With the support of GIZ-AEDB, PEDO has introduced the digital MHP datalogger

remote monitoring system locally made by BITSYM at SRSP Micro Hydro sites in Swat.
Are you looking for your realistic MHP plant data?

 How many hours MHPs remains operational


 What is load and how many units of energy supplied
 What is the power factor and Plant load or capacity
factor
 What is the load pattern as per your required interval
 How is the past data log sheet looks on (5min, hourly,
daily, weekly, monthly and yearly interval) download
and saved
 What is current performance by access it remotely
from anywhere

04/06/2021
MHP DATA LOGGER SYSTEM
LALKOO 150 kW MHP SWAT
View from
Camera

04/06/2021
Yearly Summary logs until 18.04.2019

Monthly Energy kWh Operati onal hours


35000 600

30000 28248 29011 496 489


500 457
26037
25000 24397
22694 22075 400 387
427 361
20000
15974 300
252
15000
200
10000
6426 109
5000 100

0 0
May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Mar-19 Apr-19 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Mar-19 Apr-19
04/06/2021
Implemented by

04/06/2021
LALKOO 150 kW MHP SWAT

JUNE DATA LOG RESULTS


Total Energy Production 29005 kWh Daily 966 kWh
Operational Hours (out of 720 489 hours Daily 16.3 hours
hours)
Average load 59.4 kW Peak 67 kW
Plant factor at current scenario 26.8 % If runs 24 hours daily can
improved to 39.6 %

General Observation
Mostly MHPs runs under frequency might be due to:
• Enough water is not available!!!
• Operator is opening the gate valve to allow sufficient water for maintain required demand about 80
kW at night and frequency!!!
• Operator is avoiding to run the MHP at higher load as belts needs to be replaced frequently and
heating up
• Or operator is alone and is not so sure about the stability of ELC therefore keep running the MHP at
minimum condition.
• The ELC has installed for two main purpose one is stabilize MHP and other is supply quality of
electricity to consumer (maintained voltages, frequency at 50 Hz)
• This might be reason that ELC adjusted not to disconnect village supply even when the frequency is so
low of less than 45 Hz.

04/06/2021 XXX
04/06/2021
04/06/2021
MHP DATA LOGGER SYSTEM
JULY DATA MHP SWAT

04/06/2021
LALKOO 150 kW MHP SWAT

JULY DATA LOG RESULTS 07.2018


Total Energy Production 22694 kWh Daily 1031 kWh
Operational Hours (out of 528 387.5 hours Daily 17.6 hours
hours) 22 days only
Average load 57.4 kW Peak 67 kW
Plant factor at current scenario 21 % If runs 24 hours daily can
improved to 39.6 %

General Observation Due to channel repair last 8 days MHP was shutdown
Mostly MHPs runs under frequency might be due to:
• Enough water is not available!!!
• Operator is opening the gate valve to allow sufficient water for maintain required demand about 80
kW at night and frequency!!!
• Operator is avoiding to run the MHP at higher load as belts needs to be replaced frequently and
heating up
• Or operator is alone and is not so sure about the stability of ELC therefore keep running the MHP at
minimum condition.
• The ELC has installed for two main purpose one is stabilize MHP and other is supply quality of
electricity to consumer (maintained voltages, frequency at 50 Hz)
• This might be reason that ELC adjusted not to disconnect village supply even when the frequency is so
low of less than 45 Hz.

04/06/2021 XXX
04/06/2021
04/06/2021
04/06/2021
Dashboard Display on 10th April 2019

04/06/2021
Hourly base log data Sheet on 11.04.2019

04/06/2021
Hourly base load curve on 11.04.2019

04/06/2021
Load curve

04/06/2021 XXX
Display on 18.04.2019

04/06/2021 XXX
Camera view 18.04.2019

04/06/2021

You might also like