You are on page 1of 10

1

Technology Selection
Lecturer : Anuntasak Suksasilp
Lecturer: Charnyut Wetpanywong
Represented by
Wilasinee Seesongkram
Project
Launching
• Business and Market
1 Analysis

2 • Technology Selection

3 • Project Proposal

4 • Project Execution

5 • Review
2
Technology selection
SWOT analysis

Technology evaluation

Technical risk assessment


Get a modern PowerPoint Presentation that is beautifully designed. I
hope and I believe that this Template will your Time.

Economic evaluation
Get a modern PowerPoint Presentation that is beautifully designed. I
hope and I believe that this Template will your Time.

3
SWOT analysis

- Things your company


does well
- Qualities that separate
you from your competitors - Underserved markets
for specific products
- Things your company lacks - Few competitors in - Changing regulatory
your area environment
- Things your competitors do
better than you. - Emerging competitors
4
Technology Evaluation
Preliminary screening of options

Criteria
- Unit performance - Turn down
- Commercial - Impact on existing facilities
experience - Environmental aspects
- Product quality
- Reliability

Resource requirements
Raw materials
Land
Labors
5
Technology Evaluation
Prepare design study

-Generally 2-3 options only -Product qualities


-Process flow schemes -Basic equipment sizing
-Mass/heat balances -Impact on existing facilities

Prepare cost estimate


-Define required accuracy level
-Scaling of equipment, units or blocks
-Location factor
-Engineering Fee, Royalties, Catalyst
-Money of the day
6
Technical risk assessment
Hidden ‘Proto type’
-New process types
-New equipment/ catalyst types

Unusual materials
-New type of materials

Unit integration aspects


7
Economic evaluation
Evaluate parameters against based case

CAPEX OPEX
( Capital Expenditure)(Operating Expenses) Product yield
The difference
between the
Funds used by a
actual and
company to The money a
budgeted
acquire or company spends
proportions of
upgrade physical on an ongoing,
product resulting
assets day-to-day basis
from a
such as property, in order to run a
production
industrial business or
process,
buildings or system.
multiplied by the
equipment.
standard unit
cost.
8
Final report
 Terms of reference  Technical risk assessment

 Screening of options  Economic evaluation

 Design study  Functional value analysis

 Cost estimate  Final recommendation


Thanks!
Any questions?

10