Allocation Unit
DESCRIPTION Jun-21 Jul-21 Aug-21 Sep-21 Oct-21 Nov-21 Dec-21 MA Historical
Equipment Allocation CAT 340 83%
EX 07 CAT 340 CAT 330 71%
EX 08 CAT 341 Iveco 380 Trakker 71%
EX X1 CAT 345 1 1 1 1 1 1 1 ACTROS 4043 AK 82%
Excavator EX X2 CAT 345 1 1 1 1 1 1 1 87%
Trakker 380 Coal Body
EX 14 CAT 340 1 1 1 1 1 1 1
OB Removal Iveco 682 Coal Body 55%
EX 15 CAT 340 1 1 1 1 1 1 1
Sub Total 4 4 4 4 4 4 4 New 87%
Iveco 380 Trakker 7 7 7 7 7 7 7
MERCY 4043 11 11 11 11 11 11 11
Dump Truck
FN527MC
Sub Total 18 18 18 18 18 18 18
EX 12 CAT 340 1 1 1 1 1 1 1
Excavator EX 13 CAT 340 - - - - - - -
Sub Total 1 1 1 1 1 1 1
Coal Wheel Loader WA 02 CAT950GC 1 1 1 1 1 1 1
Iveco 682 Coal Body 6 6 6 6 6 6 6
Dump Truck Iveco 380 Coal Body 5 5 5 5 5 5 5
Sub Total 11 11 11 11 11 11 11
CAT 320 3 3 3 3 3 3 3
CAT 330 1 1 1 1 1 1 1
M Grader CAT 120K 3 3 3 3 3 3 3
Dozer CAT D6R Class 5 5 5 5 5 5 5
Vibro Compac 1 1 1 1 1 1 1
Support
Tower Lamp 8 8 8 8 8 8 8
Fuel Truck 20 KL 1 1 1 1 1 1 1
Water Truck 20KL 1 1 1 1 1 1 1
Lube Truck PS Dutro 1 1 1 1 1 1 1
Crane Truck FM500(6X4) 1 1 1 1 1 1 1
Selwood H150 1 1 1 1 1 1 1
Pumping Pompa MF-360 1 1 1 1 1 1 1
Sykes 151I-SS 1 1 1 1 1 1 1
Sub Total 28 28 28 28 28 28 28
20 Mei 2021 Total 62 62 62 62 62 62 62
2
BEL - SEQUENCE
MINE SEQUENCE Juni 2021

Summary Plan Juni 2021


Activity Volume UoM
OB Removal (PIT4) 480.013 Bcm
6
5 Coal Getting 90.411 Ton
E.27 OB 114
1 PIT - ROM 30.723 Ton
KBCM Soil 5 KBCM 4 3
RL 50-45
Hauling PIT - CPP 59.688 Ton
E.15 Clay 33 KBCM
Cut To RL 45 2 Hauling ROM - PLTU 31.313 Ton

EX12 CG 90 KT Hauling ROM - PORT - Ton


E.14 OB 110 SR 5,31
KBCM Ekposed

DZ.04 RL 40-45
DZ.05 30, 25

E.28 Subsoil 110


KBCM RL 45-35
DZ.12 RL60
DZ.06 30, 25

E.13 Subsoil 110


KBCM RL 45
OB 1.356.000 BCM
Coal 386.000 MT
SR 3,51
* Up d a te Ba se On S it 0 1/0 4/2 012 1

RL 45

RL 40
RL 45
RL 40
RL 35

RL 45
RL 40

RL 50
RL 30

RL 60
BEL – SEQUENCE
Front OB & CG Utara

Mineable Expose

Front OB RL+40 Front OB RL+40 Front OB RL+40

Front OB cut to Expose


Front OB Utara cut RL 32
Front CG Utara
BEL – SEQUENCE

RL +55
RL +48 RL +48
RL +40
RL +37

RL +25
RL +33

RL +30