Slop Storage and CBD: Details of The Systems in MR2
Slop Storage and CBD: Details of The Systems in MR2
Dimension (m) 2*6.5 • There are two radar LT with LI and two TE with TT and TI.
(ID x T-T)
• The mixer and pump have an interlock (I-3012) based on the level
(LALL) and temperature (TAHH) in the vessel. If the interlock is
activated the pump will stop and the mixer shall trip.
Storage Capacity 15 m3
• The Pump discharge has a PI and NRV and it splits into two lines, a
2’’ CBD return line having two valves (one globe) that joins the 2’’
FLO line and falls back into the vessel and another 6” Slop header.
• Gas detector have been provided near the CBD vessel with alarm
in DCS C/R.
Slop Storage
Slop Transfer
OWS and Oil Catcher
Details of the systems in MR2