You are on page 1of 9

R12I17B01 SAR-D&B-SHURAYRAH

BRIDGE AND MARINE JETTIES

Spill Drill
Mainland Temporary Jetty
30 March 2021

Ashraf Wardagy Wilme Olaivar Moez Ben Mbarek Azhar Hussain Mohammed
HSE Regional Manager Environmental Engineer Environmental Engineer Environmental Engineer
R12I17B01 SAR-D&B-SHURAYRAH BRIDGE AND
MARINE JETTIES

Setting:
 Conducted at 1400h in Mainland Temporary Jetty
 Spill during speed boat refueling
 Spill drill is participated by Spill Response Team, Titan II crew and speed
boat operator
 Mainland temporary jetty foreman establish contact to the ER hotline
number and ER coordinator to record the spill drill
 Weather condition is slightly windy
 Wind speed 17.3 km/h
 Wind direction N to S
R12I17B01 SAR-D&B-SHURAYRAH BRIDGE AND
MARINE JETTIES

Orientation on spill scenario Preparation of spill materials


R12I17B01 SAR-D&B-SHURAYRAH BRIDGE AND
MARINE JETTIES

Stop Work!
and establishing contact to the ER
hotline 055-982-7599 and ER
coordinator stating the spill drill in
Mainland Temporary Jetty
R12I17B01 SAR-D&B-SHURAYRAH BRIDGE AND
MARINE JETTIES

Deployment of booms led by SR member gave assistance to


site foreman established position of spill booms
R12I17B01 SAR-D&B-SHURAYRAH BRIDGE AND
MARINE JETTIES

Removal of spill materials Closing booms to contain residues


using absorbent pads on the water
R12I17B01 SAR-D&B-SHURAYRAH BRIDGE AND
MARINE JETTIES

Collection of contaminated spill materials


R12I17B01 SAR-D&B-SHURAYRAH BRIDGE AND
MARINE JETTIES

Disposal of contaminated materials in the designated bin located at the entrance of pontoon jetty
R12I17B01 SAR-D&B-SHURAYRAH BRIDGE AND
MARINE JETTIES

Mainland Temporary Jetty Spill Response Team Activity attendance