Agenda
• Introductions
• Shane Metzger, COO DBM Global
• Mike Lampert, CEO Graywolf
• Patrick Phister, VP Milco National
• DBM Overview
• Graywolf Industrial
• Schuff Steel
• pdc/BDS Vircon
• Model benefits
• Planning
• Cost reduction
• Constructability
• Case studies
• Questions
DBM Global is focused on delivering world class, sustainable value to its
clients through a highly collaborative portfolio of companies which
provide better designs, more efficient construction and superior asset
management solutions.
Capabilities
• Heavy Mechanical Industries
• Piping • Power
• Equipment Setting • Refinery
• HRSG Erection • Chemical & Petrochemical
• Welding • Pulp & Paper
• ACC Construction • Mines & Metals
• Structural Steel Erection
• Field Erected Tanks
Strategically Located Offices
1 Owensboro, KY Headquarters
Titan Contracting
Titan Fabricators
Milco National Constructors,
Eastern Operations
2 Long Beach, CA
Milco National Constructors,
Western Operations 1
2
3 Alpharetta, GA 7 3
Inco Services
6 4
4 Savannah, GA 5
Inco Services
5 Houston, TX
Titan Contracting GrayWolf Offices
Projects Performed*
6 Mobile, AL
Inco Services *We perform work in 49 states
7 Phoenix, AZ
Future Titan Contracting
Office
Air Cooled Condenser Construction| Bridgeport Harbor 5 | Coeymans, NY and Bridgeport,
CT
Milco National Constructors completed the offsite modularization of a 20 cell ACC in New York and is
currently assembling the modules in Bridgeport.
Air Cooled Condenser Construction| Keys Energy Center| Brandywine, MD
Milco National Constructors is installing 44,000 LF of pipe and erecting a Vogt HRSG.
Generation Facility| Mirant Power| Zeeland, MI
Milco National performed complete mechanical installation of 500MW generation facility, including two
GE 7FA combustion turbines, D11 steam turbine equipment, HRSG equipment, and BOP process and
power piping and equipment.
Steam Piping| Mankato Energy Center| Mankato, MN
Milco National installed high pressure steam & BOP piping – HRSG & steam turbine equipment for
complete 1-on-1 combined cycle power system.
Combustion Turbines| Renaissance Power Station| Carson City, MI
Milco National performed turnkey installation of four Siemens 501F combustion turbines, simple cycle, in
a power plant.
Structural Steel Fabrication and Erection Multi-market focus
• 8 fabrication shops in the US with • Arenas and Stadiums
1.47M sq ft under roof
• Hotels and Casinos
• 318,000 tons of annual fabrication
• Convention Centers
capacity
• Hospitals and Healthcare
• Industrial Customers
ENR Magazine’s #1 Steel Erector in the US
• Power
• Oil & Gas
Project Services
• Mining
• Connection Design, Design Assist,
Preconstruction Planning • Power
• Gulf Coast,
Texas
• 4-year program
• 60,000 + tons
Dugald River Zinc Project | Queensland, Australia Townsville Zinc Refinery Project | Queensland, Australia Mount Keith Project | Western Australia
$2M SAVINGS
Optimization of tower cranes from 8
to 5 for duration of construction
Equipment Replacement / Maintenance
Safety in Design
“do it in the
model before
you do it in
real life”
LASED | Virtual Assemblies
Visualizer
Animation
Animation | Accelerated Impacts
Maintenance & Predictive Analytics
Maintenance & Predictive Analytics
PDC | Mineral Sands Projects
Beenup Titanium Minerals Project | Augusta, Western Australind and Kemerton Chemical Plant | Bunbury,
Twin Pines Mineral Separation Plant | New Jersey, USA
Australia Western Australia
Client: Twin Pines Minerals Client: BHP Minerals Client: Cristal (formerly SCM Chemicals)
Project Narrative
The BHPBIO Yandi OHP1 site team
required a 3D Asset Management
platform that could provide an
accurate ‘As Built’ hub and
powerful visualisation platform for
the site engineering and
maintenance teams. Due to the age
of the initial engineering and
detailing, there were no models
available. Many of the 2D
deliverables were not at an ‘As
Built’ status.
Results
Prior to the 3D model completion and implementation; • Out of date design information used for maintenance works
resulted in significant time delays and cost overruns. Access to
• A survey site team would spend up to one (1) hour locating
the As Built detail drawings mitigated this risk saving both
relevant and correct engineering information. After the
implementation of the intelligent 3D platform, this was reduced schedule time and re-work cost.
to five (5) minutes. • Rotable and replaceable spares (pipe spools, mechanical
equipment) can now be accurately fabricated off the 2D detailed
drawings.
Closing
Questions or Comments?
Contact:
Patrick Phister
Vice President
Milco National Constructors, Inc.
270-926-2534
pphister@milconational.com