WATERPROOFING

WORKS
SURFACE PREPARATION
AREA TO BE WATERPROOFED WITH
CONCRETE PRIMER
INSTALLED WATERPROOFING
MEMBRANE Using 3.5 Kg. Mineral Polybond
INSTALLED WATERPROOFING MEMBRANE
UNDER LEAK AND SEEPAGE TESTING
FINISHED WATERPROOFING
MEMBRANE WITH TOPPING

 This area has been finished, water tested, checked and


inspected, and it was topped already.