Table 2.

1: Wireline Logging Programme

SUITE DATE HOLE INTERVAL LOG SUITES COMMENTS


SIZE DEPTH
(INCH) (M-RTE)
1.1 3-Dec-04 12.25 18.3 - 541.7 PEX-HALS-BHC-GR Good quality data except interval 18-259m

2.1 20-Dec-04 12.25 552.8 - 1731.5 PEX-HALS-BHC-GR Good quality data.


2.2 20-Dec-04 12.25 952 - 1665 RFT-GR 25 of 45 pts are valid. 2 samples recovered.
2.3 22-Dec-04 12.25 966.5 - 1567.5 CST-GR 3 runs - only 43 recoverd from 60 bullets.

3.1 23-Jan-05 8.5 1735 - 2904.6 PEX-HALS-BHC-GR Good quality data.


3.2 24-Jan-05 8.5 1400 - 2873 DSI-GPIT Could not pass 2888m. Good data.
3.3 25-Jan-05 8.5 1774 - 2222 RFT-GR Could not pass 2475m. All 28 points invalid.
3.4 27-Jan-05 8.5 500 - 2825 VSP Could not pass down 2835m.
3.5 28-Jan-05 8.5 1774 - 2877 CST-GR 19 recovered of 30 bullets

February 2005
Table 2.3.1: RFT Result Summary in 12-1/4” hole
Depth Test Formation Quartz Gauge Density Gradient BHT
Depth
m RTE No. Pform Phyd bfr Phyd aft Mobility (E-Log) psi/ft DegF Comments
mSS
(psia) (psia) (psia) mD/cp g/cm3
952.0 -516.2 1 Dinder -1 1831.4 1830.9 2.4115 138.3 Dry
967.5 -531.7 2 Dinder -1 1350.16 1860.3 1859.9 1.20 2.4820 138.9 Normal
972.5 -536.7 3 Dinder -1 1380.67 1869.3 1868.9 1.20 2.3133 139.1 Normal
988.0 -552.2 4 Dinder -1 1418.91 1898.4 1902.8 6.00 2.3535 0.752 139.3 Normal
1015.0 -579.2 5 Dinder -2 1415.65 1954.3 1954.0 5.70 2.4344 139.5 Normal
1027.5 -591.7 6 Dinder -2 1430.15 1977.8 1977.7 1.30 2.4417 0.354 139.6 Normal
1042.0 -606.2 7 Dinder -2 1450.38 2005.3 2005.0 25.50 2.3864 0.425 139.9 Normal
1180.0 -744.2 8 Dinder -2 1645.53 2267.6 2267.4 8.40 2.3968 0.431 141.5 Normal
1187.0 -751.2 9 Dinder -2 2280.61 2280.7 2.4416 142.1 Dry
1195.0 -759.2 10 Dinder -2 1666.73 2295.8 2295.5 5.20 2.3681 142.3 Normal
1380.0 -944.2 11 Dinder -2 1928.38 2647.8 2647.4 2.60 2.4406 0.431 145.5 Normal
1382.0 -946.2 12 Dinder -2 1930.98 2651.1 2650.9 4.40 2.4248 0.396 145.8 Normal
1398.0 -962.2 13 Dinder -2 1953.44 2681.4 2681.1 30.40 2.3759 0.428 146.1 Normal
1408.0 -972.2 14 Dinder -2 1967.65 2700.2 2700.0 21.20 2.4013 0.433 146.3 Normal
1506.5 -1070.7 15 Dinder -2 2887.7 2887.2 2.4717 148.6 Dry
1512.0 -1076.2 16 Dinder -2 2135.74 2897.6 2897.2 20.30 2.3045 149.3 Normal
1515.5 -1079.7 17 Dinder -2 2136.49 2903.9 2903.6 48.20 2.3364 0.065 149.6 Normal
1518.0 -1082.2 18 Dinder -2 2136.51 2908.4 2912.1 112.80 2.3463 0.002 149.9 Normal (4 psi change in Hydrost)
1521.5 -1085.7 19 Dinder -2 2137.43 2918.6 2918.3 3.90 2.3200 0.080 150.3 Normal
1520.5 -1084.7 21 Dinder -2 2136.78 2916.1 2916.0 59.70 2.3176 0.198 150.6 Normal
1523.0 -1087.2 20 Dinder -2 2137.31 2921.1 2920.9 145.20 2.3570 0.065 150.5 Normal
1526.5 -1090.7 22 Dinder -2 2139.73 2927.3 2927.0 6.30 2.4424 150.7 Normal
1532.0 -1096.2 24 Dinder -2 2147.45 2937.1 2936.9 0.90 2.4590 150.9 Normal
1532.5 -1096.7 23 Dinder -2 2147.99 2938.4 2938.1 0.20 2.4517 150.8 Supercharged?
1534.0 -1098.2 26 Dinder -2 2153.57 2940.4 2939.9 0.50 2.4901 151.1 Supercharged
1535.0 -1099.2 25 Dinder -2 2942.6 2942.6 25.70 2.5149 151.0 Dry
1536.0 -1100.2 29 Dinder -2 2943.0 2942.8 2.4838 151.4 Dry
1537.0 -1101.2 27 Dinder -2 2192.54 2945.7 2945.4 0.20 2.4755 151.2 Supercharged
1537.5 -1101.7 28 Dinder -2 2946.2 2946.1 2.5730 151.3 Dry
1544.0 -1108.2 30 Dinder 2 2170.94 2958.0 2957.3 0.20 2.4586 151.4 Supercharged
1545.0 -1109.2 31 Dinder 2 2959.2 2959.0 2.5810 151.5 Dry
1550.5 -1114.7 32 Dinder 2 2168.32 2974.4 2974.0 7.80 2.3569 151.6 Normal
1554.0 -1118.2 33 Dinder 2 2172.39 2980.8 2980.5 4.90 2.3980 0.354 151.7 Normal
1562.0 -1126.2 34 Dinder 3 2183.93 2996.0 2995.7 9.70 2.3637 0.440 151.8 Normal
1566.50 -1130.7 35 Dinder 3 2190.67 3004.43 3004.1 10.40 2.4285 0.457 151.9 Normal
1572.00 -1136.2 36 Dinder 3 2198.49 3014.75 3014.4 2.90 2.4566 0.433 151.9 Normal
1578.00 -1142.2 37 Dinder 3 3025.86 3025.7 2.4512 152.1 Dry
1615.00 -1179.2 38 Dinder 3 3096.53 3096.3 2.5932 152.2 Dry
1615.50 -1179.7 39 Dinder 3 3097.11 3096.9 2.6176 152.6 Lost Seal
1616.50 -1180.7 40 Dinder 3 3098.86 3098.8 2.5007 152.8 Dry
1631.50 -1195.7 41 Dinder 3 3126.88 3126.6 2.6065 155.1 Dry
1661.00 -1225.2 42 Dinder 3 3185.55 3185.2 2.4883 155.2 Dry
1661.50 -1225.7 43 Dinder 3 3186.03 3185.7 2.3573 155.5 Dry
1664.50 -1228.7 45 Dinder 3 3190.54 2.3450 156.2 Limited drawdown
1665.00 -1229.2 44 Dinder 3 3192.40 3191.8 0.90 2.4120 155.7 Limited drawdown
1550.50 Dinder 2 2167.70 2973.00 2871.20 2.30 154.5 Sample
1518.00 Dinder 2 2136.11 2909.00 2908.90 6.00 151.7 Sample
February 2005
Table 2.3.2: RFT Result Summary in 8-1/2” hole

Depth Sr Formation Quartz Gauge Density Gradient BHT


Depth
m RTE No. Pform Phyd bfr Phyd aft Mobility (E-Log) psi/ft DegF Comments
mSS
(psia) (psia) (psia) mD/cp g/cm3
1774.0 -1338.2 1 Dinder -2 35.57 3599.2 Dry
1774.5 -1338.7 2 Dinder -2 27.77 3599.6 Dry
1775.0 -1339.2 3 Dinder -2 27.72 3603.0 Dry
1776.0 -1340.2 4 Dinder -2 25.60 3605.5 Dry
1823.0 -1387.2 5 Dinder -2 24.84 3705.7 Dry
1824.5 -1388.7 6 Dinder -2 23.43 3706.8 Dry
1826.0 -1390.2 7 Dinder -2 23.05 3708.3 Dry
1892.5 -1456.7 8 Dinder -2 Lost seal
1892.7 -1456.9 9 Dinder -2 Lost seal
1903.0 -1467.2 10 Dinder -2 21.87 3863.8 Dry
1903.5 -1467.7 11 Dinder -2 26.64 3862.5 Dry
1903.8 -1468.0 12 Dinder -2 3858.0 Dry
1904.3 -1468.5 13 Dinder -2 Lost seal
1904.5 -1468.7 14 Dinder -2 43.89 Lost seal
1905.0 -1469.2 15 Dinder -2 Lost seal
1905.5 -1469.7 16 Dinder -2 Dry
1917.5 -1481.7 17 Dinder -2 20.81 3889.5 Dry
1918.0 -1482.2 18 Dinder -2 21.69 3887.3 Dry
1919.0 -1483.2 19 Dinder -2 22.98 3887.3 Dry
2036.5 -1600.7 20 Dinder -2 20.33 4130.8 Dry
2037.5 -1601.7 21 Dinder -2 Lost seal
2085.5 -1649.7 22 Dinder -2 Lost seal
2087.5 -1651.7 23 Dinder -2 21.79 4228.6 Dry
2088.5 -1652.7 24 Dinder -2 23.38 4226.0 Dry
2089.0 -1653.2 25 Dinder -2 4128.30 4224.7 Supercharged/ not stabilized
2092.5 -1656.7 26 Dinder -2 100.62 4225.5 Dry
2221.5 -1785.7 27 Dinder -2 51.90 4502.1 Dry
2222.0 -1786.2 28 Dinder -2 48.61 4493.6 Dry
RFT tool could not past 2475 mRTE, consequently the last 13 points were left un-surveyed.

February 2005
Figure 4.1: Net Pay Cutoff Determination
HPV VS VCL

0.05

VCL cutoff
0.04 @ 0.50

0.03
HPV

0.02

0.01

0.00
0 0.2 0.4 0.6 0.8 1 1.2
VCL (fraction)

HPV VS TOTAL POROSITY

0.05

0.04
PHIT cut-off
@ 0.10
0.03
HPV

0.02

0.01

0.00
0 0.05 0.1 0.15 0.2 0.25 0.3 0.35 0.4
PHIT (fraction)

HPV VS WATER SATURATION

0.05

0.04
SW cut-off
@ 1.00

0.03
HPV

0.02

0.01

0.00
0.00 0.10 0.20 0.30 0.40 0.50 0.60 0.70 0.80 0.90 1.00 1.10
SWT (fraction)

February 2005
Table 5.1: Petrophysical Result Summary
Well: Hosan-1 RTE (m): 435 Date: Feb 2005
Formation top base gross interval net sand phit swt net/gross netpay Fluid Remarks
Unit (m-rte) (m-rte) (m) (m) (frac.) (frac.) (m)
Dinder-1 670.00 720.00 50.00 30.33 0.216 1.000 0.607 Water
Dinder-1 720.00 820.00 100.00 56.24 0.238 1.000 0.562 Water
Dinder-1 820.00 950.00 130.00 82.60 0.196 1.000 0.635 Water
Dinder-1 950.00 990.00 40.00 22.40 0.181 1.000 0.560 Water
Dinder-2 990.00 1170.00 180.00 129.84 0.146 1.000 0.721 Water Gradient=0.414psi/ft
Dinder-2 1170.00 1200.00 30.00 25.45 0.154 1.000 0.848 Water Gradient=0.414psi/ft
Dinder-2 1200.00 1370.00 170.00 107.29 0.145 1.000 0.631 Water
Dinder-2 1370.00 1450.00 80.00 34.29 0.143 1.000 0.429 Water Gradient=0.414psi/ft
Dinder-2 1450.00 1500.00 50.00 6.10 0.174 1.000 0.122 Water
Dinder-2 1500.00 1530.00 30.00 16.31 0.173 0.598 0.544 15.4 Gas Gradient=0.053psi/ft
GDT=1527.0mrte
Dinder-2 1530.00 1550.00 20.00 8.69 0.123 0.985 0.434 Tight Shaly reservoir
Dinder-2 1550.00 1615.00 65.00 23.47 0.145 1.000 0.361 Water Gradient=0.44psi/ft
Dinder-2 1615.00 1655.00 40.00 2.74 0.194 1.000 0.069 Water Shaly reservoir
Dinder-2 1655.00 1670.00 15.00 4.72 0.161 1.000 0.315 Water
Dinder-2 1670.00 1720.00 50.00 2.74 0.196 1.000 0.055 Water Shaly reservoir
Dinder-2 1736.00 1767.00 31.00 2.90 0.186 1.000 0.093 Water Shaly reservoir
Dinder-2 1767.00 1770.00 3.00 0.61 0.146 1.000 0.203 Water Tight
Dinder-2 1770.00 1778.00 8.00 2.59 0.117 1.000 0.324 Water Tight
Dinder-2 1778.00 1823.00 45.00 1.07 0.121 1.000 0.024 Water Shale
Dinder-2 1823.00 1827.00 4.00 0.91 0.105 1.000 0.229 Water Tight
Dinder-2 1827.00 1830.00 3.00 0.00 0.000 1.000 0.000 No Net Sand
Dinder-3 1830.00 1892.00 62.00 1.52 0.188 1.000 0.025 Water No Net Sand
Dinder-3 1892.00 1902.00 10.00 1.37 0.112 0.906 0.137 Water Tight
Dinder-3 1902.00 1906.00 4.00 3.20 0.149 0.988 0.800 Water Tight
Dinder-3 1906.00 1915.00 9.00 0.00 0.000 1.000 0.000 No Net Sand
Dinder-3 1915.00 1920.00 5.00 0.91 0.096 1.000 0.183 No Net Sand
Dinder-3 1920.00 2036.00 116.00 0.00 0.000 1.000 0.000 No Net Sand
Dinder-3 2036.00 2038.00 2.00 1.52 0.156 1.000 0.762 P.Gas Shaly reservoir
Dinder-3 2038.00 2082.00 44.00 0.00 0.000 1.000 0.000 No Net Sand
Dinder-3 2082.00 2093.00 11.00 4.11 0.123 0.958 0.374 Water Shaly reservoir
Dinder-3 2093.00 2203.00 110.00 1.98 0.163 1.000 0.018 Water Shaly reservoir
Dinder-3 2203.00 2207.00 4.00 0.00 0.000 1.000 0.000 No Net Sand
Dinder-3 2207.00 2220.00 13.00 0.00 0.000 1.000 0.000 No Net Sand
Dinder-3 2220.00 2225.00 5.00 1.83 0.103 1.000 0.366 Water Tight
Dinder-3 2225.00 2373.00 148.00 0.00 0.000 1.000 0.000 No Net Sand
Dinder-3 2373.00 2580.00 207.00 0.00 0.000 1.000 0.000 No Net Sand
Blue Nile 2580.00 2589.00 9.00 0.61 0.095 1.000 0.068 No Net Sand
Blue Nile 2589.00 2600.00 11.00 1.68 0.099 1.000 0.152 Water Tight
Blue Nile 2600.00 2612.00 12.00 2.13 0.102 1.000 0.178 Water Tight
Blue Nile 2612.00 2624.00 12.00 1.68 0.133 1.000 0.140 Water Shaly reservoir
Blue Nile 2624.00 2634.00 10.00 3.05 0.114 1.000 0.305 Water Shaly reservoir
Blue Nile 2634.00 2649.00 15.00 0.61 0.084 1.000 0.041 No Net Sand
Blue Nile 2649.00 2666.00 17.00 2.90 0.107 1.000 0.170 Water Tight
Blue Nile 2666.00 2677.00 11.00 2.29 0.107 1.000 0.208 Water Tight
Blue Nile 2677.00 2696.00 19.00 6.25 0.101 1.000 0.329 Water Tight
Blue Nile 2696.00 2770.00 74.00 10.36 0.132 1.000 0.140 Water Shaly reservoir
Blue Nile 2770.00 2800.00 30.00 0.15 0.083 1.000 0.005 No Net Sand
Blue Nile 2800.00 2900.00 100.00 0.00 0.000 1.000 0.000 No Net Sand
February 2005
Figure 6.1: Lower Dinder-2 Log Analysis

Log Results:
Net Pay=15.4 m
Porosity=17.3%
Sw=59.8%

PGWC=1530.6mrte

February 2005
Figure 6.2: Overall RFT Pressure Plot
900 Hosan-1 :
Pressure Data

Water Gradient : 0.414 psi/ft


1000

1100

Water Gradient : 0.414 psi/ft


1200
D ep th (m -rte)

1300

1400
Gas Gradient :
0.053 psi/ft

1500

1600
Water Gradient : 0.44 psi/ft

Pressure (psia)
1700
1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 2300
February 2005
Figure 6.3: RFT Pressure Plot across Dinder-2 reservoir
1500 Hosan-1
GG G :

Pressure Data

1510

Gas Gradient : 0.053


1520
psi/ft

All the pretest (between


1530 PGWC=1530.6mrte depth 1530 - 1550 m-rte)
are tight .

1540
D e p th (m -rte )

1550

Water Gradient : 0.44 psi/ft


1560

1570

1580

1590

Pressure (psia)
1600
2100 2125 2150 2175 2200 2225 2250
February 2005
Figure 6.4: DSI study: Vp/Vs – DTCO crossplot

Based on VPVS versus


DTCO crossplots,
it detected the strong gas
presence in the depth
interval from 1510 to
1525 m-RTE.

February 2005
Figure 6.5: Dinder-3 Log Analysis

TOP DINDER-3

Log Results:
Depth (mrte): 1902-1906
Net Sand=3.2 m
Porosity=14.9%
Tight Formation

Log Results:
Depth (mrte): 2036-2038
Net Sand=1.5 m
Porosity=15.6%
Tight Gas Formation

Log Results:
Depth (mrte): 2082-2093
Net Sand=4.1 m
Porosity=12.3%
Tight Water Formation

February 2005
Figure 6.6: Blue Nile Log Analysis

TOP Blue Nile

Log Results:
Depth (mrte): 2666 - 2677
Net Sand=2.1 m
Porosity=10.2%
Tight Formation

Log Results:
Depth (mrte): 2800 – 2900
No Net Sand
Very Tight Formation