Professional Documents
Culture Documents
Presented By
Water Link Bangladesh
CONTENT
1. Balance Tank
2. Treatment Tank
Dosing Unit:
• Poly Aluminum Chloride Tank
• Sodium Hydroxide Tank
3. Effluent Tank
4. Sludge Tank
Flow Chart of ETP:
Waste water from Factory
Balance Tank
Treatment Tank
Micron Filter
Selected
Dumping Area
Drain
Balance Tank
Working Principle:
Equipment's:
Gear motor & Agitator
Dosing Chemicals:
• Sodium Hydroxide/Caustic Tank: To make the required PH of the
effluent for proper chemical reaction.
• Poly Aluminum Chloride (PAC) Tank: To remove color & settles the
suspended matters.
Effluent Tank
Working Principle:
After proper settling, Sludge from the bottom portion of the
Treatment tank shall be drained periodically into sludge Tank.
Sludge Drying Bed
Methodology:
It separates the water from the sludge.