BIM Uses

3D Coordination

A process used throughout the coordination process to determine conflicts of


geometry within the BIM model that would result in problems on site.
FEDERATED MODEL
https://www.youtube.com/watch?v=xI4H2OyOEvE
Naviswork
• Project review or analysis software for AEC professionals
• review integrated models and data with stakeholders to gain
better control over project outcomes.
• Integration, analysis, and communication tools help teams
coordinate disciplines, resolve conflicts, and plan projects
before construction or renovation begins.
Aggregate design data

• Naviswork can combine multiple file


formats into one single model file
Types of Naviswork software

• Naviswork Freedom
• Naviswork Simulate
• Naviswork Manage
Naviswork Freedom
• 3D viewer software
• Enables viewing of model hierarchy, object properties, and embedded review data,
including viewpoints, animations, redlines, and comments.
• Free viewer and supports NWD and 3D DWF Files
• Includes full set of navigation tools such as walkthrough
• Supports real time display of materials
Naviswork Simulate
• Real Time navigation
• Whole team review
• Model file and data aggregation
• Review toolkit
• NWD and 3D Pdf publishing
• Collaboration toolkit
• Photorealistic visualisation
• Object animation
• 5D scheduling
Naviswork Manage
• Real Time navigation
• Whole team review
• Model file and data aggregation
• Review toolkit
• NWD and 3D Pdf publishing
• Collaboration toolkit
• Photorealistic visualisation
• Object animation
• 5D scheduling
• Clash detection and management
File Format
• NWD-Complete data. Can beshared with
freedom and other naviswork software.
• NWF-Master file set with links to reference
others.Can not be opened in Naviswork
Freedom
• NWC- Created when exported from Revit or
brought in from AutoCAD
From Revit
-Install naviswork exporter tool
-Set up Navisworks 3D export view

From AutoCAD
-Set up view
-Save as DWG format
CLASH DETEC TION

https://www.youtube.com/watch?v=wl8s1AjIqBw
Practice ASSIGNMENT
Key Activities
1.Clash detection (write down and explain major clashes)
2.Quantity Takeoff (take off quantities logically).
3. Generate activity schedule and 4D model

Write a report
-Introduction
-Include the results of 1, 2 and 3
-Discussion
-Not more than 5 page and 2000 words
-Submit in two weeks
-Every group one submission
QUANTITY TAKE OFF

https://www.youtube.com/watch?v=Ad-mK9wuu7Y
SITE UTILISATION PLANNIG
A process in which BIM is used to graphically represent both permanent and
temporary facilities on site during multiple phases of the construction
process.

It may also be linked with the construction programme to convey space and
sequencing requirements.

Additional information incorporated into the model can include labour


resources, materials with associated deliveries, and equipment location.
BIM in Hawkins Infrastructure

Site office model in Revit and Archicad: L2W project ,2 selwood


road
BIM in Harker

Shaft 3D modelling to identify access to the sewer(City Rail


Link) Harker
https://www.youtube.com/watch?v=lvSP_I7Q2SU&list=PL2BDCF1F9E0F3459D

https://www.youtube.com/watch?v=w1VNJWwff7c

You might also like