Professional Documents
Culture Documents
Arvind.
We are one.
Yet, we are many.
• They are a fashion powerhouse that is also building new age homes ; they are a global leader in
apparel manufacturing that is also transforming water management;
• Today, the fabric made by Arvind can go around the earth 6 times over.
2 pieces of apparel are sold by an Arvind managed brand, every second in India.
Arvind owns 22 global patents for environmental solutions, and is the largest fire protection
fabric producer in the country.
• History has been witness to the Arvind Group's commitment to excellence, innovation,
perseverance and undying attention to customer and societal needs.
POLICY
FOR ARVIND
“ QUALITY IS AN INVESTMENT “
PROJECT IN DENIM
TROUSERS
IN DENIM FINISHING
• The garment industries are always trying to improve production and the quality of the garments
to sustain in the enormous competitive market. The sustainability and profitability of garment
industry is governed by the productivity of that industry.
OPERATIONS CARRIED OUT IN
FINISHING
• Loop cutting • Measurement checking
• Trimming • Tagging
• Dusting • Match book
• Leather patch attach • Final checking
• First checking • Folding
• Rivet & shank attach PACKING
• Closing of zipper • Labelling
• Pressing • Insert into polybag
• Topside checking • Closing polybag
• Presentation checking • Final label & final packing
1
To Redesign the workstation
OBJECTIVE 2
To Implement kaizen
S
3 To Implement method of
standardization
• The importance of a layout would be better appreciated if one understands the influence of
an efficient layout on the manufacturing function: it makes it smooth and efficient.
Operating efficiencies, such as economies in the cost of handling materials, minimization of
production delays and avoidance of bottlenecks all these depend on a proper layout.
RESULT COMPARISON
• EXISTING LAYOUT • PROPOSAL LAYOUT
• Existing layout of finishing department • Proposal layout can produces 7500 garments per day
produces 6000 garments per day. • They will have 3 lines where one line produces 2500
• They had two lines where one line produces garments per day.
3000 garments. • Using capacity study for each person , I had designed the
proposal layout with required people for each operation,
• Existing layout has some operations in a utilized that unwanted spaces and made centralized
centralized one, some spaces which is not in use operations into single operation for each line.
and no required space for storing the packed • Packing area – 73*46 feet in length
garments.
• Finally we can get some extra spaces for storing packed
• Packing area – 63*46 feet in length garments and increase of 1500 production.
• Operators required - 166 • Operators required - 179
OPERATORS
REQUIRED/LINE
• CAPACITY CALCULATION.xlsx
EXISTING LAYOUT OF FINISHING- 1 ST
FLOOR
• The total area of trimming(1st floor) is 107 FT * 26 FT.
• All the operations are centralized one.
Utilize operator’s time as much as we can. There is no better alternative than just stopping
operators sitting idle to improve operator productivity. Start eliminating non-productive time
as much as possible.
RIVET
ATTACHING
• EXISTING:videos\Newfolder\6.RIVET&SHANK\RIVET ATT 2.MP4
• PROPOSAL:videos\Riveting and eyeleting machines_HD.mp4
TURN IN AND OUT
• EXISTING:videos\Newfolder\TURN IN OUT.MP4
• PROPOSAL:videos\SUPER FULL PANTS-TURNER MACHINE_HD.mp4
FOLDING
• EXISTING:videos\Newfolder\FOLDING.MP4
• Proposal:videos\Trouser folding machine STP 1000( THERMOTRON).mp4
3D EFFECT
• EXISTING:images\3 D EFFECT.jpg
• PROPOSAL:videos\Metod Makina 3D Vacuum Machine.mp4
COMPARISON
OPERATIONS MANUAL( 1 labor) AUTOMATIC
TURN IN AND OUT Major problem for every employees. Can satisfy employees
Increase of production
Motivation Is
Simply Mean Like
IN WHAT WAYS MOTIVATION IS
GOING TO PLAY A ROLE IN THIS
INDUSTRY?
TYPE OF
MOTIVATION TO BE
DONE
PRIZE THEM
IDENTIFY THE
INFRONT OF
BEST AND
ALL
PERFECT
EMPLOYEES IN
WORKER
A MEET
FIX THE
SELECTED
PEOPLES
SNAPS IN
FRONT OF ALL
IN A BOARD
FOR THE
WHOLE WEEK
CRITERIA FOR SELECTING THE BEST
EMPLOYEE ?
• Instead of giving an over target to all operators working in a line, give a common target
considering overall operators skill level and capacity that can be done. Take care of operators
who are under target.Monitor the operator’s improvement and further give training if needed to
reach the imposed capacity deadline.
PRODUCTION DEADLINES FOR EACH
OPERATION PER HOUR