0% 10% 20% 30% 40% 50% 60% 70% 80% 90% 100%
METHODS: Data resulting from independent randomly survey to the students of the University of Mindanao at Matina campus
were submitted to descriptive, correlational, and inferential statistical analyses to evaluate selected questions to determine if the
product is helpful.
Results: Analyses of available data from chosen student of the University of Mindanao revealed good to excellent
reliability and validity of the product. Specifically, data were presented comparing our product to other chargeable
electrical generator.
Conclusion: The dynamo as electric generator is also reliable and valid in terms of saving energy in households, but
theres a problem may vary because it can only last depending on the power supply.
Research Local
The year 2016 is characterized by a significant increase in electricity consumption at 10% and peak
demand at 8.7% attributed to several factors such as the increase in temperature and utilization of cooling
equipment aggravated by the strong El Niño, the conduct of National and Local elections during the first
half of the year, increase in economic growth, and entry of large power generating plants. The residential
and industrial sectors remained the major drivers of electricity consumption in the country while Luzon
remained the largest on a per grid basis.Notably, the growth of the country’s supply base supplemented
the increase in demand with the growth of total installed capacity at 14% from 18,765 MWh (2017) to
21,423 MWh (2018) majority coming from coal-fired power plants. Among the three grids, Mindanao has
the highest recorded growth in terms of capacity at 31% from 2017-2018. From 2017-2025 a total of 5,068
MW committed projects are expected to come online. The DOE is continuously encouraging investments
in power generation in view of the increasing peak demand which is expected to grow by more than triple*
in 2040.Along with supply security, the DOE also embarks on increasing the reliability and resiliency of the
system. In 2017, several yellow and red alerts were declared by the system operator in Luzon and
Visayas in addition to the major grid disturbances and load dropping incidents.