CQI - 9
Why CQI 9
CQI - 9
Most of the heat treaters follow sampling plans and inspect products frequently.
Case studies
CQI - 9
Case study – 1 (Fastener)
Problem: Heavy decarbuisation observed on threads. Thread stripping observed due to
decarburisation
CQI 9: Section 3.7 addresses about monitoring of furnace atmospheres & 3.8 mentions
about back up verification of atmospheres
CQI - 9
Case study – 2 (Spring steel)
Mag. – 500x
CQI 9: Section 3.1 and 3.14 mentions monitoring of quench systems and analysis of
quench oil for presence of moisture content etc.,
CQI - 9 Case study – 3 (Low carbon steel)
Corrective action for decarb: Maintain proper furnace atmosphere and temperature cycle.
CQI 9: Section 3.7 addresses about monitoring of furnace atmospheres & 3.8 mentions
about back up verification of atmospheres and 2.15 ensures product testing as per requirements
CQI - 9 Case study – 4 (Crack in thro hardening)
Mag. – 50x
Corrective action for quench crack: Maintain quench oil level and ensure oil circulation
during quenching
CQI 9: Section 3.1 and 3.14 addresses about requirements on monitoring quench system.
CQI - 9 Case study – 5 (Crack in induction hardening)
Corrective action for crack: Decrease product runout and maintain quench concentration.
CQI 9: Section 3.15 addresses product positioning and 3.18 controls quench systems in
induction hardening.
CQI - 9 Case study – 6 (Failure due to phosphide embrittlement)
CQI 9: Section 1.8 ensures heat treaters review all heat treat operations and parameters on
a daily basis
CQI - 9 Case study – 7 (Grain boundary ferrites)
Mag. – 200x
CQI 9: Section 3.18 does not allow manual quenching in induction hardening process
CQI - 9 CQI - 9
Overview
System requirements
Process audit
Product audit
Equipment requirements
CQI - 9 Overview
Process tables:
- Each table has 4 sub sections
- 1.0 Process and test equipment requirements
- 2.0 Pyrometry
- 3.0 Process monitoring frequencies
- 4.0 In-process / final test frequencies
- 5.0 Quenchant and solution test frequencies
CQI - 9 Overview
Job audit:
- Suggested to conduct one heat treat part audit per year min.
(preferably safety or critical part)
- Performed at the end of audit (recommended)
- Is compliance type audit for specific part.
CQI - 9 Section 1 - Overview
Section 3: Equipment: