BADHRA FIELD OPTIMIZATION

Map of Badhra

Refer to KMZ file Badhra.kmz

2
Badhra Compression Study – Net work Today

3.0 KM 10” CS
Badhra 10 Area
Bad-11

Bad-9 10” CS 16” CS 16” CS

Main Bhit Processing Plant


Bad-10
-
BBN -2 10” CS

23.5 KM - 16” CS
3.3 MW Badhra New Gas Train 1
BBN-1 10” CS

Badhra 2 Well site


10” CS -

Bad-6 1.9 MW
10” CS

Bad-2
22.2 KM 10” CS
Badhra Gas Train 3

BJ -1 10” CS

3
Revised Production Forecast

Profile 1 (Cut at 45 MMSCFD Plant Sales)


1000.00 250000.00

900.00

800.00 200000.00

700.00

600.00 150000.00
MMSCFD & btu/scf

500.00

mmbtu
400.00 100000.00

300.00

200.00 50000.00

100.00

0.00 0.00
17 17 17 17 17 17 18 18 18 18 18 18 19 19 19 19 19 19 20 20 20 20 20 20 21 21 21 21 21 21 22
/ 20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20 /20
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
2/ 4/ 6/ 8/ 10/ 12/ 2/ 4/ 6/ 8/ 10/ 12/ 2/ 4/ 6/ 8/ 10/ 12/ 2/ 4/ 6/ 8/ 10/ 12/ 2/ 4/ 6/ 8/ 10/ 12/ 2/

Bhit WH, MMScfd Badhra WH, MMscfd Bhit Plant Total, WH MMscfd
Weighted Average of btu/scf combined gas mmbtu of combined gas
4
Existing Compressor Curves
Booster 1.9 3.3
Suction Pressure Speed Load Max. flow Issues Suction Pressure Speed Load Max. fl ow Issues Suction Pressure Speed Load Max. flow Issues
100 900 51 20.4 100 1000 66 15 200 1000 84 36
90 900 51 18.6 90 1000 62 13.3 190 1000 83 33.4
80 900 51 16.7 80 1000 58 11.8 180 1000 81 31.6
H E A LT H Y

70 900 50 14.8 70 1000 54 10.3 170 1000 79 29.8


60 900 48 13 160 1000 77 28
50 900 46 11.1 150 1000 75 26
40 900 43 9.3 140 1000 73 24.3
30 900 40 7.5 130 1000 70 22.5
20 900 35 5.7 120 1000 68 20.7
110 1000 65 18.9
10 900 29 4.1 l ow l oa d 60 1000 49 8.8 Mi n l oa d 100 1000 62 17 Di s c Te mp Al a rm
50 1000 44 7.3 Mi n l oa d 90 1000 58 15.2 Di s c Te mp Hi gh
40 1000 38 5.8 Di s c. Te mp 80 1000 56 14.1 Di s c Te mp Hi gh
70 1000 51 12.2 Di s c Te mp Hi gh
60 1000 46 10.4 Mi n l oa d

100 750 40 17 100 800 63 11.8 200 800 665 29.2


90 750 40 15.5 90 800 59 10.6 190 800 64 27.7
80 750 40 14 80 800 56 9.4 180 800 63 26.2
70 750 40 12.4 70 800 51 8.2 170 800 61 24.7
H E A LT H Y

60 750 39 11 160 800 60 23.1


50 750 37 9 150 800 59 21.6
40 750 35 8 140 800 57 20.1
30 750 32 6 130 800 55 18.7
120 800 53 17.2
110 800 51 15.6
60 800 47 7 Min load 100 800 48 14.1 Di s c Te mp Al a rm
20 750 28 4 low load 50 800 42 5.8 Min load 90 800 46 12.7 Di s c Te mp Al a rm
40 800 36 4.6 Disc Temp 80 800 43 11.2 Di s c Te mp Hi gh
70 800 39 9.7 Di s c Te mp Hi gh
60 800 36 8.2 Mi n l oa d

Table 2
Booster Notes Table 1
Suction Pressure Speed Load Max. flow Issues
100 900 66 32.5 Booster Compressor discharge 200 psig
90 900 66 28.9 1.9 MW Compressor discharge 680 psig
80 900 65 25.2 3.3 MW Compressor discharge 680 psig
H E A LT H Y

70 900 63 21.6
60 900 60 18 Note 2
50 900 55 14.5
40 900 48 11 Booster Compressor run in parallel operation
30 900 39 7.7

5 20 900 27 4.6 Low load


Badhra Wells

Badhra-2 BJ Dir-A BB N-1 BB N-2 Badhra-6 Badhra-9 Bahdra-10 Badhra-11 Badhra-13 Badhra-1 Badhra-3 Badhra-8
A sand P&A
B sand P&A
B1 Sand P&A
Basin Mughal Kot
C-sand P&A
D-sand P&A P&A
E Sand P&A P&A

LEGEND
Sand present not Tested
Mineralised and currently Producing
Minerlised and Water Wet
Watered out and Plugged
Shale out

6
Badhra Field Layout

7
BADHRA COMPRESSION STUDY
 Badhra – 09 flowline terrain is prone to liquid hold-ups which results in production decline (3 – 4) MMSCFD and
high line pressure drop.

Flow Rate [MMscfd]


950
500 16
FWHP & DP [Psig]

Elevation , m
900
450
15 850
400
800
350
14
750
300
700
13
250
650
200
12 600
150
550
100 11
500
0 2000 4000 6000 8000 10000 12000 14000

Distance, m

FWHP DP Flow Rate (MMscfd)

8
Badhra Compression Study – Current Data

Bad-11
10” CS

Bad-9 10” CS 16” CS Main Bhit Processing Plant

Bad – BN2 610 Psi


10” CS
Badhra New Gas Train 1
Bad-10 10” CS

Bad – 2
10” CS

Bad-BJ1 10” CS

Bad – BN1 520 Psi


10” CS
Badhra Gas Train 3
Bad -6 10” CS

WHC Fuel +
FWHP Flow Total Wellhead Suct. Press Disch. Press Engine Load Engine Speed WHC Fuel Liquid Flow
Well No.
(Psig) (MMscf)
Instt. Gas
flow (MMscf) Well No.
(MMscf) Psig Psig % RPM MMscf bbls MMscfd
Badhra-2 310 12.58 0.72 13.30
Bado Jabal-1 Dir A 317 0.94 0.00 0.94 Badhra-N 206 633 77 1000 0.96 66.0 40.6
Badhra B North-1 331 21.54 0.00 21.54 Badhra-2 299 643 75 1000 0.69 57.2 40.8
Badhra B North-2 242 6.42 0.00 6.42
Badhra 6 319 5.73 0.00 5.73
Badhra 9 325 7.88 0.00 7.88
Badhra-10 250 24.79 0.99 25.78
Badhra-11 238 8.04 0.00 8.04

Production Data from 1st April


9
BADHRA COMPRESSION STUDY (PROPOSED MODIFICATION)
 Flow from Badhra – 02 to Bhit plant is transfered via 10-inch, ~21 km flowline, while flow from Badhra – North
is transfered via 16-inch ~17.2 km flowline. Currently, badhra – 2 flowline is handling ~41 MMSCFD gas while
badhra – North flowline is handling ~47 MMSCFD gas.

 High pressure drop in badhra – 2 flowline will make it impossible to commingle it with other flowlines at plant.

 A crossover between Badhra 16-inch and 10-inch flowlines is propose to divert flow from 10-inch flowline to
16-inch flowline.

 Propose crossover will divert ~21 MMSCFD gas from 10-inch flowline to 16-inch flowline.

 Proposed modification will ultimately result in gain in production due to decrease in pressure drops.

10
BADHRA COMPRESSION Time frame for implementation

 Subect to JV approval and COF’s issued end August 2017

 Commence Civil works Badhra 10 area for installation of 1.9 compressor - 45 days

 Commence Pipe line modifications etc. For suction/ discharge and 16/ 10 inch cross over as required. 45 days

 Dismantling of Bhit 10 - 1.9 Compressor and relocation to Badhra - 28 days

 Installation of Bhit 10 compressor at Badhra - 40 days

 Compressor start up Mid November 2017

11
BADHRA COMPRESSION Time frame for implementation

 Subect to JV approval and COF’s issued end August 2017

 Commence Civil works Badhra 2 area for installation of Booster Compressor - 25 days

 Commence Pipe line modifications etc. For suction/ discharge and 16/ 10 inch cross over as required. -45 days

 Installation of 1.5 K.M. Pipe line from 16 /10 Inch tie in pit from Badhra 9 & suction / Discharge pipe- 45 days

 Dismantling of Bhit 16 Booster Compressor and relocation to Badhra - 21 days

 Installation of Bhit 16 Booster compresor at Badhra - 21 days

 Compressor start up Mid October 2017

12
Reservoir data (differential between DN case and three scenarios)
150 PSI 100 PSI 50 PSI
BD-2 BDJ BD-6 BN1 BN2 BD-9 BD-10 BD-11 Total BD-2 BDJ BD-6 BN1 BN2 BD-9 BD-10 BD-11 Total BD-2 BDJ BD-6 BN1 BN2 BD-9 BD-10 BD-11 Total
2017 Q1 0.9 0.5 1.2 1.3 0.6 2.4 1.7 0.6 9.1 1.9 0.7 1.4 1.7 0.8 2.7 2.7 0.8 12.7 1.3 0.8 1.6 1.8 0.9 2.8 3.3 0.8 13.3
2017 Q2 0.8 0.4 0.8 1.2 0.4 1.5 1.6 0.5 7.2 1.0 0.5 1.0 1.3 0.5 1.6 2.3 0.5 8.6 1.1 0.6 1.1 1.5 0.6 1.6 2.8 0.5 9.8
2017 Q3 0.5 0.2 0.6 0.6 0.5 0.8 0.1 3.3 0.8 0.4 0.8 1.1 0.3 0.8 1.8 0.3 6.4 1.0 0.5 1.0 1.3 0.3 0.9 2.4 0.3 7.6
2017 Q4 0.4 0.1 0.5 0.6 0.2 0.7 2.6 0.6 0.3 0.7 0.8 0.3 1.3 3.9 0.9 0.4 0.9 1.1 0.2 0.5 2.0 0.1 6.0
2018 Q1 0.4 0.4 0.6 0.2 0.5 2.0 0.6 0.6 0.6 0.8 0.3 1.1 4.0 0.9 0.7 0.9 1.3 0.2 0.5 2.0 0.1 6.6
2018 Q2 0.3 0.3 0.4 0.1 0.3 1.4 0.4 0.5 0.6 0.2 0.7 2.5 0.7 0.4 0.7 1.0 0.4 1.5 4.7
2018 Q3 0.1 0.2 0.3 0.0 0.7 0.3 0.4 0.5 0.1 0.6 1.9 0.6 0.6 0.9 0.3 1.3 3.8
2018 Q4 0.1 0.2 0.3 0.1 0.7 0.1 0.2 0.3 0.0 0.2 0.8 0.5 0.5 0.7 0.2 1.1 3.0
2019 Q1 0.1 0.1 0.0 0.2 0.2 0.2 0.3 0.1 0.2 1.0 0.3 0.4 0.5 0.1 0.7 2.0
2019 Q2 0.0 0.0 0.0 0.2 0.2 0.4 0.1 0.2 1.0 0.3 0.3 0.5 0.2 0.5 1.8
2019 Q3 0.1 0.1 0.2 0.1 0.2 0.3 0.2 0.1 0.8 0.2 0.3 0.4 0.2 0.4 1.6
2019 Q4 0.0 0.0 0.1 0.1 0.1 0.3 0.1 0.2 0.3 0.2 0.1 0.9
2020 Q1 0.1 0.1 0.2 0.2 0.1 0.2 0.2 0.2 0.7
2020 Q2 0.1 0.1 0.2 0.2 0.1 0.1 0.2 0.3 0.6
2020 Q3 0.2 0.2 0.2 0.2 0.1 0.1 0.3 0.3 0.8
2020 Q4 0.1 0.1 0.2 0.2 0.1 0.2 0.3 0.5
2021 Q1 0.1 0.1 0.3 0.3 0.1 0.3 0.4
2021 Q2 0.1 0.1 0.2 0.2 0.3 0.3
2021 Q3 0.2 0.2 0.3 0.3 0.3 0.3
2021 Q4 0.2 0.2 0.3 0.3 0.4 0.4
2022 Q1 0.2 0.2 0.3 0.3 0.4 0.4
2022 Q2 0.3 0.3 0.4 0.4 0.4 0.4
2022 Q3 0.3 0.3 0.4 0.4 0.5 0.5
2022 Q4 0.2 0.2 0.4 0.4 0.5 0.5
2023 Q1
2023 Q2
2023 Q3
2023 Q4

13
Badhra Compression Study – operator Proposed Network

3.0 KM 10” CS
Badhra 10 Area
Bad-11

Bad-9 10” CS 16” CS 16” CS

Main Bhit Processing Plant


Bad-10
-
BBN -2 10” CS
1.9 MW

23.5 KM - 16” CS
3.3 MW Badhra New Gas Train 1
BBN-1 10” CS

Badhra 2 Well site


10” CS -

Bad-6 1.9 MW
10” CS

Bad-2
22.2 KM 10” CS
Badhra Gas Train 3

BJ -1 10” CS

14
Badhra Compression Study – JVP Proposed Network

3.0 KM 10” CS
Badhra 10 Area
Bad-11

Bad-9 10” CS 16” CS 16” CS

Main Bhit Processing Plant


Bad-10
-
BBN -2 10” CS

23.5 KM - 16” CS
3.3 MW Badhra New Gas Train 1
BBN-1 10” CS

Badhra 2 Well site


10” CS -

Bad-6 1.9 MW
10” CS

Bad-2
22.2 KM 10” CS
Badhra Gas Train 3

BJ -1 10” CS

15
DONOTHING Badhra Compression Ph-3
PRODUCTION GROSS CAPEX KUSD OPEX KUSD PRODUCTION GROSS CAPEX KUSD OPEX KUSD

CAPEX CAPEX
SALES GAS FUEL GAS CONDENSATE CAPEX OPEX SALES GAS FUEL GAS CONDENSATE CAPEX OPEX
YEAR Below Ground Below Ground
MSCM MSCM Kbbl KUSD
KUSD KUSD MSCM MSCM Kbbl KUSD
KUSD KUSD

2017 736.10 46.99 10.51       2.90 0.18 0.04      

2018 550.80 35.16 7.86       34.27 2.19 0.49      

2019 405.72 25.90 5.79       10.40 0.66 0.15      

2020 298.74 19.07 4.26       5.96 0.38 0.09      

2021 219.94 14.04 3.14       (16.68) (1.06) (0.24)      

2022 161.98 10.34 2.31       (1.18) (0.08) (0.02)      

2023 119.32 7.62 1.70       27.66 1.77 0.39      

2024 47.32 3.02 0.68       - - -      

2025 - - -       - - -      
2026                        
2027                        
2028                        
2029                        
2030                        
2031                        
2032                        
2033                        

Cum MSCM 2,539.91 162.12 36.26 - - - 63.32 4.04 0.90 - - -


2702.0362 67.3657
95.4216 2.3790

ABANDONAMENT COSTS = 17480.8 KUSD ABANDONAMENT COSTS = KUSD

Scope considers relocation of one 1.9 MW machine & one booster machine from Bhit to
Badhra.

Profiles of these two actions have been merged together as combined action "Badhra
Compression Ph-3" with first gas dates as per E&C Presentation to JV 10-Jul-2017.

1.9 MW 15-Sep-2017
Booster 01-Nov-2017

DN is aligned with 2P DN of BMS-RIS Certification-II 2017 while action profile with new
FG dates will be reflected in BMS-RIS Certification-III.

16
Badhra IRS 2017 - Dynamic Model
DN + B9 & B11BC + 1BC & 1.9 Mw Case
Frist Gas : 1-OCt-2017

------ Do Nothing
------ Proposed by Operator
------ Proposed by JVP

17