10 Box Culverts 205,382,602.00 11 Pipe Culvert 40,002,093.00 12 VUP 322,766,089.00 Total Cost for project road length of 212.107 km 8,073,512,550.61 Total Cost per km 3.806 Cr Total cost of Road work per km (excluding VUP, Toe wall, RCC drain and Retaining wall) 3.369 Cr