km52/700 to km78/295, km80/562 to km103/780 including ECR Link (ODR) Cheyyur – Panayur Road from km 0/000 to km 4/720 to two
lane with paved shoulders and construction of bypasses for Vandavasi town from Km 47/367 to km 52/700 and Chetpet town from km 78/295 to km 80/562 and one realignment for Maruthadu village from km 42/660 to km 44/505 of SH-115 and maintenance of entire project stretch
design length of 109.273 km for 7 years (in the State of Tamil Nadu on Engineering, Procurement and Construction (EPC) Mode)"
1.A.1 (1) Earthwork up to top of the sub-grade 2.230% 1.270% 76,633,183 97.573 Km 785,393.32251 - 48.73 Km 785,393 38,269,860 48.85 Km 785,393 38,363,322
1.A.2 (2) Granular work (sub-base, base, shoulders) 27.900% 15.883% 958,773,900 97.573 Km 9,826,221.38922 - 48.73 Km 9,826,221 478,802,290 48.85 Km 9,826,221 479,971,610
1.A.3 (3) Bituminous works (DBM) 25.220% 14.358% 866,676,622 97.573 Km 8,882,340.62495 - 48.73 Km 8,882,341 432,809,812 48.85 Km 8,882,341 433,866,810
1.A.4 (4) Bituminous works (BC) 10.210% 5.813% 350,863,137 97.573 Km 3,595,903.95641 - 48.73 Km 3,595,904 175,217,612 48.85 Km 3,595,904 175,645,525
1.A.5 (5) widening and repair of Culverts (61 pipe + 7 RCC Slab) 0.940% 0.535% 32,302,777 68 Nos 475,040.83156 - 44.00 Nos 475,041 20,901,797 24.00 Nos 475,041 11,400,980
1.A.6 (6) widening and repair of Minor Bridges (2 Nos) 0.670% 0.381% 23,024,319 2 Nos 11,512,159.72650 - 1.00 Nos 11,512,160 11,512,160 1.00 Nos 11,512,160 11,512,160
1.B.1 (1) Culverts ( 108 Nos) 12.680% 7.219% 435,743,837 108 Nos 4,034,665.15567 - 47 Nos 4,034,665 189,629,262 61.00 Nos 4,034,665 246,114,574
1.B.2 (2) Minor Bridges ( 8 Nos) 1.770% 1.008% 60,825,441 8 Nos 7,603,180.11788 - 1 Nos 7,603,180 7,603,180 7.00 Nos 7,603,180 53,222,261
C 1.C New 2-lane realignment/bypass (11.7 km) -
1.C.1 (1) Earthwork up to top of the sub-grade 4.070% 2.317% 139,864,150 11.700 Km 11,954,200.81308 - 2.220 Km 11,954,201 26,538,326 9.48 Km 11,954,201 113,325,824
1.C.2 (2) Granular work (sub-base, base, shoulders) 4.800% 2.733% 164,950,348 11.700 Km 14,098,320.36923 - 2.220 Km 14,098,320 31,298,271 9.48 Km 14,098,320 133,652,077
1.C.3 (3) Bituminous works (DBM) 1.920% 1.093% 65,980,139 11.700 Km 5,639,328.14769 - 2.220 Km 5,639,328 12,519,308 9.48 Km 5,639,328 53,460,831
1.C.4 (4) Bituminous works (BC) 1.270% 0.723% 43,643,113 11.700 Km 3,730,180.59769 - 2.220 Km 3,730,181 8,281,001 9.48 Km 3,730,181 35,362,112
New Culverts, Minor Bridges, Underpasses,Overpasses on
D 1.D Realignments/Bypasses. -
1.D.1 (1) Culverts ( 38 Nos) 4.900% 2.790% 168,386,814 38 Nos 4,431,231.94500 - 8 Nos 4,431,232 35,449,856 30 Nos 4,431,232 132,936,958
1.D.2 (2) Minor Bridges ( 2 Nos) 1.420% 0.808% 48,797,811 2 Nos 24,398,905.68900 - - Nos 24,398,906 - 2 Nos 24,398,906 48,797,811
2 Major Bridge Works and ROB/RUB 9.140% -
A 2.A Widening and/or repairs of Major Bridges (3 Nos.) -
2.A.1 1) Foundation 22.580% 2.064% 124,577,884 3 Nos 41,525,961.25200 - 2 Nos 41,525,961 83,051,923 1 Nos 41,525,961 41,525,961
2.A.2 2) Sub-Structure 13.630% 1.246% 75,199,139 3 Nos 25,066,379.62200 - 2 Nos 25,066,380 50,132,759 1 Nos 25,066,380 25,066,380
2.A.3 3) Super Structure (including crash barriers etc. complete) 8.920% 0.815% 49,213,230 3 Nos 16,404,409.84800 - 2 Nos 16,404,410 32,808,820 1 Nos 16,404,410 16,404,410
(iii) Paver blocks for footpath ( 41763 Sqm )and Utility ducts
3.(iii) ( 2300 Rm) 1.350% -
Paver blocks for footpath ( 41763 Sqm ) 1.064% 0.361% 21,800,440 41763 Sqm 522.00368 - 24545 Sqm 522 12,812,580 17218 Sqm 522 8,987,859
Utility ducts ( 2300 Rm) 0.286% 0.097% 5,849,134 2300 Rm 2,543.10193 - 1071 Rm 2,543 2,723,662 1229 Rm 2,543 3,125,472
3.(iv) (iv) Road signs -
3.(iv).a a) Octagonal Stop Sign (900 mm dia) ( 288 Nos) 0.120% 0.041% 2,457,740 288 Nos 8,533.81913 - 121 Nos 8,534 1,032,592 167 Nos 8,534 1,425,148
3.(iv).b b) Triangular Signs (900 mm Dia) (956 Nos) 0.290% 0.098% 5,939,538 956 Nos 6,212.90597 - 417 Nos 6,213 2,590,782 539 Nos 6,213 3,348,756
3.(iv).c c) Circular sign 900 dia. 0.000% - 0 - -
3.(iv).d d) Circular Signs (600 mm Dia) ( 178 Nos) 0.050% 0.017% 1,024,058 178 Nos 5,753.13649 - 75 Nos 5,753 431,485 103 Nos 5,753 592,573
3.(iv).e e) Facility Information Signs (800mm x 600mm) (114 Nos) 0.040% 0.014% 819,247 114 Nos 7,186.37400 - 52 Nos 7,186 373,691 62 Nos 7,186 445,555
3.(iv).f f) Facility Information Signs (600mm x 450mm)( 73Nos) 0.020% 0.007% 409,623 73 Nos 5,611.27833 - 32 Nos 5,611 179,561 41 Nos 5,611 230,062
3.(iv).g g) Chevron Signs (600mm x 500mm) (760Nos) 0.140% 0.048% 2,867,363 760 Nos 3,772.84635 - 348 Nos 3,773 1,312,951 412 Nos 3,773 1,554,413
3.(iv).h h) Route Marker sign boards size 600mmx450mm (31Nos) 0.020% 0.007% 409,623 31 Nos 13,213.65542 - 8 Nos 13,214 105,709 23 Nos 13,214 303,914
3.(iv).i i) Place Identification Signs (1600mm x 1250mm) (90 Nos) 0.190% 0.064% 3,891,422 90 Nos 43,238.01690 - 41 Nos 43,238 1,772,759 49 Nos 43,238 2,118,663
3.(iv).j j) Gantry board ( 19Nos) 0.910% 0.309% 18,637,861 19 Nos 980,940.05100 - 11 Nos 980,940 10,790,341 8 Nos 980,940 7,847,520
Road Furniture - 0 0
3.(v) (v) Thermoplastic Paint ( 53135 Sqm ) 2.270% 0.770% 46,492,247 45,531 Sqm 1,021.11191 - 21,228 Sqm 1,021 21,676,164 24303 Sqm 1,021 24,816,083
3.(vi).a (vi) (a) Delinator(4616 Nos ) 0.530% 0.180% 10,855,018 4616 Nos 2,351.60700 - 1,617 Nos 2,352 3,802,549 2999 Nos 2,352 7,052,469
3.(vi).b (vi) (b) Hazardous marker ( 618 Nos ) 0.070% 0.024% 1,433,682 618 Nos 2,319.87316 - 232 Nos 2,320 538,211 386 Nos 2,320 895,471
3.(vii) (vii) Road stud (25411 Nos) 0.610% 0.207% 12,493,511 25,411 Nos 491.65760 - 11,841 Nos 492 5,821,718 13570 Nos 492 6,671,794
3.(viii) (viii) Pedestrian crossing with raised hump (72 Nos) 1.100% 0.373% 22,529,282 72 Nos 312,906.70125 - 31 Nos 312,907 9,700,108 41 Nos 312,907 12,829,175
3.(ix) (ix) Pedestrian rail (37174 Rm) 3.490% 1.184% 71,479,269 37174 Rm 1,922.82964 - 20630 Rm 1,923 39,667,975 16544 Rm 1,923 31,811,294
3.(x) (x) KM /HM Stone ( 548 Nos ) and Boundary Stone (4372 Nos ) 0.370% 0.126% 7,578,031 4940 Nos 1,534.01445 - 2303 Nos 1,534 3,532,835 2637 Nos 1,534 4,045,196
3.(xi) (xi) Rumble Strip (275 Locations) 0.020% 0.007% 409,623 126 Nos 3,250.97871 - 60 Nos 3,251 195,059 66 Nos 3,251 214,565
3.(xii) (xii) Project facilities 325,798.77373 - 325798.773728 0 325798.773728 -
3.(xii).a a) Bus Bay 9.430% 3.200% 193,137,394 76 Nos 2,541,281.50575 - 36 Nos 2,541,282 91,486,134 40 Nos 2,541,282 101,651,260
3.(xii).b b) Bus Shelter 1.650% 0.560% 33,793,924 126 Nos 268,205.74393 - 60 Nos 268,206 16,092,345 66 Nos 268,206 17,701,579
3.(xii).c c) Truck Lay Bye 0.000% 0.000% - - 0 - -
3.(xii).d d) Solar Street Lighting 4.050% 1.374% 82,948,722 1038 Nos 79,912.06348 - 363 Nos 79,912 29,008,079 675 Nos 79,912 53,940,643
(xiii) Safety and traffic management during construction
3.(xiii) including repair of existing road 2.090% 0.709% 42,805,637 97.57 Km 438,703.70626 - 48.73 Km 438,704 21,376,715 49 Km 438,704 21,428,921
3.(xiv) (xiv) Site clearance and dismantling of existing structures 2.120% 0.719% 43,420,072 109.273 Km 397,354.07382 - 50.947 Km 397,354 20,243,998 58 Km 397,354 23,176,074
(xv) Protection works like pitching on slopes (1030 Rm), chutes
3.(xv) (2370 Rm), turfing (432349 sqm) etc. 2.000% -
Pitching on slopes (1030 Rm) 0.115% 6,963,596 1030 Rm 6,760.77321 - 260 Rm 6,761 1,756,915 770 Rm 6,761 5,206,681
chutes (2370 Rm) 0.136% 8,192,466 2370 Rm 3,456.73686 - 598 Rm 3,457 2,066,959 1772 Rm 3,457 6,125,507
turfing (432349 sqm) 0.428% 25,806,269 432349 Sqm 59.68851 - 109082 Sqm 60 6,510,922 323267 Sqm 60 19,295,347
3.(xvi) (xvi) W-beam crash barriers (40203 Rm) 6.950% 2.358% 142,344,103 40203 Rm 3,540.63386 - 12458 Rm 3,541 44,109,217 27745 Rm 3,541 98,234,886
3.(xvii) (xvii) Retaining wall (3603 Rm), breast, toe wall (670 Rm) 4.320% 1.466% 88,478,637 4273 Rm 20,706.44435 - 2852 Rm 20,706 59,054,779 1421 Rm 20,706 29,423,857
3.(xviii).a (xviii) (a) Major Junctions and island improvement 5.290% 1.795% 108,345,368 14 Nos 7,738,954.82936 - 6 Nos 7,738,955 46,433,729 8 Nos 7,738,955 61,911,639
3.(xviii).b (b) Minor Junctions 4.150% 1.408% 84,996,838 261 Nos 325,658.38500 - 122 Nos 325,658 39,730,323 139 Nos 325,658 45,266,516
3.(xix) (xix) High Mast Lights at major Juctions 0.520% 0.176% 10,650,206 14 Nos 760,729.01914 - 6 Nos 760,729 4,564,374 8 Nos 760,729 6,085,832
3.(xx) (xx) Roadside Toilet Facility 1.450% 0.492% 29,697,691 126 Nos 235,695.95679 - 60 Nos 235,696 14,141,757 66 Nos 235,696 15,555,933
3.(xxii) (xxii) Miscellaneous Works including General Items and EMP -
1) General Items -
(a) Construction of Temporary Diversions 7.020% 2.382% 143,777,785 6600 Rm 21,784.51282 - 0 Rm 21,785 - 6600 Rm 21,785 143,777,785
(b) Provision and installation of site offices for the Engineers and
the Engineer representative 0.210% 0.071% 4,301,045 1 LS 4,301,044.83900 - LS 4,301,045 - 1 LS 4,301,045 4,301,045
(c) Maintain Site Offices for the Engineer 0.100% 0.034% 2,048,117 1 LS 2,048,116.59000 - LS 2,048,117 - 1 LS 2,048,117 2,048,117
(d) Supply and installation of all furniture and equipment
complete for site offices 0.060% 0.020% 1,228,870 1 LS 1,228,869.95400 - LS 1,228,870 - 1 LS 1,228,870 1,228,870
(e) Provision of Additional Office Equipment for the Engineer 0.110% 0.037% 2,252,928 1 LS 2,252,928.24900 - LS 2,252,928 - 1 LS 2,252,928 2,252,928
(f) Provision and Installation of field Laboratory 0.350% 0.119% 7,168,408 1 LS 7,168,408.06500 - LS 7,168,408 - 1 LS 7,168,408 7,168,408
(g) Maintenance of field laboratory 0.100% 0.034% 2,048,117 1 LS 2,048,116.59000 - LS 2,048,117 - 1 LS 2,048,117 2,048,117
(h) Colour photographs and videography in CD/DVDs including as
built drawings 0.080% 0.027% 1,638,493 14 Quarters 117,035.23371 - Quarters 117,035 - 14 Quarters 117,035 1,638,493
2) EMP -
(a) Mitigation Measures other than Good Engineering Practices. 0.320% 0.109% 6,553,973 1 LS 6,553,973.08800 - LS 6,553,973 - 1 LS 6,553,973 6,553,973
(f)Additional Training for Land use Management at Package Level 0.050% 0.017% 1,024,058 1 LS 1,024,058.29500 - LS 1,024,058 - 1 LS 1,024,058 1,024,058
1 LS 2,252,928.25
1 LS 7,168,408.07
1 LS 2,048,116.59
14 Quarters 1,638,493.27
1 LS 6,553,973.09
36 Months 145,825,901.21
1 LS
2,048,116.59
1 LS 76,189,937.15
1 LS
2,457,739.91
1 LS 1,024,058.30
6,036,300,000.00
From To Total
TCS -3.027 106.246 109.273
Design Chainage Culverts
S.No Length TCS Widening
From To S.No Chainage Ex. Type
Given S.No
Pro. Type Treatment Nos Ex. Span Pro. Span Exsitig / Bypass Ex. Width
Width
Box Recon 1 4x0.9 2.0x2.0 Center 10.10 12.00 2
Box Recon 1 1 x 0.9 1.5x1.5 Center 10.20 16.00 3
Box Recon 1 1 x 0.9 1.5x1.5 Center 9.70 16.00 4
Box Recon 1 1x3.0 3.0x1.5 Center 8.20 16.00 5
Box Recon 1 1x1.4 1.5x1.5 Center 8.00 12.00 6
Box Recon 1 1 x 0.5 1.5x1.5 Center 12.00 12.00 7
Box Recon 1 6x0.9 5.5x2.0 Center 9.90 14.85 8
Box Recon 1 1x0.9 1.5x1.5 Center 10.10 15.10 9
Box Recon 1 1x0.9 1.5x1.5 Center 10.10 14.60 11
Box Recon 1 1x0.9 1.5x1.5 Center 10.05 12.00 12
Box Recon 1 6x0.9 5.5x1.5 Center 10.10 12.00 13
Box Recon 1 1x0.90 1.5x1.5 Center 15.25 24.80 14
Box Recon 1 1x0.9 1.5x1.5 Center 10.20 12.00 15
Box Recon 1 1x0.9 1.5x1.5 Center 10.30 12.00 16
Box Recon 1 1x0.9 1.5x1.5 Center 10.00 12.00 17
Box Recon 1 1X1.8 2.0x1.5 Center 7.30 16.00 18
Box Recon 1 2X0.9 2.0x1.5 Center 10.50 12.70 19
Box Recon 1 2X0.9 2.0x1.5 Center 10.50 12.00 20
Box Recon 1 3x0.6 2.0x2.0 Center 10.50 12.00
Box Recon 1 5X0.9 5.0x1.5 Center 10.00 12.00
Box Recon 1 2X2.5 5.5x2.0 Center 8.30 12.00
Box Recon 1 4X0.9 4.0x1.5 Center 10.00 16.00
Box Recon 1 2X2.0 5.0x1.5 Center 8.40 12.00
Box Recon 1 1x0.6 1.5x1.7 Center 9.80 12.00
Box Recon 1 1x0.6 1.5x1.7 Center 9.20 12.00
Box Recon 1 2X0.9 3.0x1.5 Center 10.20 15.20
Box Recon 1 1x0.9 1.5x1.5 Center 10.20 12.00
Box Recon 1 1x1.5 2.0x1.5 Center 8.90 12.00
Box Recon 1 1x0.6 1.5x1.5 Center 12.50 16.00
Box Recon 1 1x1.0 2.0x2.0 Center 12.00 16.00
Box Recon 1 1x1.5 2.0x1.5 Center 9.00 12.00
Box Recon 1 1x0.9 1.5x1.5 Center 10.10 12.00
Box Recon 1 3x1.20 5.0x2.0 Center 8.60 12.00
Box Recon 1 1x0.9 1.5x1.7 Center 12.60 13.30
Box Recon 1 1x0.9 1.5x1.5 Center 12.60 26.70
Box Recon 1 1x1.0 2.0x2.5 Center 8.20 15.35
Box Recon 1 1x1.2 2.0x1.7 Center 8.10 12.00
Box Recon 1 2x1.0 3.0x2.0 Center 10.60 12.00
Box Recon 1 1x1.0 2.0x1.5 Center 12.20 17.35
Box Recon 1 1x3.0 3.0x3.5 Center 10.10 12.00
Box Recon 1 1x1.0 1.5x1.7 Center 9.40 12.00
Box Recon 1 2x1.2 3.0x2.0 Center 15.00 12.00
Box Recon 1 1x1.2 2.0x1.5 Center 14.30 21.00
Box Recon 1 2x1.0 2.5x2.5 Center 13.50 12.00
Box Recon 1 3x1.0 4.0x2.0 Center 14.90 12.00
Box Recon 1 1x0.9 1.5x1.6 Center 10.20 16.00
Box Recon 1 3x1.20 4.0x2.0 Center 8.00 12.00
Box Recon 1 1x1.0 1.5x1.7 Center 8.15 12.00
Box Recon 1 1x3.7 4.0x1.5 Center 8.40 15.00
Box Recon 1 1x1.2 2.0x1.7 Center 8.80 15.90
Box Recon 1 3x0.9 3.0x1.5 Center 10.10 13.70
Box Recon 1 1x1.80 2.0x1.5 Center 8.00 12.00
Box Recon 1 1x0.9 1.5x1.6 Center 10.20 12.00
Box Recon 1 1x3.0 3.5x1.5 Center 8.20 12.00
Box Recon 1 4x0.9 4.0x2.0 Center 10.00 12.00
Box Recon 1 4x0.9 4.0x2.0 Center 10.20 12.60
Box Recon 1 1x1.2 1.5x2.1 Center 9.50 12.00
Box Recon 1 1x2.0 2.0x2.0 Center 8.30 16.00
Box Recon 1 1x1.0 1.5x1.5 Center 8.10 16.00
Box Recon 1 2x0.9 2.5x2.0 Center 10.10 16.00
Box Recon 1 1x1.8 2.0x1.5 Center 8.00 12.00
Box Recon 1 1x2.0 4.5x2.0 Center 19.50 12.00
Box Recon 1 2x0.9 2.0x1.5 Center 9.90 12.00
Box Recon 1 2x2.6 5.5x1.5 Center 8.40 17.40
Box Recon 1 1x1.0 1.5x1.7 Center 8.20 12.00
Box Recon 1 1x0.45 1.5x1.7 Center 8.20 12.00
Box Recon 1 1x1.0 1.5x1.9 Center 8.00 12.00
Box Recon 1 1x3.0 3.0x3.0 Center 12.00 24.90
Box Recon 1 2x1.5 3.0x2.5 Center 6.80 16.00
Box Recon 1 1x0.9 1.5x1.5 Center 9.70 16.00
Box Recon 1 1x3.0 3.0x1.5 Center 12.00 16.00
Box Recon 1 1x0.5 1.5x1.7 Center 8.40 12.00
Box Recon 1 2x0.9 2.0x1.5 Center 10.00 12.00
Box Recon 1 2x1.3 3.0x2.0 Center 8.20 12.00
Box Recon 1 1x0.9 1.5x1.8 Center 8.20 12.00
Box Recon 1 1x3.0 3.0x2.5 Center 12.00 12.00
Box Recon 1 1x1.2 1.5x1.7 Center 12.60 12.00
Box Recon 1 1x0.6 1.5x1.7 Center 8.10 12.00
Box Recon 1 1x0.3 1.5x1.7 Center 8.30 12.00
Box Recon 1 1x3.0 3.0x2.0 Center 12.00 15.15
Box Recon 1 1x1.8 2.0x2.0 Center 11.90 15.65
Box Recon 1 1x0.9 1.5x1.7 Center 12.60 12.00
Box Recon 1 2x0.9 2.0x2.0 Center 12.60 18.50
Box Recon 1 1x3.0 3.0x2.0 Center 12.00 17.80
Box Recon 1 1x3.05 .05x1.5 Center 8.00 12.00
Box Recon 1 1x0.9 1.5x1.5 Center 12.60 16.10
Box Recon 1 1x1.5 2.0x2.0 Center 8.40 12.00
Box Recon 1 2x2.1 4.5x1.5 Center 8.30 14.60
Box Recon 1 1x1.0 1.5x1.7 Center 8.20 16.00
Slab Recon 1 4x3 4x3 Center 8.00 12.00
Slab Widen 1 2.0x1.5 2.0x1.5 Center 12.00 16.00
Slab Widen 1 1.0x1.5 1.0x1.5 Center 12.00 16.00
Slab Widen 1 1x4.2 1x4.2 Center 11.90 16.00
Slab Widen 1 1x2.1 1x2.1 Center 12.10 13.60
Slab Widen 1 1x3.0 1x3.0 Center 12.10 12.00
Slab Widen 1 1x5.0 1x5.0 Center 12.00 13.41
Slab Widen 1 1x4.0 1x4.0 Center 12.00 12.00
Pipe Widen 1 1x0.9 1x0.9 Center 10.10 10.90
Pipe Widen 1 1x0.9 1x0.9 Center 10.10 1.90
Pipe Widen 1 1 x0.9 1 x0.9 Center 10.10 2.00
Pipe Widen 1 1x0.9 1x0.9 Center 10.10 5.90
Pipe Widen 1 1x0.9 1x0.9 Center 10.20 4.85
Pipe Widen 1 2x0.9 2x0.9 Center 10.10 3.65
Pipe Widen 1 1x0.9 1x0.9 Center 10.20 1.90
Pipe Widen 1 1x0.9 1x0.9 Center 10.00 2.10
Pipe Widen 1 1x0.9 1x0.9 Center 10.05 2.05
Pipe Widen 1 1x0.9 1x0.9 Center 10.15 4.85
Pipe Widen 1 1x0.9 1x0.9 Center 10.20 7.80
Pipe Widen 1 1x0.9 1x0.9 Center 10.00 2.85
Pipe Widen 1 2x0.90 2x0.90 Center 10.25 3.58
Pipe Widen 1 1x0.9 1x0.9 Center 9.90 2.20
Pipe Widen 1 1x1.2 1x1.2 Center 9.90 6.10
Pipe Widen 1 2x0.9 2x0.9 Center 10.10 1.90
Pipe Widen 1 1x0.9 1x0.9 Center 9.40 2.70
Pipe Widen 1 1x0.9 1x0.9 Center 10.10 2.00
Pipe Widen 1 1x0.9 1x0.9 Center 10.00 2.10
Pipe Widen 1 1x0.9 1x0.9 Center 10.10 2.00
Pipe Widen 1 1X0.9 1X0.9 Center 10.20 1.90
Pipe Widen 1 1x0.9 1x0.9 Center 10.10 2.00
Pipe Widen 1 1x0.9 1x0.9 Center 10.20 1.90
Pipe Widen 1 2x0.9 2x0.9 Center 10.30 2.15
Pipe Widen 1 1x0.9 1x0.9 Center 10.20 2.35
Pipe Widen 1 2X0.9 2X0.9 Center 10.10 1.90
Pipe Widen 1 1X0.9 1X0.9 Center 10.20 1.90
Pipe Widen 1 2X0.9 2X0.9 Center 10.20 1.80
Pipe Widen 1 1X0.9 1X0.9 Center 10.10 2.10
Pipe Widen 1 1X0.9 1X0.9 Center 10.30 2.10
Pipe Widen 1 1X0.9 1X0.9 Center 10.40 2.05
Pipe Widen 1 1X0.9 1X0.9 Center 10.30 2.50
Pipe Widen 1 1x0.9 1x0.9 Center 9.70 2.40
Pipe Widen 1 1x1.0 1x1.0 Center 12.60 4.00
Pipe Widen 1 1x1.0 1x1.0 Center 12.60 6.90
Pipe Widen 1 1x0.9 1x0.9 Center 12.60 4.00
Pipe Widen 1 2x0.9 2x0.9 Center 12.60 0.85
Pipe Widen 1 2x0.9 2x0.9 Center 10.10 1.90
Pipe Widen 1 2x0.9 2x0.9 Center 10.20 1.80
Pipe Widen 1 1x0.9 1x0.9 Center 12.60 0.05
Pipe Widen 1 1x0.9 1x0.9 Center 12.60 3.90
Pipe Widen 1 2x0.9 2x0.9 Center 12.50 4.78
Pipe Widen 1 1x0.9 1x0.9 Center 12.40 6.05
Pipe Widen 1 1x0.9 1x0.9 Center 12.70 1.30
Pipe Widen 1 1x0.9 1x0.9 Center 12.70 1.30
Pipe Widen 1 1x1.0 1x1.0 Center 15.30 2.79
Pipe Widen 1 1x0.9 1x0.9 Center 10.10 5.00
Pipe Widen 1 1x0.9 1x0.9 Center 12.60 2.50
Pipe Widen 1 1x0.9 1x0.9 Center 10.10 5.90
Pipe Widen 1 1x0.9 1x0.9 Center 12.60 2.50
Pipe Widen 1 2x0.9 2x0.9 Center 12.45 2.03
Pipe Widen 1 1x0.9 1x0.9 Center 12.60 2.40
Pipe Widen 1 1x0.9 1x0.9 Center 12.50 2.60
Pipe Widen 1 2x0.9 2x0.9 Center 10.10 1.90
Pipe Widen 1 2x1.2 2x1.2 Center 12.00 1.50
Pipe Widen 1 1x1.0 1x1.0 Center 10.00 2.90
Box Recon 1 1x0.9 1.5x1.5 Center 10.00 16.00
Box Recon 1 1x0.9 1.5x2.0 Center 10.00 16.00
Box Recon 1 1x1.50 2.0x1.5 Center 8.90 16.00
Box Recon 1 1x1.0 1.5x2.3 Center 9.40 16.00
Box New 1 2.4x2.6 Bypass 12.00
Box New 1 1.5x1.5 Bypass 12.00
Box New 1 1.5x2.0 Bypass 12.00
Box New 1 5.0x1.5 Bypass 12.00
Box New 1 5.0x2.0 Bypass 12.00
Box New 1 2.0x2.5 Bypass 12.00
Box New 1 3.0x3.0 Bypass 12.00
Box New 1 1.5x1.5 Bypass 12.00
Box Recon 1 1x0.9 2.0x2.0 Bypass 10.00 12.00
Box Recon 1 1x1.0 2.0x1.5 Center 12.60 12.00
Box New 1 1.5x2.1 Bypass 12.00
Box New 1 2.4x2.2 Bypass 12.00
Box New 1 1.5x2.3 Bypass 12.00
Box New 1 1.5x1.6 Bypass 12.00
Box New 1 1.5x1.7 Bypass 12.00
Box New 1 1.5x2.0 Bypass 12.00
Box New 1 1.5x2.4 Bypass 12.00
Box New 1 1.5x1.9 Bypass 12.00
Box New 1 1.5x2.5 Bypass 12.00
Box New 1 3.0x2.0 Bypass 12.00
Box New 1 1.5x2.2 Bypass 12.00
Box New 1 1.5x1.7 Bypass 12.00
Box New 1 1.5x1.8 Bypass 12.00
Box New 1 1.5x2.5 Bypass 12.00
Box New 1 1.5x3.2 Bypass 12.00
Box New 1 1.5x3.1 Bypass 12.00
Box New 1 1.5x3.0 Bypass 12.00
Box New 1 5.5x1.5 Bypass 12.00
Box New 1 1.5x2.4 Bypass 12.00
Box New 1 1.5x2.8 Bypass 12.00
Box New 1 1.5x3.6 Bypass 12.00
Box Recon 1 1x0.9 1.5x1.9 Center 12.36 12.00
Box New 1 1.5x2.2 Bypass 12.00
Box New 1 4.5x2.5 Bypass 12.00
Box New 1 1.5x1.5 Bypass 20.30
Box New 1 1.5x2.3 Bypass 12.00
Box New 1 1.5x1.5 Bypass 12.00
Box New 1 1.5x3.3 Bypass 12.00
Box New 1 1.5x1.8 Bypass 12.00
Box Recon 1 2x1.0 2.0x2.0 Center 12.60 12.00
Box Recon 1 1x1.0 1.5x2.0 Center 12.60 12.00
Box Recon 1 1x0.9 1.5x2.0 Center 9.00 12.00
Box Recon 1 1x1.60 2.0x1.5 Center 8.10 12.90
Box Recon 1 1x1.0 1.5x1.5 Center 9.80 12.90
Box New 1 1.5x1.5 Center 12.00
Box New 1 1.5x1.5 Center 12.00
Box New 1 1.5x1.5 Center 12.00
Box New 1 1.5x1.5 Center 12.00
Box New 1 1.5x1.5 Center 12.00
Box New 1 1.5x1.5 Center 12.00
Box New 1 1.5x1.5 Center 12.00
Box New 1 1.5x1.5 Center 12.00
Box New 1 1.5x1.5 Center 12.00
Box New 1 1.5x1.5 Center 12.00
Box New 1 1.5x1.5 Center 12.00
Box New 1 1.5x1.5 Center 12.00
Box New 1 1.5x1.5 Center 12.00
Box New 1 1.5x1.5 Center 12.00
Box New 1 1.5x1.5 Center 12.00
Box New 1 1.5x1.5 Center 12.00
Type New Strucutures Junction
Type
Chainage Constructio Width Width
Structure Span Length Exsitig / BypassTotal Width S.No
n MCW SR
8.245 MNB Repair 2x3.00 6.000 1x8.00 Center 8.00 2
34.901 MJB Widen 7x8.70 60.900 1x4.80 Center 4.80 3
46.309 MNB Widen 1x6.00 6.000 1x4.80 Center 4.80 4
46.808 MJB Widen 7x10.50 73.500 1x4.40 Center 4.40 5
51.221 MJB New 5x16.00 80.000 1x12.90 Bypass 12.90 6
52.376 RUB New 2x12.00 24.000 1x35.70 Bypass 35.70 7
52.692 MNB New 5x7.00 35.000 1x12.90 Bypass 12.90 8
53.745 MNB New 4x6.00 24.000 1x12.90 Bypass 12.90 9
80.455 MNB Recon 2x4.00 8.000 1x12.90 Bypass 12.90 11
81.897 MJB New 14x23.00 322.000 1x12.950 Bypass 12.95 12
86.544 MNB Recon 2x5.00 10.000 1x12.90 Center 12.90 13
93.070 MNB Recon 2x5.00 10.000 1x17.00 Center 17.00 14
97.048 MNB Recon 2x3.50 7.000 1x12.90 Center 12.90 15
99.942 MNB Recon 2x3.00 6.000 1x12.90 Center 12.900 16
102.139 MNB Widen 3x5.80 17.400 1x5.00 Center 5.000 17
104.353 MJB Widen 26x8.40 218.400 1x4.70 Center 4.700 18
105.024 MNB Recon 2x3.00 6.000 1x12.90 Center 12.900 19
108.161 MNB Recon 2x7.00 14.000 1x12.90 Center 12.900 20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
50
51
52
53
54
55
56
57
58
59
60
61
62
63
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
121
122
124
125
126
127
128
130
131
132
134
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
246
247
248
249
250
251
252
253
254
255
256
257
258
259
260
261
262
263
264
265
266
267
268
269
270
271
272
273
274
Bus Bays & Bus Shelters Builtup Section
Net Length Final Length Side Radius S.No From To Side Length HI
12 15 2 3
1 14 18 2 3
4 5 2
2 3 4
4 15 20
3 4 2
2 0 1 1 2
11 14
0 0
2 19 25
2 61 77
5 35 43
5 34 43
4 8 11 15 8
0 0
29 37
0 0
0 0
0 0
0 0
10 97 123 8 1
3 3
3 27 35 3 3
0 0
0 0
2 2 4
0 0 0 0 0 0 0
0 0
75 3 72 103 92 4 7
3 43 55 4 7
29 37
52 4 48 62 60 2 0
2 6 7
5 7
2 37 46 2
32 2 30 41 37 3 1
2 29 36 3 1
0 0
1 1
348 75 273 412 343 34 35
75 273 343 34 35
10 4 6 27 8 7 12
4 6 8 7 12
0 0
281 16 265 458 337 68 53
41 3 38 49 49
8 8 23 11 5 7
232 13 219 386 277 63 46
n, Sothupakkam
ate, Salavedu
lAmembly School Gate, Mamandur
inor Junction, KilkodongalooreKootroad Built-up-area.
School Gate, KallankattuKaveripakkam
ajor Junction, KallankattuKaveripakkam
Junction, Near Kadasikulam School
tion, Kadasikulam Built-up-area
n, Mampattu Built- up-area
nction, Mampattu Built-up-area
1372
4616 0