You are on page 1of 3

ALTERNATIVE BOREHOLE

LINER (ABL)
ALTERNATIVE BOREHOLE LINER
(ABL)
Expandable Bottom Connector Expandable Top Connector (ETC)
Is the interface between the shoe Is the interface between the running
and the ABL string. tool and the ABL string

Anchor Shoe
The shoe is made of aluminum and
drillable in approx. 30min.
ABL Deployment Procedure
Underream Pull Running
the Tool Wait on
problem to top of ABL. cement.
zone or Expand Spot Circulate out Drill out
drill with Run in hole ABL all the balanced excess of cement ABL
bi-center ABL and sit way to cement cement. shoe and
bit on bottom bottom plug POOH drill ahead

You might also like