JULY 27, 2020 SCOPE OF WORKS ITEM DESCRIPTION REMARKS 1 Dismantling of existing t&b tiles and installation of new floor and wall tiles .60x.60m TILES OSM 2 Dismantling of existing toilet fixture and installation of new toilet fixture Fixture OSM 3 Installation of new power line for Toilet and Bath Mirror with lighting 4 Chipping and restoration for added power line for main ceiling at living Main center light and area lighting stub-out at wall cabinet near beam 5 Transfer of smoke detector 6 Additional powerline at kitchen counter overhead cabinet and microwave shelf Current plan of T&B for dismantling of tiles and toilet fixtures Current plan of T&B for dismantling of tiles and toilet fixtures Current plan of T&B for dismantling of tiles and toilet fixtures NEW plan of T&B for installation NEW plan of T&B for installation
1. Provide new power source for the light of mirror
Plan for (additional/relocation) Electrical lighting
2 1 1. Lighting for the main living room
2. Lighting line for the cabinet lights Transfer of Smoke detector to the new ceiling at sleeping area 3 1
1. Additional power line for overhead cabinet light
2. Transfer plumbing line to side, install HB similar to the photo 3. Additional Power line at microwave shelf