INTRODUCTION
 Site Visit was conducted on 11th Kartik 2078.
 Bhaise Road was selected as a site for field study.
CASE 1:-
Bio Engineering
OBJECTIVES:

 To identify cause of mass movement(Landslide)


 To identify failure mechanism and triggering factor
 To find out preventive measure and mitigation solutions
 To enhance knowledge and skills
 Use of different bioengineering techniques based on the engineering functions
required for the mitigation of the slope.
 To enhance knowledge and understanding on Bioengineering and its
justification for the selection of the technique
 To strengthen knowledge for the characterizing the functional requirement of
technique for stabilizing instability based on the mechanism of failure
 To design the different bioengineering techniques.
INSTRUMENT/APP USED:

 Measuring Tape

PROCEDURES:

 Site observe
 Observe landslide and its geographical structure
 Observe hill slope, Types of soil, angle of friction
 Observe drainage condition
 Parameters used for the classification of soil
 As per the Hill slope and soil condition Use of different bioengineering
techniques based on the engineering functions required for the mitigation of
the slope.
KEY FEATURES :

 Slope Angle: Approximately 45˚


 Slope Material: Fellite rock
 Slope Height: About 5 m
 Geological Zone : Lesser Himalaya
 Triggers: Toe Cutting, Poor drainage condition
INVESTIGATION:
 Soil Type
• Colluvial soil
 Site Moisture
• Damp
 Rock Investigation
• Metamorphic rock
 Hydrological Features
• Slightly damp
 Mitigation Measures
• Construction of Gabion
• Slope Trimming
• Grass plantation
 Species used
• Amlison, Kans, Khus, Grass
 Function of Grass plantation
• Armor and reinforce
Species selection flow chart
Bioengineering
Site
Site environmental
Site requirement conditions
Engineering Availability of
functions required Choice of materials including
vegetative ease of propagation
General plant types
techniques
which are stable Human factors

Structural Range of possible


Final
characteristics species
choice of
required
species
Integration- Plantation and Civil
Structures
CONCLUSION:

 Detail Investigation about geology, geomorphology, hydrology


must be done before making track as far as possible.
 Alignment selection should be made clear.
 Excavation should be done against the bedding plane while
selecting road alignment
 Toe cutting should be cut in feasible slope.
 Water management should be done.
 During Construction if daylighting condition shown, slope
should be maintain such that surplus load must not be applied.
 To minimize causalities, proper notice board should be
installed and safe deposition area should be made by extra
widening of road.
 Surplus load should be remove during construction of road

You might also like