PSPP SYSTEM MANUAL

2009. 10. 19
Doosan Infracore
AM Marketing
Contents CS03.04_PSPP Management

Description Page No.

1. Retrieve PSPP target equipment 3

2. Register PSPP contract 5

3. Retrieve the contract list to identify newly registration of PSPP 8

4. Retrieve the contract list to PSPP contract 10

5. Cancel the PSPP contract 11

6. Retrieve the contract list to modify PSPP contract 12

7. Change the information of customer 13

8. Retrieve maintenance schedule 14

9. Change maintenance schedule 16

10. Retrieve maintenance schedule 18

11.Print out job list 20

2
Contents CS03.04_PSPP Management

Description Page No.

12. Register maintenance result 21

13. Display contract rate 27

14. Display parts requirements list 28

15. Publish the PSPP certificate 29

----------------------------------------------------------- ----------------
(END)----------------------------------------------------------

3
CS03.04_PSPP Management_
1.1. Target Equipment List
Task A. PSPP Quotation Mgmt
Process Id/Name CS.02.05.02 PSPP Quotation Management Menu Path PSPP> PSPP>
T-Code Name Target Equipment List T-Code Target Equipment List

Description 1. Retrieve PSPP target equipment

Overview of this screen T-code:


-This step is to retrieve the PSPP
target equipment in order to
recommend PSPP maintenance or
7 submit PSPP quotation to customer
or owner of Doosan equipment.
1
1. You can input various search option
in order to retrieve the PSPP target
equipment.
6
(Period, Search by, Dealer, Plan)
2
• Target 2. If you click the Model icon, then you
PSPP target
5 could see the new window.
machine(<= 3years
3 3. In order to search the model, please
6,000 hrs) input the model name
• Non target
Out of PSPP target 4 4. Select the model to be retrieved
5. And click the Search icon
• Contracted 6. Please select the Status of machine
Machines which are 7. After finishing to input the search
already contracted
option, please click the icon of
“Retrieve “.

4
CS03.04_PSPP Management_
1.2. Target Equipment List
Task A. PSPP Quotation Mgmt
Process Id/Name CS.02.05.02 PSPP Quotation Management Menu Path PSPP> PSPP>
T-Code Name Target Equipment List T-Code Target Equipment List

Description 1. Retrieve PSPP target equipment

8 Overview of this screen T-code:


-This step is to retrieve the PSPP
9 target equipment in order to
recommend PSPP maintenance or
submit PSPP quotation to customer
or owner of Doosan equipment.
10
8. Then you can get the result of your
inquiry.

9. If you would like to register the


PSPP contract, then please click the
order number.

10. You will see such message. If you


click OK, then you could directly
move to the screen to register PSPP
contract.

5
CS03.04_PSPP Management_
2.1. Contract
Task B. PSPP Contract Mgmt
Process Id/Name CS.02.05.03 PSPP Contract Management Menu Path PSPP> PSPP>
T-Code Name Contract T-Code Contract

Description 2. Register PSPP contract

Overview of this screen T-code:


-It is the step to register the
confirmed PSPP maintenance
contract between dealer and
2 customer or owner
1 1. You can input various search option
in order to retrieve the PSPP target
equipment.
(Period, Search by, Dealer, Plan)

2. After finishing to input the search


3 option, please click the icon of
“Retrieve “.

3. If you would like to register the


PSPP contract, then please click the
4 order number.

4. You will see such message. If you


click OK, then you could directly
move to the screen to register PSPP
contract.

6
CS03.04_PSPP Management_
2.2. Contract
Task B. PSPP Contract Mgmt
Process Id/Name CS.02.05.03 PSPP Contract Management Menu Path PSPP> PSPP>
T-Code Name Contract T-Code Contract

Description 2. Register PSPP contract

Overview of this screen T-code:


-It is the step to register the
5 6 confirmed PSPP maintenance
contract between dealer and
customer or owner
7 5. Please select the model

8 6. And, select the serial number

7. Please input the contract details


such as “Terms of Contract,
Contract Date, Visit Interval, Expire
Date, Contract W/Hour, AVG
9 W/Hour”

8. Please select Working Area

9. Please input the details of customer


information

7
CS03.04_PSPP Management_
2.3. Contract
Task B. PSPP Contract Mgmt
Process Id/Name CS.02.05.03 PSPP Contract Management Menu Path PSPP> PSPP>
T-Code Name Contract T-Code Contract

Description 2. Register PSPP contract

11 12 10 Overview of this screen T-code:


-It is the step to register the
confirmed PSPP maintenance
contract between dealer and
10 customer or owner

11 10. After inputting all data, please click


the scheduling icon

11. When all are done to input contract,


please click the check icon

12. If there are no problem at the step of


check, then please click the save
12 icon

8
CS03.04_PSPP Management_
3.1. Contract List
Task B. PSPP Contract Mgmt
Process Id/Name CS.02.05.03 PSPP Contract Management Menu Path PSPP> PSPP>
T-Code Name Contract List T-Code Contract List

Description 3. Retrieve the contact list to identify newly registration of PSPP

Overview of this screen T-code:


-It is the step to retrieve the contact
list for the registered PSPP
maintenance equipment

5 6 If you would like to retrieve the


1 2 contract list, then
1. Please input Model of the machine
2. And please input the serial no of the
3 4 machine
3. You can retrieve the contract as
using the period of contract date
4. You can retrieve the contract as
using “Contract No.”
7 5. Please click the retrieve icon
6. If you would like to download them
as Excel file, then please click the
export icon

7. If you would like to see the contract


details, please click the contract
number.

9
CS03.04_PSPP Management_
3.2. Contract List
Task B. PSPP Contract Mgmt
Process Id/Name CS.02.05.03 PSPP Contract Management Menu Path PSPP> PSPP>
T-Code Name Contract List T-Code Contract List

Description 3. Retrieve the contact list to identify newly registration of PSPP

Overview of this screen T-code:


8
9 -It is the step to retrieve the contact
list for the registered PSPP
maintenance equipment

8. Then you can see the contract


details.

9. You can select the option if you


want
-List: you can mover to the screen
of list
-Save: you can modify data and
save the result
-Delete: you can delete this contract
-Rescheduling: if there are
changes in this contract,
then you can do rescheduling
-Scheduled Maintenance: you
could see the scheduled
maintenance

10
CS03.04_PSPP Management_
3.3. Contract List
Task B. PSPP Contract Mgmt
Process Id/Name CS.02.05.03 PSPP Contract Management Menu Path PSPP> PSPP>
T-Code Name Contract List T-Code Contract List

Description 4. Retrieve the contact list to cancel PSPP contract

Overview of this screen T-code:


-It is the step to retrieve the contact
list of the registered PSPP
maintenance equipment in order to
cancel it
5 6
1 2 If you would like to retrieve and cancel
the contract list, then
1. Please input Model of the machine
3 4 2. And please input the serial no of the
machine
3. You can retrieve the contract as
using the period of contract date
4. You can retrieve the contract as
7 using “Contract No.”
5. Please click the retrieve icon
6. If you would like to download them
as Excel file, then please click the
export icon

7. If you would like to see the contract


details, please click the contract
number.

11
CS03.04_PSPP Management_
3.4. Contract List
Task B. PSPP Contract Mgmt
Process Id/Name CS.02.05.03 PSPP Contract Management Menu Path PSPP> PSPP>
T-Code Name Contract T-Code Contract

Description 5. Cancel the PSPP contract

Overview of this screen T-code:


8
9 -It is the step to cancel the registered
PSPP contact from the customer
request

8. Then you can see the contract


details.

9. If you would like to cancel this


contract, please click the Delete
icon

12
CS03.04_PSPP Management_
3.5. Contract List
Task B. PSPP Contract Mgmt
Process Id/Name CS.02.05.03 PSPP Contract Management Menu Path PSPP> PSPP>
T-Code Name Contract List T-Code Contract List

Description 6. Retrieve the contact list to modify PSPP contract

Overview of this screen T-code:


-It is the step to retrieve the contact
list of the registered PSPP
maintenance equipment in order to
modify it
5 6
1 2 If you would like to retrieve and
modify the contract list, then
1. Please input Model of the machine
3 4 2. And please input the serial no of the
machine
3. You can retrieve the contract as
using the period of contract date
4. You can retrieve the contract as
7 using “Contract No.”
5. Please click the retrieve icon
6. If you would like to download them
as Excel file, then please click the
export icon

7. If you would like to see the contract


details, please click the contract
number.

13
CS03.04_PSPP Management_
3.6. Contract List
Task B. PSPP Contract Mgmt
Process Id/Name CS.02.05.03 PSPP Contract Management Menu Path PSPP> PSPP>
T-Code Name Contract T-Code Contract

Description 7. Change the information of customer

8 Overview of this screen T-code:


13 11 12 -It is the step to update the changed
information of customer
-The information of customer include
“Owner/User, Tel, Mobile, Address,
Working Area, and Remark”.

8. Then you can see the contract


details.
9. You can modify the customer
information
10. You can modify the scheduled date
9 by each interval if it is needed
11. If there are some change in this
contract, please click the
Rescheduling icon

10 12. If you would like see “Scheduled


Maintenance Master”, please click
this icon
13. When all changes are done, please
click the Save icon

14
CS03.04_PSPP Management_
4.1. Inspection Schedule
Task C. PSPP Maintenance Scheduling
CS.02.05.04 PSPP Maintenance
Process Id/Name Menu Path PSPP> PSPP>
Scheduling
T-Code Name Inspection Schedule (Calendar) T-Code Inspection Schedule (Calendar)
Description 8. Retrieve maintenance schedule

Overview of this screen T-code:


-You can retrieve maintenance
schedule
3
1 2 1. Please input the month that you
would like to retrieve the inspection
schedule

2. You can select the status

3. Then please click the Retrieve icon


4
4. If you would like to see the details of
the inspection schedule, please click
the inspection

15
CS03.04_PSPP Management_
4.2. Inspection Schedule
Task C. PSPP Maintenance Scheduling
CS.02.05.04 PSPP Maintenance
Process Id/Name Menu Path PSPP> PSPP>
Scheduling
T-Code Name Inspection Schedule (Calendar) T-Code Inspection Schedule (Calendar)
Description 8. Retrieve maintenance schedule

Overview of this screen T-code:


-You can retrieve maintenance
schedule
4 4. Then you can see such screen
5. If you would like to see the contract
details, please click the contract
5 6 number
6. If you would like to see the
inspection detail, please click the
inspection interval.

16
CS03.04_PSPP Management_
4.3. Inspection Schedule
Task C. PSPP Maintenance Scheduling
CS.02.05.04 PSPP Maintenance
Process Id/Name Menu Path PSPP> PSPP>
Scheduling
T-Code Name Inspection Schedule T-Code Inspection Schedule
Description 9. Change maintenance schedule

Overview of this screen T-code:


-It is the step to modify the PSPP
maintenance schedule if there is
change request from customer
5 7
1 2 If you would like to change the
maintenance schedule, then
3 4 1. please input model
2. and please input serial number.
6 3. You can input the period of
scheduled date
4. Or you could input the status
8
5. When all are done, please click the
Retrieve icon

6. Then you can see such message.


7. As for the results, you can download
and print out them

8. If you would like to see the contract


to modify it, then please click the
contract number.

17
CS03.04_PSPP Management_
4.4. Inspection Schedule
Task C. PSPP Maintenance Scheduling
CS.02.05.04 PSPP Maintenance
Process Id/Name Menu Path PSPP> PSPP>
Scheduling
T-Code Name Inspection Schedule T-Code Inspection Schedule
Description 9. Change maintenance schedule

Overview of this screen T-code:


-It is the step to modify the PSPP
9
12 11 maintenance schedule if there is
change request from customer

9. Then you can see such screen, and


10 you can modify the information in it.

10. If you would like to change the


scheduled date, you can do that by
each interval.

11. When all changes are done, please


click the Rescheduling icon

12. And, click the Save icon

18
CS03.04_PSPP Management_
4.5. Inspection Schedule
Task D. PSPP Maintenance Result
Process Id/Name CS.02.05.05 PSPP Maintenance Result Menu Path PSPP> PSPP>
T-Code Name Inspection Schedule (Calendar) T-Code Inspection Schedule (Calendar)

Description 10. Retrieve maintenance schedule

Overview of this screen T-code:


-It is the step to retrieve the target
equipment for PSPP maintenance by
the service person in dealer
3 -After retrieving it, the service person
1 2 in dealer could do planning and
routing for service.

1. Please input the month that you


would like to retrieve the inspection
schedule

2. You can select the status

4
3. Then please click the Retrieve icon

4. If you would like to see the details of


the inspection schedule, please click
the inspection

19
CS03.04_PSPP Management_
4.6. Inspection Schedule
Task D. PSPP Maintenance Result
Process Id/Name CS.02.05.05 PSPP Maintenance Result Menu Path PSPP> PSPP>
T-Code Name Inspection Schedule (Calendar) T-Code Inspection Schedule (Calendar)

Description 10. Retrieve maintenance schedule

Overview of this screen T-code:


-It is the step to retrieve the target
equipment for PSPP maintenance by
4 the service person in dealer

4. Then you can see such screen


5. If you would like to see the contract
5 6 details, please click the contract
number
6. If you would like to see the
inspection detail, please click the
inspection interval.

20
CS03.04_PSPP Management_
4.7. Inspection Schedule
Task D. PSPP Maintenance Result
Process Id/Name CS.02.05.05 PSPP Maintenance Result Menu Path PSPP> PSPP>
T-Code Name Inspection Schedule T-Code Inspection Schedule

Description 11. Print out job list

Overview of this screen T-code:


-It is the step to print out job list of
PSPP maintenance
5 8 If you would like to change the
1 2 maintenance schedule, then
1. please input model
3 4 2. and please input serial number.
3. You can input the period of
6 scheduled date
4. Or you could input the status
5. When all are done, please click the
7 Retrieve icon

9 6. Then you can see such message.


7. Please select the line what you
would like to print out
8. Click the Print icon
9. Then you can see such screen and
print out it.

21
CS03.04_PSPP Management_
5.1. Inspection Result Entry
Task D. PSPP Maintenance Result
Process Id/Name CS.02.05.05 PSPP Maintenance Result Menu Path PSPP> PSPP>
T-Code Name Inspection Result Entry T-Code Inspection Result Entry

Description 12. Register maintenance result

Overview of this screen T-code:


-It is the step to enter the
maintenance result done by dealer
-The result have to include the
following information.
: “Scheduled Maintenance (Parts,
4
Maintenance Item), Inspection
1 2 3 Result, whether to use Non-genuine
parts, Inspection Reference Files,
Voice of Customer, Work required in
5 the future, Job required in the past”

In order to input the result,


1. Please input model of the machine
2. And, serial number of it
3. And select the interval
4. Then click the Retrieve icon

5. Please input the information of


“Inspection Date, Working Hour,
Inspector”

22
CS03.04_PSPP Management_
5.2. Inspection Result Entry
Task D. PSPP Maintenance Result
Process Id/Name CS.02.05.05 PSPP Maintenance Result Menu Path PSPP> PSPP>
T-Code Name Inspection Result Entry T-Code Inspection Result Entry

Description 12. Register maintenance result

6 Overview of this screen T-code:


-It is the step to enter the
maintenance result done by dealer
-The result have to include the
following information.

6. In the tab of Scheduled


Maintenance, you can leave the
inspection result by each item. You
can leave some comment in the
field of Remark.

23
CS03.04_PSPP Management_
5.3. Inspection Result Entry
Task D. PSPP Maintenance Result
Process Id/Name CS.02.05.05 PSPP Maintenance Result Menu Path PSPP> PSPP>
T-Code Name Inspection Result Entry T-Code Inspection Result Entry

Description 12. Register maintenance result

7 Overview of this screen T-code:


-It is the step to enter the
maintenance result done by dealer
-The result have to include the
following information.

7. In the tab of Inspection, you can


leave the inspection result by each
item. You can leave some comment
in the field of Remark.
8 9
8. In the tab of Non Genuine Parts
Usage, you can add the parts
information of it.
9. If you would like to add it, please
click the Add icon
9 10 10. When all required fields are done,
please click the Apply icon

24
CS03.04_PSPP Management_
5.4. Inspection Result Entry
Task D. PSPP Maintenance Result
Process Id/Name CS.02.05.05 PSPP Maintenance Result Menu Path PSPP> PSPP>
T-Code Name Inspection Result Entry T-Code Inspection Result Entry

Description 12. Register maintenance result

12 Overview of this screen T-code:


11
-It is the step to enter the
maintenance result done by dealer
-The result have to include the
14 following information.
12 13
13 11. In the tab of Required Work, you
could add the item to be required.
12. If you would like to add it, then
please click the Add icon
13. Choose the type of required work
16 14. And click the Apply icon
15

15. In the tab of Unexpected Work, you


could add the item for it.
18 16. If you would like to add it, then
16 17 please click the Ad icon
17 17. Choose the type of unexpected
work
18. And click the Apply icon

25
CS03.04_PSPP Management_
5.5. Inspection Result Entry
Task D. PSPP Maintenance Result
Process Id/Name CS.02.05.05 PSPP Maintenance Result Menu Path PSPP> PSPP>
T-Code Name Inspection Result Entry T-Code Inspection Result Entry

Description 12. Register maintenance result

20 Overview of this screen T-code:


19
-It is the step to enter the
maintenance result done by dealer
-The result have to include the
22 following information.
20 21
19. In the tab of “Work for the Next”, you
could add the item to be done in the
future.
20. If you would like to add it, then
please click the Add icon
23 21. Choose the type of required work
22. And click the Apply icon

23. In the tab of “Voice of customer”,


you could leave the opinion or
message from customer.

26
CS03.04_PSPP Management_
5.6. Inspection Result Entry
Task D. PSPP Maintenance Result
Process Id/Name CS.02.05.05 PSPP Maintenance Result Menu Path PSPP> PSPP>
T-Code Name Inspection Result Entry T-Code Inspection Result Entry

Description 12. Register maintenance result

Overview of this screen T-code:


24 25
-It is the step to enter the
maintenance result done by dealer
-The result have to include the
following information.

24. In the tab of “File”, you could attach


the relating documents.
25. If you would like to attach, please
26 click the icon.
26. And select the file what you want
27 27. And click the “Open” icon

28. Before clicking the Save icon,


please do marking in the field of
Confirm
29 29. When all are done, please click the
Save icon.
28

27
CS03.04_PSPP Management_
6.1. PSPP Analysis (Contract Rate)
Task E. PSPP Result Analysis & Certification
CS.02.05.06 PSPP Result Analysis and
Process Id/Name Menu Path PSPP> PAPP Analysis>
Certification
T-Code Name Contract Rate T-Code Contract Rate
Description 13. Display Contract Rate

Overview of this screen T-code:


2 4
-It is the report to retrieve the
1 contract summary between target
equipment and contracted
equipment of PSPP.
3

1. You can input various search option


in order to retrieve the contract rate
(Period, Search by, Dealer, Plan)

2. After finishing to input the search


option, please click the icon of
“Search “.

3. Then you can get the result of your


inquiry.
4. And you can download the result as
Excel file if you click the icon of
“Download

28
CS03.04_PSPP Management_
6.2. PSPP Analysis (Parts Requirement List)
Task E. PSPP Result Analysis & Certification
CS.02.05.06 PSPP Result Analysis and
Process Id/Name Menu Path PSPP> PAPP Analysis>
Certification
T-Code Name Parts Requirement List T-Code Parts Requirement List
Description 14. Display Parts Requirement List

Overview of this screen T-code:


-It is the report to provide and
retrieve the required parts list to be
needed in PSPP maintenance
2
1
4 1. You can input various search option
in order to get the parts requirement
3 list (Period, Search by, Dealer, Plan)

2. After finishing to input the search


option, please click the icon of
“Search “.

3. Then you can get the result of your


inquiry.
4. And you can download the result as
Excel file if you click the icon of
“Download

29
CS03.04_PSPP Management_
6.3. Contract Rate (Certification)
Task E. PSPP Result Analysis & Certification
CS.02.05.06 PSPP Result Analysis and
Process Id/Name Menu Path PSPP> PAPP Analysis>
Certification
T-Code Name Certification T-Code Certification
Description 15. Publish the PSPP certificate

Overview of this screen T-code:


-It is the step to publish the
certificate of PSPP for the qualified
equipment that the contracted PSPP
maintenance plan is done.
2
1 1. You can input various search option
in order to retrieve the equipment
after finishing PSPP contract and
4 print out the PSPP certificate
(Model/Serial No, Certificate Date,
3 Status)

2. After finishing to input the search


option, please click the icon of
“Search “.

3. Then you can get the result of your


inquiry.
4. You could print out certificate,
download the data, and see the
issue history of the certificate.

30
End Of Document