKER
CT/PT VCB PANEL
11kV 1VCB PANEL METERING
INCOMING
SOURCE
FORM
TSSPDCL

625kVA 625kVA
DG SET-1 DG SET-2
11KV/433V, 1250kVA
TRANSFORMER (OLTC)

Electrical
(OUTDOOR TYPE)

Schematic ACB WITH


ENCLOSURE
(OUTDOOR TYPE)
INTERLOCK INTERLOCK
MAIN PCC
Surge Protection :
Surge Suppressors planned in Main PCC

Power Voltage Regulation :


Transformers planned with OLTC for Voltage correction within
Quality 1.5625%

Uninterrupted Power :
UPS is planned for emergency lighting in cellar, corridors,
security devices like CCTV, Access control systems, VDP and
Equipment's like Tread mills,
Meter &
Transformer
Yard

BLOW UP
Basement 1 :
Electrical &
DG Rooms

BLOW UP
TRANFORMERS :
1No 11KV/433V 1250KVA ONAN Transformer with OLTC

DG SETS:
2No’s 625KVA DG sets.
Power
CAPACITOR BANKS WITH CONTACTOR
Distribution SWITCHES :
Capacitor duty contactor of the capacitor banks with harmonic
filters are planned

BUS DUCT RAISING MAINS :


Rising mains are planned with 100% redundancy along with
suitable tap offs at every floor with in the electrical shaft. Dual
source energy meters also proposed for each flat along with
Tap offs.
TAPOFF FLAT-1
TAPOFF BOX
FLAT-2
BOX
Raising mains
(Typical) TAPOFF FLAT-3
TAPOFF BOX
FLAT-4
BOX

END FEED
UNIT
As per IS 3043.

 Power System earthing i.e.. Body of Transformers/ DG sets / Panels/


Rising Mains and Neutral earthing of Transformers/ DG sets/ etc.,.
with earth Resistance not more than 1Ω.
Earthing  Grid (Mat) earthing is proposed for General Body & Neutral Earthing
of Electrical Equipment. Earth Mat is proposed in B4 level

 Main PCC and Electrical panels/ Raisers and UPS Bodies are
proposed to be connected to Earth mat using 50X6mm GI strip.

 Communication equipment are proposed to be earthed with copper


wires and Earthing terminal bars.
Earthing

 25mm dia MS rod at 300mm below FFL and1000mm spacing


between two rods


GRID EARTHING

Earthing
TERRACE FLOOR

17
TH FLOOR -FLATS

Lightning BUILDING
COLUMN

Protection
 LP is planned based on IS IEC/IS 62305, using conventional type system with
FIRST FLOOR

Roof Conductors STILT FLOOR

CELLAR-1
CELLAR-2
 All horizontal grid on Terrace interconnected so that no part of the roof is more
CELLAR-3
than 9M away from the nearest horizontal conductor

 Roof Conductors are proposed to connect with columns. Columns are used as
Down conductors.

 Resistance of Columns shall be less than 0.2Ω

 Earth resistance value shall be less than 10Ω


Roof Conductor

COLUMN

Terrace Floor
Level

Lightning Upper Level


Floors Slabs

Protection Lower
Basement Slab

Reinforcement
in Raft Slab

Reinforcement rods welded


with Main Grid reinforcement
rods, which are laid in raft slab
 External lighting to be decided based on architect’s /
landscape consultant’s schemes, however

 Main roads planned with 9M long poles with 60W

 LED street light fixtures.


External  Facade lighting for building elevation to be Provided.
Lighting  All fixtures with UG cables and time switch control

 Based on final Landscape consultant`s designs, the plan


will be updated
External Telephones/ TVs/ Internet:

External  Only sleeves provisions for all flats, to extend the


cables by service providers
Communications Intercom :

 Intercom systems proposed for each flat and also


for main security.
L
D 3RX2.5Sq.mm
3RX1.5Sq.mm
3RX1.5Sq.mm
LSB F
I 3RX1.5Sq.mm
5A
S
T
Internal
B
R O 3R X 4Sq.mm 3RX2.5Sq.mm
6R X 6Sq.mm 15A
15A 15A
I A
Distribution B
U
R
D 3RX2.5Sq.mm
GEYSER
GEYSER
T
SIZE SUITABLE FOR C.L
I
O
FRLS COPPER CONDUCTOR WIRES N AC CENTRALIZED
FIRE RETARDANT PVC CONDUITS
 Power supply planned with copper conductor flexible wires through
PVC conduits from shaft to flat DB’s.

Internal  Planned FRLS Copper Conductor Wires With Fire Retardant Heavy
Distribution Gauge PVC Conduits.
 Planned Bus Duct Rising Mains Through Dedicated Ducts Instead Of
Copper Wires Vertically.

 Earthing wire is proposed for all points


INTERNAL
ELE
INTERNAL
ELE
JCAT6
CAT6 J
U EXT
EXT U O
T OFC N
N F
E CABLE CAT6 C
CAT6 C C
L INTERNET T
INTERNET
Comm
T
I
I CAT6 INTERCOM
CAT6 INTERCOM O
O INTERNET N
Network INTERNET N

INCOMING CABLES
RG11
RG11
CAT6
CAT6

RG11
RG11
DTH
CAT6
CONVENTIONAL OFC BASED
Plumbing
Systems
 WATER BALANCE DIAGRAM

 SCHEMATIC FOR WATER SUPPLY

Plumbing  WATER DISTRIBUTION SYSTEM

Systems  SANITARY SYSTEM

 SEWERAGE TREATMENT PLANT

 RAIN WATER/ CELLAR DRAINS


Water
Balance
 Source of water is from bore well , Municipal water and provision for
Tanker water.

 Raw water shall be treated with necessary water treatment for Domestic
water usage as confirming to IS:10500-2012.

Water  STP treated water shall be used for toilet flushing , gardening / irrigation

Distribution water mains


 Water meters are proposed for all critical utilities/incoming/outgoing

 Air releasing valves & water hammer arrestors are proposed

 Pressure regulating valves(PRV’s) are used for control the excessive


pressure

 Composite pipes are proposed for internal water supply pipes as


conforming to is -15450 -2004
 As per NBC 2016, Max pressure to be controlled up to 4.1bar but
it is preferable to limit it to 3.6bar..

 Energy efficient motors for water lifting pumps with stand by


pumps to minimize down time during break down of the pumps

 Max Residual pressure envisaged is 1.5bar


Water  For easy maintenance ,individual ball valves are planned for
Distribution each water closet point

 GI pipes & grooved fittings/couplings are proposed for external


water supply as conforming to IS -1239

 Proposed gravity water distribution for Domestic purposes

 Proposed in line boosters for top four floors water distribution


with separate water mains

 TWO Sets of Hydro Pneumatic systems for Flushing water.


DOMESTIC WATER SCHEMATIC
DWS FIRE
1) DOWN COMERS TYPICAL PRESSURE RANGES OHT OHT
FROM 1.5KG/SQCM TO 3.4KG/SQCM
RMS

DOWN COMER 1 FLOOR 17 PRV


FROM BOOSTER
PUMP FLOOR 16
FLOOR 15
FLOOR 14

Domestic
FLOOR 13
FLOOR 12
FLOOR 07
FLOOR 10
FLOOR 06

Water
FLOOR 08
FLOOR 05
DOWN
COMER 2 FLOOR 01

Distribution
DOWN
COMER 3

W
T
P
FROM
BOREWELL RAW WATER FROM MCH
BORES SOFT WATER FOR 1.5 DAY’S STORAGE
1.5 DAY’S STORAGE
@160 CU.M
@235 CU.M
FLUSH WATER DISTRIBUTION
1) VERTICAL RISERS 1& 2TYPICAL PRESSURE
RANGES FROM 1.2KG/SQCM TO 3.4KG/SQCM

Flush VERTICAL
RISER 3

Water VERTICAL
FLOOR 17

Distribution
RISER 1
FLOOR 12
FLOOR 9 FLOOR 11

FLOOR 5 FLOOR 10

FLOOR 4
FLOOR 2
FLOOR 1
RM RM

HP-1 HP-2

FROM STP STP TREATED WATER STORAGE


@120 CUM
 Solar Hot water proposed for top floor units only

 No of Top floor units =24 no’s

 Quantity of hot water for each unit : 200 ltrs/day

Hot  For every Top floor apartment, solar hot water system is proposed as
dedicated system with Water and Backup power drawn from respective
Water unit

 However Geysers provision is also made


 Type of sanitary fixtures , CP fittings & accessories : Shall be as per
architectural layouts.

Fixtures  As per IGBC,CP faucets discharge should be as follows

 Flush valve– 6/3 lpm @ 3.0 bar pressure


 All faucets – 6 lpm @ 3.0 bar pressure
 Single lever divertar – 6 lpm @ 3.0 bar pressure
 Sanitary system shall be designed as per NBC 2016, BIS & UPC
standards

 Modified two stack system for sewage disposal 110mm diameter


pipes for both soil & waste water pipe
Sanitary  Anti Siphonage pipe for separate soil venting
system  UPVC pipes are proposed with lubrication & rubber ring jointing as
per Is:13592 standards

 Sewer lines within toilets to be taken in a suspended manner from


floor below & minimum of 50mm sunken is required for tile drop
 Proposed wall mounted ewc’s with concealed flush valves

 Proposed 100mm deep sunken for balconies / sit outs

Sanitary  Proposed 150mm deep sunken for kitchen utilities

system  Weep pipe for utility in sunken area.

 Proposed Aqua guard point above the kitchen sink.


STP
 Floor traps are proposed for basement & Stilt floor drains and collected
in to the 75mm dia. pipe & drop to the basement -3 for connecting to the
surface drain

 Surface drain collected within trench all along basement -3 periphery,


with catch basins at certain locations and provided with pumps to drain
Rain water to storm water drains outside with automatic pumps

Water &  Rain water pipes from roof top shall be 110mm dia rain water pipes
through sanitary ducts ( 110mm dia : 168.6sq.m area coverage)
Cellar connected to the recharge pits

Drains  Propose sub soil drain for lower basement floor, however same shall be
confirmed by the structural consultant

 Rain water recharge pits will be provided as per GHMC approvals


Rain water
Recharge
Fire & Life
Safety
Systems
 Fire fighting is the act of extinguishing fires.
 Firefighter suppresses and extinguishes fires to prevent loss of life
and destruction of property and the environment.
Fire Fighting  Fire fighting is classified as follows

System
Detection
System
Active
Suppression
FIRE System
FIGHTING
Protection
Passive
System
FIRE PROTECTION SYSTEM
 Following are the requirements for fire protection system as per NBC 2016, part-IV for
Residential occupancy building (A-4 category) with height above 45.00mt but not
exceeding 60.00 mt. : (Each tower shall consist of following fire safety measures)

FIRE PROTECTION SYSTEM AS PER NBC 2016 PART - IV


FIRE EXTINGUSHERS REQUIRED
HOSE REEL REQUIRED
WET RISER REQUIRED
DOWN COMER NOT REQUIRED
YARD HYDRANTS REQUIRED
AUTOMATIC SPRINKLER SYSTEM REQUIRED (IN ENTIRE BUILDING)
MANUALLY OPERATED FIRE ALARM SYSTEM REQUIRED (IN COMMON AREAS)
AUTOMATIC DETECTION SYSTEM NOT REQUIRED
FIRE PROTECTION SYSTEM
 Following are the requirement for fire protection system as per NBC 2016, part-IV for
Residential occupancy building (A-4 category) :
FIRE PROTECTION SYSTEM AS PER NBC 2016 PART - IV
U/G FIRE WATER TANK (See Note Below) REQUIRED (200KL CAPACITY) x 2 No’s (common for all
blocks)
FIRE PUMPS (See Note Below) REQUIRED WITH FOLLOWING x 2 No’s pump sets
2 NO’S 2280 LPM ELECTRICAL PUMPS
1 NO 180 LPM JOCKEY PUMP
1 NO 2280 LPM DIESEL ENGINE PUMP
TERRACE TANK REQUIRED (10KL at each block terrace level)
TERRACE PUMP NOT REQUIRED

Note: One sump along with a set of pumps shall be provided for each 100 hydrants or
part thereof with a maximum number of two pump sets.
since the number of hydrants are exceeding 100 no’s, 2 sumps along with 2 sets of
pumps are required and to be considered for all the blocks.
FIRE PROTECTION SYSTEM
 Safety requirements for Residential occupancy building: (In each
Tower)
S.No Description Required Provided
LIFE SAFETY 1. No of staircases 2 2
SYSTEMS 2.
Aggregate Width of
2.75M 3.00M
staircase
All staircases Cross
Cross ventilated or ventilated & Lift
3. Ventilation of staircase
pressurized Lobbies are
pressurized.

4. Refuge area Balconies Required Balconies provided

All-round fire vehicle


5. 7.0M 7.0M
movement width

3000 sq.mt each


3 ZONES in each
6. Compartmentation compartment in
basements
basement levels
FIRE PROTECTION SYSTEM

 The portable fire extinguishers shall be provided as per NFPA 10,


standards for portable fire extinguishers. However, additional fire
Portable Fire extinguishers shall be provided as per requirement of local Fire
Extinguishers Services.

SL. TYPE OF FIRE EXTINGUISHER PROPOSED LOCATION


NO
1 ABC DRY CHEMICAL TYPE 5KG STAIRCASE LANDING AND OTHER AREA
2 CO2 TYPE 4.5KG ELECTRICAL ROOMS & OTHER AREA
3 AQUEOUS FILM FORMING FOAM GENERATOR ROOM AND FUEL PUMP ROOM
(AFFF) STORED PRESSURE TYPE 9LTS.
4 CLEAN AGENT TYPE 5KG. FIRE CONTROL ROOM / SERVER AND DATA
STORAGE AREA
FIRE PROTECTION SYSTEM

 1 No. of Wet riser for Block-A & 2 Nos. of wet risers for Blocks B,C
& D are required and considered as per the floor area and travel
Fire Fighting distances requirements
Systems  Wet risers are planned with 150 mm dia MS class-B pipes for
Sprinkler & Hydrant systems.
 Internal hydrant system planned in entire building as per IS : 5290
& NFPA 24.
 One number of single headed hydrant valve is provided at every
fire shaft with a Hose box consisting of 2x15Mtrs RRL hoses and a
branch pipe.

systems.
FIRE PROTECTION SYSTEM

Pump Head Calculation:


 Total height of the building – 53.70M (from stilt floor to 10th floor level)
PRESSURE  A minimum of 3.50 kg/cm2 of pressure required to be provided at the
REGULATION farthest/last hydrant point. (I.e. in the terrace floor last hydrant)
 Basements height – 2.90M
 Plus, a minimum of 10% of Hydraulic pressure loss is considered in the
entire system. ( However Hydraulic calc is also provided with DBR)
 = (53.70+2.90+35.0) x 1.1 = 100.76MWC
 So, the fire pumps are selected with a head of 100 MWC @ 10.0 kg/cm2 to
deliver the necessary pump pressure.
FIRE PROTECTION SYSTEM

 Hydrant system is manually operated which can deliver water to


Internal suppress fire

Hydrant  Hose reel drums with 36m length hose reel planned near every fire shaft

System as per IS: 884


FIRE PROTECTION SYSTEM

 External hydrant system (Yard hydrant system) provided as per IS


: 13039
 Yard hydrant system is provided around the building with spacing

Yard Hydrant of 22.50mtrs from hydrant to hydrant.


 The minimum spacing of the hydrant point should be 2.00mtrs
System away from the face of the building and maximum limited to
15.00mtrs as per standards.
 Ring main piping is provided with 150 mm Dia MS ‘B’ class which
is connected from pump house.
FIRE PROTECTION SYSTEM

 Sprinkler system proposed in the entire building as per IS :


Sprinkler 15105 & NFPA 13

System  Sprinklers system is designed considering the building in to


Light Hazard for Typical Floors & Moderate hazard occupancy
for Basements.
 Coverage planned for each sprinkler is 16sq.mt. in typical
floors & 9 sq.mt. in the basement floors.
 Piping for sprinkler system is provided with MS ‘B’ class in
entire building
FIRE PROTECTION SYSTEM

 Sprinkler system is provided with a flow switch & a butterfly


Sprinkler valve at every fire shaft tapping
System  Tamper switches are planned for Valves at Tap off points
monitored through FAS
 Flow switches are provided to be connected to sprinkler
annunciation panel which is in turn connected to fire alarm
panel.
 2 No’s of U/G sumps of 200kl capacity each are provided at Basement-1
level for sprinkler & hydrant systems at different locations.
 Terrace tank of 10 kl capacity is required & provided at terrace level.

Fire Sump &  Fire pump room is provided with following fire pump capacities:

Pumps  2 no’s of 2280 lpm @ 100m head electrically driven End suction Back
pull out pumps for sprinkler system & hydrant system.
details  1 no of 2280 lpm @ 100m head common stand by diesel engine
driven End suction back pull out pump.
 1 no of 180 lpm @ 100m head jockey End suction back pull out
pump.
 Positive suction is provided for fire pump room at Basement-1 level.
Brigade  1 no. 2 Way brigade inlet is connected to hydrant riser in each
shaft.
connectivity
details  4 way brigade inlet is directly connected to fire sump.
FIRE PROTECTION SYSTEM

 Fire charts indicating the fire safety precautions and fire plan
with escape route shall be finalized later

Fire Signages

Conventional Fire Conventional Fire alarm system is provided in each tower.
 Fire alarm panel is provided at ground floor in FCC room.
Alarm System  2core x 1.5 sq.mm ATC armoured FR (fire resistant) cable
 Heat detectors are provided in electrical room & Smoke
detectors in Service room areas.
FIRE ALARM SYSTEM

 PA system is provided with adequate speakers at all locations


and control.

Public Address  Automatic evacuation annunciation in case of fire emergency

System  Floor wise speaker allocation for respective floors


 Public address system integrated with fire alarm panel for
annunciation
FIRE ALARM SYSTEM

 As per NBC 2016 FCC room of minimum 12 sq.mt. shall be


provided at stilt floor main entrance in each block.

Observations
 TDR document shall be provided for Fire Approval
submission.
LPG Gas
Reticulation
Insert the Sub Title
of Your Presentation
 LPG reticulation planned with domestic (14.2kg) cylinders.

 2 no’s gas bankS of size (11.0m x 2.5m) planned to accommodate one


LPG GAS working and one standby bank with a fire rated partition wall between the
RETICULATION banks.

SYSTEM  Bank capacity shall not be more than 1000kgs as per CCOE / NBC/ is 6044/
OISD 162 guidelines.

 Bank with 60 no’s cylinders each for 10 days of refill capacity so that
capacity is less than 1000kg for working.

 Gas bank of the same capacities planned for standby with Auto
Changeover
 From the bank, main gas pipes are taken through flat utility duct area.

 Gas meters with pulse output / pre-paid meters planned in utility duct of
LPG GAS kitchen for every unit
RETICULATION
SYSTEM
LP GAS RETICULATION SYSTEM
LP GAS RETICULATION SYSTEM
ACMV
Systems
 SCOPE OF DESIGN

 ACMV SYSTEM DESCRIPTION


ACMV
 ACMV SCHEMES
Systems
 MECHANICAL VENTILATION SYSTEM

 SMOKE MANAGEMENT SYSTEM


Scope of design Flats are planned with DX Units

Mechanical Ventilation System


Conventional (Direct Expansion) Type of Air Conditioning System:

 Building Blocks are planned with HVAC DX-System for all the floors.

 The indoor units shall be Hi-wall split units / cassette units, Fan coil
units or ducted type depending upon the internal
Architectural/interior layouts.

ACMV system  The outdoor units shall be located at Floor level/ceiling supported
level based on the Architectural/Client confirmed locations.
description for
 Each Indoor unit is connected to the respective dedicated Out Door
Residential Unit with copper refrigerant piping (i.e. Liquid and Gas Pipe).
Conventional (Direct Expansion) Type of Air Conditioning System:

 Each Indoor unit drain pipe is connected to nearest drain point which
should be concealed in the floor and further connected to drain point

 In this Project, Fresh air is assumed as entry from the door


openings/Operable Windows, there is no separate Fresh Air systems
are planned.
ACMV system
 DX-system individual AC split units are planned only for Bedrooms,
description for Living, Dining and Drawing rooms in each flat of all Blocks and the
corresponding AC load approximately 1.5 TR to 2.0 TR for each AC
Residential Unit.
 TYPICAL FLAT ACMV SCHEME WITH INDOOR & OUTDOOR LOCATIONS:

ACMV
Schemes
 BASEMENT VENTILATION SYSTEM:

 Basement 2 is bifurcated into 2 zones and basement 1 is bifurcated into 4


zones.
 Each zone is planned with one blower room and jet fans.
Mechanical  Exhaust air for basements is designed for 6ACPH in normal mode ,12ACPH in

Ventilation fire mode


 Normally blowers to operate at 6ACPH
System  Noise levels for Axial fan & Centrifugal fan are 85DB and 75DB respectively
 Jet fans & AXIAL FANS are controlled by PLC PANEL
 Jet fans are provided to move exhaust air up to the exhaust shaft, then
further the same is moved by Axial fans
 BASEMENT VENTILATION SYSTEM:

 All blowers operated through timer based & can be integrated with BMS/
Mechanical fire panel

Ventilation  In Fire Mode, Fire panel signal will supersede the operation of the basement
ventilation system
System  As per NBC Fresh air to be planned with fresh air cut-outs with an area
equivalent as 2.5% of the basement floor area.
Note:-(Given ventilation cutouts is above 2.5%. So, forced fresh air ventilation is
not provided.)
 BASEMENT VENTILATION SYSTEM:
JET FANS OPERATION:
 6ACPH in normal mode. Total 12ACPH in emergency mode.
 Extract fans, 2 of 50% duty each
 Rated for 250°C / 60 mins
 Generally mounted at celling level
 Jet fans fully assembled for easy installation
Mechanical  High / low speed operation
Ventilation  Final locations to be confirmed based on CFD

System
 BASEMENT VENTILATION SYSTEM SCHEMATIC:

FIRE IN CELLAR PLC PANEL ELECTRICAL PANEL

Mechanical TIMER CONTROL


Ventilation
System
OUT OF
CELLAR

EXTRACT FANS JET FANS


TYPICAL BLOWER ROOM

Mechanical
Ventilation
System in
Basement plan
 FACILITIES PROVIDED WITH MECH. VENTILATION SYSTEM:

 Pump Rooms, DG Room, LT Panel Room, Electrical Panel Room and Battery Room

 Toilets & STP Room etc..

(Note: Toilets & STP shall be maintained negative pressure to prevent spreading of
foul smell / air.)
Mechanical
Ventilation Sl. No. Service No. of Air changes / hour

1 Toilets 12
System 2 Utility -Plant rooms, pump rooms 12

3 Switch Gear Rooms 6

4 S.T.P 30 ACH

5 Staircase/ Lift lobby pressurization


VENTILATION:

 Planned with 30 ACPH

 Using Blowers and PVC Pipes/FRP ducting


STP Ventilation
 Working and Standby Blowers
System
 Fresh air from Lower Basement itself

 Proposed to be left at ground level with carbon filters


 SMOKE MANAGEMENTSYSTEM:
 Staircase are cross ventilated
 Lift Lobby Pressurization

Smoke
management
NBC Staircase & Lift Lobby Pressurization Criteria
system
ELV
Systems
 IP CC SURVEILLIANCE SYSTEM

 ACCESS CONTROL SYSTEM

 BOOM BARRIER SYSTEM

 SOLAR PERIMETER FENCING SYSTEM


ELV SYSTEMS
 BUILDING ENERGY MANAGEMENT SYSTEM (BEMS)

 VDP (VIDEO DOOR PHONE) SYSTEM

 FTTH (FIBER TO THE HOME)-GPON


 Security Surveillance system is proposed with IP Cameras to Cover all the
Common areas.
 POE Dome cameras are proposed for all Main Entrance Lobbies, Lifts and
staircase Lobbies , Security Room, LMR Room’s, Terrace Lift Lobbies and other
Closed services rooms like Electrical Room, BMS Room, Maintenance office,
Clubhouse Entrances, Communication Room & Store rooms.
IP CC  POE Bullet cameras proposed for external Periphery areas, Transformer Yards,

Surveillance Ramp Entry / Exit from Basements, Stilt floors, Site plan Main entrance/exit
gates for both sides, Internal / External drive way areas & Services rooms like
Electrical Panel Rooms , Water Pump Room, fire pump room, Chiller plant
room and DG room.
 All cameras are proposed to be monitored from BMS / Security Room. Also
Date:29-11-2018.
can be remotely viewed on LAN / WAN.
 NVR Backup is planned for 30 days recording capacity.
 Wiring for internal Cameras are with unarmoured CAT6 Cables, &
External Cameras are with Armoured Cat6 Cables / OFC cable.
 POE (Power Over Ethernet) Gigabit Ethernet switches 4/8/16/24 are
planned for connectivity of cameras at multiple locations and all switches

IP CC are interlinked with Optical fibre cable Backbone structure.


 32” LFD ( Large Format Display ) monitor is considered for viewing of
Surveillance cameras, which shall be capable of running the monitor 24/7.
 Analogue HD Dome cameras are proposed inside in Passenger & Services
Lift Cars.
 HD DVR’s are proposed with 1 month recording Backup for Lift cameras.
Date:29-11-2018.
IP CC Surveillance

DOME CAMERA BULLET CAMERA OUTDOOR CAMERA


 Door Access System is proposed at Electrical rooms, Pump rooms, Panel
rooms and LMR Rooms with Entry Card readers & Exit switches.
 Door Access System is proposed at COMM./BMS Room with Entry and
Access Exit Card readers along with Emergency Glass Break switch.
 Access doors will be integrated with fire alarm system in order to
Control deactivate the doors in case of fire emergency.
System  Tripod Turnstiles with Card / Biometric reader is proposed at Main Gate
Pedestrian Entrances, for services Staff & Maids In / Out Tracking.
 2 / 4 Reader Access controllers are proposed for access control system.
Access Control System
Automated  2 no’s of 3.5Mtrs. motorized automatic Boom Barriers are proposed at
site plan for entry & exit for four wheeler entry.
Boom Barrier  2 no’s of 1.5 Mtrs. motorized automatic boom barriers are proposed at

System site plan for entry and exit for two wheeler entry.
 For Visitors, Operation of boom barrier is with remote control by
security.
 Camera for monitoring the Entry & exit of vehicles and personnel is
considered in CCTV Package.
 Solar Fencing Perimeter Protection System is proposed on Compound wall .
 The system will operate as a psychological and physical barrier for the
Trespassers.
 Total Length of the fence is divided by no of Zones, hence the Trespassers shall
be quickly identified.
 Each zone length is considered maximum up to 200 meters.
Solar Fence  Main Control Panel is located at the Main gate Security Room, provided with
Hooter for alarm intimation.
System  Energizer sends short pulses for 0.3 mille seconds duration of 4 to 9 KV in an
interval of 1.2 seconds, which causes shock and fear in intruders
 12V / 90 AH Battery (Reputed Make) along with electronic system will be kept
in a protected place, preferably near Security Cabin.
 12V / 74Wp Solar PV Module of reputed make will be supplied, which can
generate the required power. Battery shall provide a backup of more than 48
Hrs.
 In the event of complete darkness or solar power input failure,
Auxiliary supply of 230V AC shall be provided by User.
 THE SYSTEM CONSISTS OF THE FOLLOWING:
 Main Controllers, Monitoring and Reporting Unit & Fence
Energizer

Solar Fence  Fence Voltage Alarm


 Battery
System  Solar Module
 Fence accessories
 Earthling mechanism.
 Building Energy Management System is proposed to Monitor Live Parameters & to Maintain
the records of Energy, Water, Gas meters .
 Provided Billing software module, the Bill is generated based on the Owner’s / customer
usage.
 All Meters are Looped with RS 485 communication and are connected to the nearest

BEMS Ethernet switches with required convertors.


 The Meters with out RS 485 direct output are connected to an Pulse controllers and are
converted from Pulse to RS 485 Output.
 Ethernet Switches are provided in the Basement-1 Communication Room, for connectivity
of the meters.
 4/ 2 core 1.5 Sq.mm. Shielded Cables are used for Looping of the meters of RS 485 Output.
 CAT6 cables are Used to connect the Pulse Output meters to pulse to RS485 convertors.
 Cloud Based Tool shall be added to the BEMS software, in which the parameters shall be
monitored in Mobile / Tab / Laptops ( Optional).
BUILDING ENERGY MANAGEMENT SYSTEM

BEMS
 Video door phone can be placed in living or drawing room.
 Door phone camera at the main door entrance.
V D P System  Multiple VDP’s up to 3 no’s can be placed in different areas.
Standalone  Provision to connect gas leak detector, panic button, cameras etc.

Electro Magnetic Lock


Door Camera

CAT 5/6 CABLE

VDP

DigitalDoor Lock
VIDEO DOOR PHONE SYSTEM – INTEGRATED ( OPTIONAL)
 All The Services In Integrated In Single Fiber.
 HD ready as higher band width supported up to 50mbps-100mbps per user.
 Voice is integrated in optical line terminal equipment with sip application
server.
 IPTV easily supported on FTTH.

FTTH 
FTTH supports up to 20kms from end to end device.
Low maintenance as all are centrally configurable & managed devices.
System
FTTH
System
FTTH
System