Professional Documents
Culture Documents
remote monitoring system locally made by BITSYM at SRSP Micro Hydro sites in Swat.
Are you looking for your realistic MHP plant data?
04/06/2021
MHP DATA LOGGER SYSTEM
LALKOO 150 kW MHP SWAT
View from
Camera
04/06/2021
Yearly Summary logs until 18.04.2019
0 0
May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Mar-19 Apr-19 May-18 Jun-18 Jul-18 Aug-18 Sep-18 Oct-18 Mar-19 Apr-19
04/06/2021
Implemented by
04/06/2021
LALKOO 150 kW MHP SWAT
General Observation
Mostly MHPs runs under frequency might be due to:
• Enough water is not available!!!
• Operator is opening the gate valve to allow sufficient water for maintain required demand about 80
kW at night and frequency!!!
• Operator is avoiding to run the MHP at higher load as belts needs to be replaced frequently and
heating up
• Or operator is alone and is not so sure about the stability of ELC therefore keep running the MHP at
minimum condition.
• The ELC has installed for two main purpose one is stabilize MHP and other is supply quality of
electricity to consumer (maintained voltages, frequency at 50 Hz)
• This might be reason that ELC adjusted not to disconnect village supply even when the frequency is so
low of less than 45 Hz.
04/06/2021 XXX
04/06/2021
04/06/2021
MHP DATA LOGGER SYSTEM
JULY DATA MHP SWAT
04/06/2021
LALKOO 150 kW MHP SWAT
General Observation Due to channel repair last 8 days MHP was shutdown
Mostly MHPs runs under frequency might be due to:
• Enough water is not available!!!
• Operator is opening the gate valve to allow sufficient water for maintain required demand about 80
kW at night and frequency!!!
• Operator is avoiding to run the MHP at higher load as belts needs to be replaced frequently and
heating up
• Or operator is alone and is not so sure about the stability of ELC therefore keep running the MHP at
minimum condition.
• The ELC has installed for two main purpose one is stabilize MHP and other is supply quality of
electricity to consumer (maintained voltages, frequency at 50 Hz)
• This might be reason that ELC adjusted not to disconnect village supply even when the frequency is so
low of less than 45 Hz.
04/06/2021 XXX
04/06/2021
04/06/2021
04/06/2021
Dashboard Display on 10th April 2019
04/06/2021
Hourly base log data Sheet on 11.04.2019
04/06/2021
Hourly base load curve on 11.04.2019
04/06/2021
Load curve
04/06/2021 XXX
Display on 18.04.2019
04/06/2021 XXX
Camera view 18.04.2019
04/06/2021