You are on page 1of 64

Base Band training

Prepared by:
Eng. Rawand Abdullatif
Eng. Qusay Dawood
Date / 23-5-2017
Technical Data for Base Band unit
Base Band over view training
 For login Base Band :
 Setup X86
 Setup element manager ( em CLI )

 Format Base Band unit


- format from browser Google chrome

 Integration Base Band unit


 Script ( site Basic , site equipment and RBS summary )
 msftp server
 Integration from browser Google chrome
Setup X86
Choose install from local directory
Next
Next
Setting parameters
Archive default setting
click on skip
Net default setting
click on skip
Perl default setting
click on skip
Shells default setting
click on skip
Next
Next
Setup element manager ( em CLI )
Next
Choose JAVA 3rd choice
Next
Choose icon on desktop
Install
Done
Format Base Band unit
Change IP PC
Browser Google chrome
Write IP in Browser:
https://169.254.2.2/ea.html
Click proceed any way
Click on Board restore

After this step led on TNA and fiber will be


flashing
Integration Base Band unit
Change IP PC
Base Band folder in drive C contain :
1- three scripts ( site basic , site equipment and RBS
summary ) which received from back office
2- Base Band software rar file
3- msftp server

Site basic name


Site equipment name
SW rar file name
Before starting integration
1- editing RBS summary script
2- start msftp
1- Editing RBS summary script

1- name of Base Band SW.zip ( compare with SW rar file name.zip )

2- name of Site equipment.xml ( compare with site equipment name.xml)

3- name of Site Basic.xml ( compare with site Basic name.xml)


2- Start msftp inside drive C
( for control scripts )
Open drive C Base Band folder
copy root base band , paste inside root path
selection

copy

Paste
Start msftp

User and password ( ftp )


Integration from browser
Google chrome
Change IP PC
Browser Google chrome
Write IP in Browser:
https://169.254.2.2/
Setting the following
Site installation file:
copy name of RBS summary script after
editing and paste on it
Click on Download file
Steps during download the
files
1- check msftp server should be
IP appear
2- download in progress integrate
will be active ( click on )
Click on browser refresh and waiting till
configuration will be complete

Isn’t necessary to complete


the loading %100
After configuration complete
check :
 TNA port will be operational ( green led )

 Interface led will be operational ( green led )

 Call the RNC to check the integration


Login to Base Band by EM-CLI
for view all equipment status
Change IP PC
Add Base Band IP address
EM CLI commands
>lt all ( view all equipment status
RRU , TMA , ANT , RET, alarms
…….etc. )
User and password ( rbs )
Some commands for Base Band
>al ( view alarm )
>alt ( view alarm with time )
>ala ( view alarm with descriptions )
>st ru ( view RRU status )
>st ret ( view RET status )
>st tma ( view TMA status )
>st cel ( view cell status )
>st ant ( view Antenna status )
>cabx ( view VSWR , Temp. , delta and fan group ……)
>get ecport ( view base band port on SHU )
>cvls ( view CV list )
>cvms HTS ( create CV with start able and roll back list status )
>cvre HTS ( reload CV )
>cvrm HTS ( remove CV )
>get vlan ( view VLAN ID )
>get address ( view IP for OAM and traffic )
>get nexthop ( view IP hop inside site Basic script )
Command for restart base band
>acc FieldReplaceableunit=1 restartunit

Choose (y)

Choose (0) For warm restart

Choose (1) restart reason


Thank you

You might also like