IFM-South Region

2019-2020 Achievements
Report
MMR , IFM
August, 2020

CONFIDENTIAL | www.mobily.com.sa
Classification: Mobily INTERNAL USE

IFM-SR

Agenda
This presentation is about achievements achieved in 2019-2020 by MMR team in Abha
Technical building. Below slides summary about key achievement.

INTERNAL USE
Classification: Mobily INTERNAL USE

IFM-SR
1.Changed Engine Oil, coolant, batteries and other related material

Changed Engine Oil, coolant, batteries and other related material as per schedule on time to keep units healthy

INTERNAL USE
Classification: Mobily INTERNAL USE

IFM-SR
2. Changed the leaking Glands for Fire Pump.

Replaced glands for both fire pumps as it were leaking

4
INTERNAL USE
Classification: Mobily INTERNAL USE

IFM-SR
3. Installed Test line for Foam system

Since there was no test line attached to foam line so practical test always a difficult job.
So provided test line and testing can be done without wasting foam

5
INTERNAL USE
Classification: Mobily INTERNAL USE

IFM-SR
4. New access box point to FCU filter above Ceiling

The access boxes to FCU units filters were not placed on accurate spot since project time.
So provided new access box to all FCU unit in ceiling to create ease for technician to
access unit without any issue

6
INTERNAL USE
Classification: Mobily INTERNAL USE

IFM-SR

5. Changed all CRAH units Air Filters

As a part of periodic maintenance as per our schedule we changed all the AIR filter for all CRAH unit

7
INTERNAL USE
Classification: Mobily INTERNAL USE

IFM-SR
6. Immediate response to Erosion caused by Rain

Immediate response was shown the Rain caused heavy erosion. Backfilling was done to the effected
area and diverted the water away from the effected area to avoid any more erosion in future.

Before After

8
INTERNAL USE
Classification: Mobily INTERNAL USE

IFM-SR
• 7. Active actions Pre rains

Weather is monitored on regular interval and all the required actions took on time. Cleaned all the
Sum pits, gravel pits on time to avoid any blockage of water during rain

9
INTERNAL USE
Classification: Mobily INTERNAL USE

IFM-SR
8.No down time was recorded throughout year

Data Center availability 100%

Successful fire drill activity with Mobily safety team

Battery test for 4 UPS and 12 Rectifier

10
INTERNAL USE
Classification: Mobily INTERNAL USE

IFM-SR

9. Completed all PMR every as per schedule

All the months of the 2019 and 2020 carried out all PMR on time as per schedule.

11
INTERNAL USE
Classification: Mobily INTERNAL USE

IFM-SR
10.Followed Energy saving Plan and executed
throughout the year.

Strictly followed the energy saving policy. Concentrated on PUE and took the PUE from 8 to 5.1.
All automatic lights are controlled schedule as per change in sun rise and sun sit.

12
INTERNAL USE
Classification: Mobily INTERNAL USE

IFM-SR
11. Followed policy and Procedures and made sure no activity done
without recommended P & P.

13
INTERNAL USE
Classification: Mobily INTERNAL USE

IFM-SR
12. Cleaned all 4 sides of building with soap and
water.

14
INTERNAL USE
Classification: Mobily INTERNAL USE

IFM-SR

13. EOP & SOP training was carried out every month
as per schedule.

Every month an EOP & SOP based training is conducted to keep staff well trained and updated

15
INTERNAL USE
Classification: Mobily INTERNAL USE

IFM-SR

14. Immediate evacuation of water from Septic Tank


in every heavy rain.

During every heavy rain Septic tank is evacuated immediately so that there is no back flow in case
of next rain. Also arranged an emergency submersible pump to deal any emergency situation.

16
INTERNAL USE
Classification: Mobily INTERNAL USE

IFM-SR
15. Maintained the IFM critical sites in Mobily at
99.999 availability as per Uptime Institute
Standards.  

Following strictly all schedule and standards and made sure 99.999 availability which is Uptime Institute standard

17
INTERNAL USE
Classification: Mobily INTERNAL USE

IFM-SR
16. Every EIR for site is executed by DCIM.

All EIR activities are deal by DCIM (Dismantle or installation)

18
INTERNAL USE
Classification: Mobily INTERNAL USE

IFM-SR
16. IMSware is installed and all tickets now created in IMSware.

19
INTERNAL USE
Classification: Mobily INTERNAL USE

IFM-SR

17. LAN Wifi started work in 1st floor and 2nd floor

Wifi and LAN is now operational on 2 nd and 1st floor

20
INTERNAL USE
Classification: Mobily INTERNAL USE

IFM-SR

18. Immediate meditation response during every Incident.

Immediate meditation response during every incident happened. Every incident was fully Investigated. Took
precautionary measure so if the incident is preventable to make sure not happen in future.

21
INTERNAL USE
Classification: Mobily INTERNAL USE

IFM-SR

19. Full support provided during transferring of Access control to central.

Provided all the required support to Mobily to connect the security


cameras to central team.

22
INTERNAL USE
Classification: Mobily INTERNAL USE

IFM-SR
20 .Full support provided during transferring of
Video security cameras to central.

Provided all the required support to Mobily to connect the security cameras to
central team.

23
INTERNAL USE
Classification: Mobily INTERNAL USE

IFM south
21. Operation Progress

Site ID 2019 2020


1- Number of Corrective Actions
Abha 2 125 46

Abha 2 Corrective Action


125 in 2019

46 in 2020

INTERNAL USE
Classification: Mobily INTERNAL USE

IFM-SR
22.Operation Progress

3- Number of Visitors
Site ID 2019 2020
Abha 2 5121 1115

Abha 2Number of Visitors


5121

1115

2019
2020

INTERNAL USE
Classification: Mobily INTERNAL USE

IFM-SR
20.Took strong preventive measures for COVID-19

26
INTERNAL USE
Classification: Mobily INTERNAL USE

IFM South

23. 2019 KPI

INTERNAL USE
Classification: Mobily INTERNAL USE