You are on page 1of 9

Ring Road Proposal

PWD
Pune Ring Road
• To avoid traffic congestion in the city it is necessary to
have a ring road for Pune.

•Decision taken in the meeting conducted by Hon’ble Chief


Minister on 12/06/2007.

•Pune and Pimpri – Chinchwad Municipal Corporation to


make necessary provision in their Development Plan.

•PWD to implement the project on BOT basis.


Ring road alignment
• Survey of following stretches of ring road
undertaken.
• Part I – Theurphata NH9, Kesnand, Wagholi, Bhavdi,Tulapur, Alandi,
Kelgaon, Chimbli, NH50.

• Part II – NH50, Chimbli Moi, Nighoje, Sangurde, Shelarwadi,


Chandkhed, Pachne, Pimploli, Rihe, Ghotawde, Pirangutphata.

• Part III – Pirangutphata, Bhugaon, Chandni Chowk, Ambegaon, Katraj.

• Part IV – Ambegaon, Katraj, Mangdewadi, Wadachiwadi, Holkarwadi,


Wadkinaka, Ramdara, Theurphata, NH9
Proposed Ring road - Map
• Detail survey of Part I , II and IV completed.

• Presentation was made on 19.04.2008. As Part


III and IV are very close to the city limits
considering rapid growth of city

• Revised Alignment based on toposheets and


google earth images for Part III & IV is
considered.
Alignment Details
Part I Theurphata NH9, Kesnand, Wagholi, 39.89 km
Bhavdi,Tulapur, Alandi, Kelgaon,
Chimbli, NH50.

Part II Chimboli phata to Nighoje to Sangurde, 46.40 km


Shelarwadi, NH4, Shirgaon, Chandkhed,
Rihe, Ghotawde, Pirangut

Part Pirangut, Urwade, Mutha Bahuli, 51.20 km


Sangrun, Nigde, Khamgaon, Ghera
III Sinhgad, Kalyan, Kondanpur,
Shriramnagar
Part NH4 , Gogalwadi, Patharwadi, Bhivri, 32.24 km
Kanifnath, New Mula – Mutha canal,
IV Theurphata, NH9
After the alignment of Part III & IV is finalised detail survey
work will be undertaken.
Acquisition Proposed
• Ring road length 169.73km

• Land Acquisition cost Rs. 2374.00 crores

• Construction cost Rs. 6065.00 crores

• Total cost Rs. 8439.00 crores.

• Satelite townships in 38.38km stretch in balance width of


200m (expected area 8,25,93,760 sq.ft) – by giving FSI of 1.0
+ additional 1.0 = 2.0 the expected revenue Rs. 9228.00
crores.
Approx. estimates
• Acquisition is proposed for 38.38km length – 300m width, 121.12km
length – 100m width and 10.44km length – 45 to 60m.

• Acquisition cost - Rs. 2374 crores.

• Construction cost – Rs. 6065 crores.

• For the stretch of 38.38km road length acquisition is proposed for 300m
width and the width balance after that required for road i.e. 200m will be
developed with additional FSI of 1.0 over and above existing 1.0 FSI to
make the project financially viable.

• State Govt. to approve the project on a PPP model without toll alongwith
concession of extra FSI.
Details of Ring road
Name of the Road Length Flyovers Majo Mino Viadu Under pass Tunnel Elevat Land Acquisition
in m r r cts length s ed
bridg bridg bridg length road
Road Railway es es es in m 100 m 300m
Length length lengt lengt lengt width width
in m in m h in h in h in area in road
m m m hectare area in
s hectares

1 2 3 4 5 6 7 8 9 10 11 12 13 14
1 ¦Part I – Theurphata, NH9, 39.89 650 300 490 450 1260 2750 355 132
Kesnand, Wagholi, Bhavdi,
Tulapur, Alandi, Kelgaon,
Chimbli, NH50
2 ¦Part II – Chimboliphata to 46.400 160 200 850 300 630 120 650 3490 242.6 695.8
Nighoje to Sangurde,
Shelarwadi, NH4, Shirgaon,
Chandkhed, Rihe,
Ghotawde, Pirangut.
3 Part III – Pirangut, Urwade, 51.200 1850 1520 300 3070 90 2928 425 255.00
Mutha Bahuli, Sangrun,
Nigde, Khamgaon, Ghera
Sinhgad, Kalyan,
Kondanpur, Shriramnagar.
4 Part IV – NH4, Gogalwadi, 32.240 500 150 150 2250 980 8050 1200 203.00 45.00
Patharwadi, Bhivri, 55.70
Kanifnath, New Mula –
Mutha canal, Theurphata,
NH9
169.940 3160 650 2860 1200 5320 2960 120 11628 7440 1281.4 1116.8