The document discusses transformer vector groups, which categorize the configurations of high voltage and low voltage windings in three-phase transformers using an IEC convention. Determining the vector group is important before connecting multiple transformers in parallel, as transformers with different vector groups will produce circulating currents. Common vector groups include YNd11, Dy1, Yy0, and Dd0 based on winding configurations and phase angle differences between windings.
The document discusses transformer vector groups, which categorize the configurations of high voltage and low voltage windings in three-phase transformers using an IEC convention. Determining the vector group is important before connecting multiple transformers in parallel, as transformers with different vector groups will produce circulating currents. Common vector groups include YNd11, Dy1, Yy0, and Dd0 based on winding configurations and phase angle differences between windings.
The document discusses transformer vector groups, which categorize the configurations of high voltage and low voltage windings in three-phase transformers using an IEC convention. Determining the vector group is important before connecting multiple transformers in parallel, as transformers with different vector groups will produce circulating currents. Common vector groups include YNd11, Dy1, Yy0, and Dd0 based on winding configurations and phase angle differences between windings.
Department of Electrical & Computer Engineering, CUI, Abbottabad Campus
Background For confirming the specifications and performances of an electrical power transformer it has to go through a number of testing procedures. Some tests are done at a transformer manufacturer premises before delivering the transformer. Routine tests of transformer include Winding resistance test of transformer Transformer ratio test Transformer vector group test Measurement of impedance voltage/short circuit impedance (principal tap) and load loss (Short circuit test) Measurement of no load loss and current (Open circuit test) Measurement of insulation resistance Oil pressure test on transformer to check against leakages past joints and gaskets
Department of Electrical & Computer Engineering, CUI, Abbottabad Campus
Definition In electrical engineering, a vector group, officially called a connection symbol, is the International Electro-technical Commission (IEC) method of categorizing the high voltage (HV) windings and low voltage (LV) winding configurations of three- phase transformers.
The vector group designation indicates the windings
configurations and the difference in phase angle between them.
Department of Electrical & Computer Engineering, CUI, Abbottabad Campus
Purpose The Determination of vector group of transformers is very important before connecting two or more transformers in parallel.
If two transformers of different vector groups are
connected in parallel then phase difference exist between the secondary of the transformers and large circulating current flows between the two transformers which is very detrimental.
Department of Electrical & Computer Engineering, CUI, Abbottabad Campus
Nameplate
Department of Electrical & Computer Engineering, CUI, Abbottabad Campus
Connections
Department of Electrical & Computer Engineering, CUI, Abbottabad Campus
Conventions
Department of Electrical & Computer Engineering, CUI, Abbottabad Campus
Groups
Department of Electrical & Computer Engineering, CUI, Abbottabad Campus
Groups
Department of Electrical & Computer Engineering, CUI, Abbottabad Campus
Simulations
Department of Electrical & Computer Engineering, CUI, Abbottabad Campus