Tualatin, OR 97062 www.hjarnett.com Restore-A-Phase
• Used for Temporary Power Restoration
• Used when two conductors are available (conductor /neutral, conductor/conductor) • Auto transformer (7.5kVA per unit) 32 Amp • 3 unit Stackable operation allows up to 96 Amp Temporary Service Parts Main Unit Buddy Base Parts Booster Unit Safety First • Follow all company safety protocol for inspection and removal of meter. • ALWAYS- Make sure you have two good service conductors prior to installing RaP. The Super Beast or Mega Beast are great tools for this inspection. • Notify customer that you will be installing this tool and they shall not tamper or allow children to play near the RaP until you repair their service. • If possible, Have customer turn OFF main breaker at Breaker Panel. • ALWAYS- Seal and Lock- ALL hardware and meter to meter base when RaP is installed on service. Isolate the Good and Bad
• Remove meter from socket and inspect socket
for any other problems or tampering. • Determine if there are two good service conductors available. • RaP must not be used if two good conductors are not available. (Two hot legs, or One hot leg and One neutral) • Isolate and disconnect bad conductor at transformer and meter socket Customer Service- Safety
• Have Customer Turn-OFF Main Breaker at
Load. • Advise Customer of ALL Safety Hazards with overloading their Temporary Service • Temporary Service should only be used for a limited time to run essential household items. Installing RaP
• Place RaP near meter socket where Buddy Base will
reach socket • Install Temporary Ground rod. If customer’s ground rod is good, this is acceptable for establishing ground. • Connect Temporary Ground rod to stud on right side of RaP with suitable sized cable. (#2 or greater is recommended) • Install Neutral Cable on back of Buddy Base to Neutral in Meter Base. This is a temporary connection, but it must be tight. Installing RaP
• Breakers are located in the front panel of the
Master unit. • Make sure breakers are turned OFF anytime you are installing, removing or adding any units • Turn breakers on before closing securing and locking lid Installing RaP
• Secure Buddy Base into Meter Socket with three
(3) brass screws on side of Base. • Turn ON RaP main breaker. Make any voltage checks if needed • Turn OFF RaP main breaker • Install Meter into Buddy Base. Secure Meter. • Turn ON RaP main breaker • Use appropriate locking devices such as meter rings or padlocks to secure all components Back to Customer Service- Safety
• Inform customer that service has been
temporarily restored and they can turn on the main breaker. If breaker on RaP trips, inform customer to reduce load until service can be repaired. • One Master Unit = 32Amp Continous • Master and Booster = 64Amp Continuous • Master/(2) Boosters= 96Amp Continuous Installing Booster Units
• Unlock Master unit door and raise lid.
• Two (2), 4-pin receptacles are available to add two (2) Booster units • Turn-OFF breakers when adding Booster units to avoid damage to Master or Booster units Installing Booster Units
• Plastic Hole Plugs on a small cord shall be
installed when no Booster is in use and can be removed when adding Booster units • Remove plugs to allow Booster cable access to Master unit receptacles when in the closed and locked position. Disconnecting RaP after Service Repair
• Tell customer you are ready to reconnect Full Repaired Service
• Have customer turn off house appliances then Main Breaker at Breaker panel. • Turn OFF Main Breaker and Booster breakers on RaP • Unlock Meter and RaP Buddy Base and pull from socket • Reinstall Meter and Locking devices per company code