You are on page 1of 23

Circular flow 3

Text

Text

Text

1
Circular flow 4

Text

Text Text

Text

2
Circular flow 5

Text
Text

Text

Text

Text

3
Circular flow 6

Text
Text

Text

Text

Text
Text

4
Forces 7

Text

Text Text

Text

Text Text

Text

5
Forces 8

Text

Text Text

Text Text Text

Text Text

Text

6
Porter’s Five Forces

New entrants
• Text
• Text

Suppliers Internal competition Customers


• Text • Text • Text
• Text • Text • Text

Substitutes
• Text
• Text

7
Factors 1

Text

Text Text
Text
• Text
• Text
• Text
Text Text

Text

8
1. Background

Key Drivers

Added Value 2
Added Value 1 Added Value 3

Added Value 8 Text Added Value 4

Added Value 7 Added Value 5

Added Value 6

9
2x2 Matrix

High

 Product 5
 Product 1  Product 6

 Product 7
 Product 8
 Product 4
 Product 2
Label
 Product 10
 Product 3  Product 9

Low
Low Label High

10
Scoring 1 - Harvey Balls

Tip: use “ Harvey Ball” on the QPT toolbar to quickly draw and replace these shapes

Options Criterion 1 Criterion 2 Criterion 3 Criterion 4

• Comment • Comment • Comment • Comment


Option 1 • Comment • Comment • Comment • Comment

• Comment • Comment • Comment • Comment


Option 2 • Comment • Comment • Comment • Comment

Criteria Option 1 Option 2 Option 3 Option 4

• Comment • Comment • Comment • Comment


Criterion 1 • Comment • Comment • Comment • Comment

• Comment • Comment • Comment • Comment


Criterion 2 • Comment • Comment • Comment • Comment

Excellent Good Satisfactory Poor Very poor

Very high High Medium Low Very low

11
Scoring 3 - stars

Options Criterion 1 Criterion 2 Criterion 3 Criterion 4

Option 1

Option 2

Criteria Option 1 Option 2 Option 3 Option 4

Criterion 1

Criterion 2

Excellent

Good

Satisfactory

Poor

Very poor

12
Stages 2 - Traffic lights

Work stream Status


1. Work stream 1 • Comment

2. Work stream 2 • Comment

Critical issues / High criticality / Not desirable


Some issues / Medium criticality / Partially desirable
No issues / Low criticality / Very desirable

13
Project phases

Text Text Text

• Text • Text • Text


• • •
• • •
• • •
• • •
• • •
• • •

14
Process chart

Phase 1 Phase 2 Phase 3 Phase 4

Name of phase 1 Name of phase 2 Name of phase 3 Name of phase 4

Timing 2 weeks 4 weeks 3 weeks 2 weeks

Key Tasks • Task 1 • Task 1 • Task 1 • Task 1


• Task 2 • Task 2 • Task 2 • Task 2
• Task 3 • Task 3 • Task 3 • Task 3

15
Hints:
1 Calculate and enter the value corresponding to the area below the column in the row marked "Space"
2 Enter the height of the column in the row marked "Column" row
3 Add/remove columns and rows as required
4 Add series lines between the columns manually, if required
5 To change the height of the columns select Chart Options and turn on the y-axis, then use Format Axis/Scale to set the length
Waterfall chart 1 of the y-axis (check the “Automatic” button). Once the scale is set, use Chart Options again to remove the y-axis

1 11
2

Label A Label B Label C Label D Total

16
Grouped column chart 1

90

39
35
31 32
27
20 20

Label A Label B Label C Label D

Group 1 Group 2

17
Hints:
1 Insert columns as required (each will adopt a different color)
2 Double-click on a slice to change the color
Pie chart 3 In the options menu you can choose the rotation of the chart

Chart Title
100% = $150M
Other
10%

Label C
13%

Label A
59%
Label B
18%

18
Hints:
1 Insert columns to add slices in pie as required (each will adopt a different color)
2 Double-click on a slice to change the color
3 To insert segments in bar chart:
- Double-click on chart, click on either bar segment
- Right mouse -> Format Data Point…
Combination pie and column chart - Select Options tab, increase the number after “Second plot contains the last…”
- Insert columns as required

Chart Title
100% = $150M

Label B
28%

Label C1
14%

Label C
34%

Label C2
20%

Label A
38%

19
Hints:
1 Calculate the total and enter it in the "Sum" row (which is in a transparent bar)
2 Left align the total value (which is in a transparent bar)
3 Add the legend names manually
4 To change the width of the rows select Chart Options and turn on the x-axis, then
use Format Axis/Scale to set the length of the x-axis. Once the scale is set, use
Sub-divided bar chart Chart Options again to remove the x-axis

Group 1 Group 2

Label D 20 32 52

Label C 90 35 125

Label B 27 39 66

Label A 20 31 51

20
Hints:
1 Select a data series by clicking with the right mouse button on the bar
2 Choose an overlap in the options menu
Grouped bar chart 3 Add group names manually

32
Label D
20

35
Label C
90

39
Label B
60

31
Label A
20

Group 1 Group 2

21
Hints:
Insert the values for the coordinates x and y
Insert the size of the bubbles in the row “size“
Portfolio in three dimensions The axis and legend is drawn in PowerPoint. Resize and rescale them if necessary

Size = XY
Low High
100%

High
Y-Axis

Low

0% 100%
X-Axis
22
23

You might also like