Presentation on

MBBR Base Bio-Chemical Effluent


Treatment Plant
for
Fair Electronics(Samsung)

Presented By
Water Link Bangladesh
(A House of ETP, STP, WTP, WWTP, Pump & all Pharma Machineries Solutions )
About US
We are specialized in Water & Wastewater Treatment
Technologies. The company founded in the year of 2013 by Engr.
U Swi Ching Manna (Uchhas) and Engr. Yeakub Chowdhury.
The founders of the company have over seven years of work in
this field and the combined experience exceeds thirteen years.
The company has expertise in all aspects of Water &
Wastewater Treatment area including creative Design, Erection
and Commissioning. Our experience has taken from our
previous work and strength to you, acknowledge for
professionalism, quality, reliability and service.
About US
Our Vision: To be a specialized organization in Water & Wastewater
Management Technologies in the country and all over world .

Our Mission: To be a partner & industrial community by optimizing


globally environmental threat through appropriate management of water &
wastewater for green employment, social well-being and ecological health.

Our Values: Our core values that will steer the Water Link
Bangladesh in pursuit of its own vision and mission include Integrity,
excellence service, professionalism, and mutual respect.
Table of Contents

• Design Background
• Treatment Levels & Mechanisms of proposed ETP
• Process Flow Chart
• Sludge management
Engineering Design Background
Parameter Inlet to ETP Outlet from ETP

pH 4.0 – 4.5 6 to 7.5


BOD 180-300 mg/l <30 mg/l
COD 350-400 mg/l <100 mg/l
TSS 200-450 <20 mg/l
TDS Approx. 600 - 800 2100 mg/lit
DO 1.2 - 2 4.5
Temperature 350°C
Treatment Levels & Mechanisms
of proposed ETP
Treatment Levels:
 Preliminary
 Primary
 Secondary
 Tertiary Treatment (Advanced)
Process Flow Chart of Proposed ETP Base on Treatment Level
Effluent from Factory Bar Screen
Preliminary
Treatment Unit
pH Correction Equalization Tank

Pac Dosing Coagulation Tank


Primary
Poly Electrolyte Dosing Flocculation Tank Treatment Unit
Lamella Settler (Pri. Clarifier)

MBBR Tank- 1 Sludge


Sump
MBBR Tank- 2
Secondary Sludge
Treatment Unit Drying Bed
Lamella Settler (Sec. Clarifier)

Clarified Water Tank

Pressure Sand Filter Tertiary


Treatment Unit
Activated Carbon Filter Post Aeration
Preliminary Treatment Unit

Bar Screener
Equalization
PH correction unit
Preliminary Treatment Level
Bar Screener

Fig: Bar Screener


Preliminary Treatment Level
Equalization Tank

Fig: Equalization tank


Primary Treatment Level
pH Correction:

Fig: pH Correction Unit


Primary treatment Unit
Coagulation chamber
Flocculation chamber
Lamella tube settler
Primary Treatment Level
Coagulation & Flocculation Tank 

Fig: Coagulation and Flocculation tank


Primary Treatment Level
Lamella Tube Settler (as Primary clarifier)

Fig: Lamella tube Settler & Lamella Tube pad


Secondary or Biological Treatment Unit
MBBR tank 1 &2
Lamella tube settler
Secondary Treatment Level
Moving Bed Biofilm Reactor (MBBR)
 Advanced waste water treatment solution for the high-strength wastewater.
 Economical solution of wastewater treatment sector.
 Significantly increase the capacity and efficiency.
Secondary Treatment Level

Fig: The Moving Bed Biofilm Reactor reference picture


Secondary Treatment Level
Lamella Tube Settler (as secondary clarifier)

Fig: Lamella tube Settler & Lamella Tube pad


Tertiary Treatment Unit
Clarified Water Tank
Filtration Unit
Post Aeration (optional)
Tertiary Treatment Unit
Clarified Water Tank

Fig: Clear water tank


Tertiary Treatment Level (Advanced)
Filtration Unit
Multi Graded Filter (MGF) & Activated Carbon Filter (ACF)

Fig: MGF & ACF Filter


Post Aeration (optional)
Post Aeration

Fig: Post aeration


Sludge management Unit
 Sludge sump
 Sludge drying bed
 Sludge disposal

Fig: Sludge disposal unit