SYMFONI KAMIAS

ADDITIONAL MODEL UNIT WORKS


JULY 27, 2020
SCOPE OF WORKS
ITEM DESCRIPTION REMARKS
1 Dismantling of existing t&b tiles and installation of new floor and wall tiles .60x.60m TILES OSM
2 Dismantling of existing toilet fixture and installation of new toilet fixture Fixture OSM
3 Installation of new power line for Toilet and Bath Mirror with lighting
4 Chipping and restoration for added power line for main ceiling at living Main center light and
area lighting stub-out at wall cabinet
near beam
5 Transfer of smoke detector
6 Additional powerline at kitchen counter overhead cabinet and microwave
shelf
Current plan of T&B for dismantling of tiles and toilet
fixtures
Current plan of T&B for dismantling of tiles and toilet
fixtures
Current plan of T&B for dismantling of tiles and toilet
fixtures
NEW plan of T&B for installation
NEW plan of T&B for installation

1. Provide new power source for the light of mirror


Plan for (additional/relocation) Electrical lighting

2 1 1. Lighting for the main living room


2. Lighting line for the cabinet lights
Transfer of Smoke detector to the new ceiling at sleeping area
3
1

1. Additional power line for overhead cabinet light


2. Transfer plumbing line to side, install HB similar to the photo
3. Additional Power line at microwave shelf