Design Approach
The Wastewater generated from the apartment is classified as Sewage and Sullage; sewage is the
wastewater generated from water closet, where sullage is the wastewater generated from
Kitchen, Bathrooms and Wash Area. It should be treated separately because of the difference in
its characteristics. A separate system is proposed for the treatment of wastewater generated.
Design Parameters
Design Capacity of STP = 10,000 litres per day
Influent Characteristic
Parameters Units Value
Biochemical Oxygen Demand (BOD5) mg/l 150
Chemical Oxygen Demand (COD) mg/l 750
pH Units 6.00-7.00
Total Suspended Solids (TSS) mg/l 200
Total Dissolved Solids (TDS) mg/l 1000
Total Organic Nitrogen (Kjeldhal) mg/l >35 <55
Oil and Grease mg/l >10 <20
Process Description
1. Screening of Sullage
Sullage will be screened for separating floating as well as coarse particle present in the
wastewater. The particles deposited on the screen shall be cleaned manually. Screening should
be properly done for the protection of pumps and plumbing line. Screened solids shall be
collected and separated from plastic or non-biodegradable materials. The non-biodegradable
solids shall be subjected to land filling or sanitary land filling or dried and incinerated. After
proper screening the sullage will be channeled to grit cum oil separator
4. Flocculation Tank - 1
A mild dose of coagulant will be used for the production of larger floccs from the suspended
impurities and other organic matter present in the water coming out from the oil separator.
Thorough mixing is attained using air which will enhance the effectiveness of flocculation. Over
flow from the flocculation tank is then routed to the Settling Tank - 2
5. Settling Tank - 1
Over flow from the flocculation tank 1 is held in the settling tank 1 for a predetermined
hydraulic retention time, in which the coarse particle will settle down under gravity. There is no
chemical addition anticipated in this unit operation. The solid content present in the wastewater
may settle down under gravity and the clear water rise up. This clear water shall be overflown
to the flocculation tank -2. Solids settled at the bottom of the settling tank shall be pumped out
and dried in sludge drying bed.
6. Flocculation Tank - 2
Overflow from the settling tank 1 is connected to flocculation tank 2. A mild dose of coagulant
will be used for the production of larger floccs from the suspended impurities and other organic
matter present in the water coming out from the oil separator. Thorough mixing is attained
using air which will enhance the effectiveness of flocculation. Over flow from the flocculation
tank is then routed to the SettlingTank -2
7. Settling Tank - 2
Over flow from the flocculation tank - 2 is held in the settling tank 2 for a predetermined
hydraulic retention time, in which the coarse particle will settle down under gravity. There is no
chemical addition anticipated in this unit operation. The solid content present in the wastewater
may settle down under gravity and the clear water rise up. This clear water shall be overflown
to the filter feed. Solids settled at the bottom of the settling tank shall be pumped out and dried in
sludge drying bed.
8. Filtration System
9. Disinfection System
Disinfection system consists of chemical dosing for the complete deactivation of any harmful
microorganism in the water. If it is required, two stages of chlorination will be done for the
effective disinfection of the treated water. Disinfection shall be done using sodium hypochlorite
solution. After adding hypochlorite into the filter feed tank, a predetermined time will be
provided to make enough contact time for the disinfectant to deactivate the microorganism
present in the treated water. Post chlorination can be done after the cartridge filtration unit.
Final effluent will be stored in a collection tank for reuse such as gardening, floor washing,
flushing, dripping in the urinals etc.
Sludge contains a high concentration of solids, but its water content is still high. Combined
primary and secondary sludge from an activated sludge treatment plant contains about 2 %
solids and hence 98 % water. One kg of dry sludge is associated with 49 L of water. Thickening
is carried out in a sedimentation tank or in a sedimentation pond. The latter is advantageous if
The sludge generated from both the settling tank shall be routed to sludge drying bed. There will
be three to four beds in series. The solid waste obtained from the settling tanks shall be pumped
to this sludge drying bed and will be allowed to be dried under the sun. There will be three to
four beds, in which the first bed will be charged and used for the first week. Like this, other beds
will be used for the proceeding weeks. The first bed will be dried with in the time taken for first
cycle. Dried sludge can be stored in cool and dry place for many years, which can be used as
manure.
Control System
B. Oil Separator
Length = 1.00 m
Width = 0.40 m
Depth = 0.75 m + (0.25 m Free Board)
Depth the hoper bottom = 0.25 m
L*W*H = 1.00*0.40*1.25
C. Equalization Tank
Length = 1.50m
Width = 1.25m
Depth = 2.50 m + (0.50 m Free Board)
L*W*H= 1.50*1.25*3.00 m
D. Flocculation Tank - 1
Length = 0.90 m
Width = 0.25m
Depth = 0.50 m + (0.25 m Free Board)
L*W*H= 0.90*0.25*1.00 m
E. Settling Tank - 1
Length = 1.15 m
Width = 0.90 m
Straight wall depth = 1.75 m + (0.25 m Free Board)
Cone Depth = 1.00 m
F. Flocculation Tank - 2
Length = 0.90 m
G. Settling Tank - 2
Length = 1.15 m
Width = 0.90 m
Straight wall depth = 1.75 m + (0.25 m Free Board)
Cone Depth = 1.00 m
C. Dosing System
Number of Dosing System = 1 set – 3 numbers
Accessories = Dosing Pump with Tanks
Dosing Pump = e-dose/UKL/Blackstone/Eqvt.
Tank = HDPE
K. Piping Work
One lot of PVC pipes with fitting and PP valves required for the above work
L. Electrification Work
3. Providing electrical power supply and cabling works up to the Control Panel.
4. Electrical works in our scope includes Panel board, 100 m cable work and Cu earthing.
And for extra distance ` 150/m for cable and `. 250/m for Cu earthing will be
chargeable.
Scope of work
Delivery
We shall design, manufacture and supply electro mechanical equipment within 45 days. The
above delivery period shall be reckoned from the date of receipt of the advance and
commercially as well as technically clear purchase order or completion of civil work mentioned
in the unit sizes, whichever is later
Completion
If the completion of work is delayed beyond the contractual date for reasons under your control
as listed out here under but not limited to them, we shall be entitled to suitable readjustments in
the period of completion by mutual consent and the contract will stand amended to that extent.
Warranty
Biocoenosis Envirotech has a strong Quality Management System to ensure that all the
equipment is duly checked prior to dispatch and tracked post-delivery. The equipment,
therefore, can be depended upon for long and trouble free service. Our liability in respect of any
defect or failure in the equipment supplied and commissioned by us or any loss, injury or
damage attributable therefore shall be limited to making good by replacement or repairs,
provided the equipment is operated and maintained in accordance with our instructions and
arise totally from proven faulty design, materials or workmanship. This warranty shall be valid
for a period of 18 months from the date of dispatch. Our liability in no case shall exceed the
invoiced value of the equipment supplied by us, and we shall not be liable for any consequential
damage or loss such as loss of profits, loss of business opportunities, damage to goodwill or
business reputation or any other contractual liability or loss suffered by the purchaser to third
parties. All warranties other than title either express or implied whether arising under law or
equity including warranties of merchantability and fitness for a particular purpose are excluded
from the contract. This is the essence of the contract.
Our offer for the Design, Supply of Erection and Commissioning of Sewage Treatment
Plant
: Rs.
2,85,000/-
(Rupees Two Lakhs Eighty Five Thousand Only)
Erection & Commissioning : The Civil work will be under client’s scope. One of our
Engineers shall be present for supervision of the civil work, free of cost.
We sincerely trust that you would find our above offer is much competitive and look forward to
the pleasure of receiving your esteemed work order.
Thanking You.
Yours Faithfully
(For Biocoenosis Envirotech,)
K R Haneesh Panicker
Chief Consultant and CEO