By Nidhi.N.Gajbe
Koyna Design Division No.2
AE 1
TAIL RACE CHANNEL
A tail race channel or tunnel which carries the water
from turbine exit (draft tube) back to the river or exiting
canal.
Tailrace consists of Tail race pool and Tail race channel.
Tail race pool start from D.T. gate structure.
Tail race pool is constructed to avoid cavitations of
turbine. A rising apron is provided from D.T. bottom level
to CBL at start of Tail race channel by giving reverse
(rising) slope 1: 4 to 1:6 as per site requirements
The tail race channel starts from the end of TRP and is
connected to river or canal as per project layout.
DATA REQUIRED:
6) Foundation strata
7) Soil properties
Seismic Load
DESIGN APPROACH:
Tail race pool is designed for varying heights, Max. at D.T. end and Min. at
start of Tail race channel.
Top level of TRP is kept at [TWL (max) + F.B.] or HFL at PH, whichever is
more. The base slab is designed considering uplift pressure and the side
walls are designed considering lateral soil pressure.
A suitable transition shall be provided to side walls to match width of TRP at
DT gate & start of TRC.
The hydraulic design of Tail Race Channel is carried out considering TWL
(max) as F.S.L. of channel.
The TRC shall also be designed to ensure TWL(min) required for operating
the generating units.
As per the site situation cross section of channel is decided.
A suitable transition is provided to connect TRP and TRC.
The lined section is designed with Velocity of flow less than 1.50 m / sec..
The end junction of tailrace shall be suitably streamlined for good hydraulic
flow conditions.
DESIGN PROCEDURE: