Professional Documents
Culture Documents
ON
AER TERVER
(17/42267/UE)
UNDERTAKEN AT
NOVERMBER 2021
INTRODUCTION TO THE COMPANY
Oracle Business Limited started formerly as Hartom in 2001 with
its founder Dr. S.I. Ortom as the CEO. Dr. S. I. Ortom raised the
organization through which he would use to reduce the level of
unemployment and poverty in the society.
Oracle Business Limited started formerly as Hartom in 2001 with
its founder Dr. S.I. Ortom as the CEO. Dr. S. I. Ortom raised the
organization through which he would use to reduce the level of
unemployment and poverty in the society.
The organization is one of the leading private establishments in
middle belt with over 1000 permanent staff, apprentices and
students on industrial training who are fully committed to the
company’s vision.
Figure 1: Shows company’s organogram
Figure 2: A group photograph of Oracle Feed mill Engineers.
UNIT OPERATIONS IN THE FEED MILL
In feed mill production have the following unit
operation:
a) Material and energy conservation
b) Heat transfer theory
c) Fluid flow
d) Size reduction
e) Mixing
f) Mechanical separation
Boiler Maintenance
Inspecting and cleaning fireside surfaces and clear all
manhole gaskets for leaks.
Inspect and test all system valves and test all safety valves.
Recalibrating all operating controls and Overhaul feed water
pumps.
Cleaning and inspecting chimneys.
Checking oil circulation temperature at sidearm pre-heaters.
Inlet temperature should be 110° F to 120° F, and outlet
temperature should be 140° F to 150° F for No. 6 oil (daily).
Checking oil pressure reading at the burners and Clean oil
filters at least twice a week:
Flush drain low water cut-offs/sidearm oil pre-heater (twice
a week).
Conduct boiler bottom blow down to clear sludge and
sediment, control high water, and control chemical
treatment concentrations (monthly or as needed).
Monitor smoke alarm on a weekly basis:
Maintain a rigorous boiler chemical feed water treatment
program.
Check combustion, inspect burner controls, and inspect
burner operation.
Conduct trap inspection program with replacement of trap
elements in apartment units and steam traps within the
cellar.
Conduct pipe inspection program to ensure all pipes are
pitched in the direction of steam source (one-pipe steam
systems) or condensate drainage (two-pipe systems).
PELLET MILL MAINTENANCE
The bearings, die and rollers are parts which have to be checked regularly .
Team work.
Responsibility.