Identifying the problems in

contracting for R&D


Bacellar, André Melo;
Superintendence for Research and Development (R&D) and Energy Efficiency (EE) – SPE
Brazilian Electricity Regulatory Agency – ANEEL

Medeiros, Janann Joslin


University of Brasilia

1
Outline

1. Problem

2. Context

3. Method applied

4. Results

5. Conclusion

2
1. Problem

-The issue (contracting for R&D) is relevant (Sutton,


2015). Specially if the company don´t have research
capabilities.

- There are few studies that address R&D contracting


(Sutton, 2015; Kloyer; Scholderer, 2012; Panico, 2011;
Okamuro, 2007; Sampson, 2004).

- Concepts are not sufficiently developed for testing


possible explanations for success or failure in the
contracting process.

3
1. Objective

The main objective of the study, then, was to help to fill


this knowledge gap by identifying the constraints that
interfere with effectively contracting R&D projects and
how they influence this process.

5
2. Context
Brazilian Electricity Regulatory Agency – ANEEL
carries out the Brazilian R&D Programme for the electrical energy sector.

Mission: Regulation, mediation and fiscalization in the electrical sector

Generation Transmission Distribution Comercialization

6
2. Context

-Companies operating in Brazil are legally required to


invest a percentage of the charges billed to customers
in research projects, which is usually done by
contracting research institutions, as the companies
themselves do not have research capabilities.

- But there are projects of relevance to the sector that


were slow to contract

to get off the ground or contracts for them were not


even closed.

-Meanwhile, about US$500 million remain uninvested 7


3. Compram Method applied

-Complex Problem Handling Method (Compram) can


-The C
be considered a participative problem structuring a partic
methods. Two groups: neutral experts (persons not two gro
involve
personally involved in the problem of interest) and, on
named
the other, involved, named stakeholders.
- The m
- The method starts with Understanding the problem, Unders
forms o
involves Selection of the forms of intervention and ending
change to be undertaken, and ends with the Evaluation
- Resu
of results.
problem

- Results reported in the paper focus on the phase of


problem understanding.
9
3. Compram Method applied

10
3. Compram Method applied

A list of questions and knowledge domains related to


those questions were drawn up for use in guiding the
meetings.

Principal question: How to get better results from the


ANEEL R&D Program?
Code Question
P1 How to deal with the risk of disallowance of investments made by utility companies?
P2 How to put research on the strategic agenda of utility companies and how to foster the R&D
culture in utilities?
P3 How to increase the application of research results?
P4 How and when to evaluate R&D? How to evaluate results?
P5 How to reduce red tape and give consistency to regulations in order to obtain better results?

P6 How to implement public-private partnerships for project execution?


P7 How to establish a permanent channel of interaction for the actors of the RD&I community
(especially universities and companies)
P8 How to deal with the research risk of failure?

11
4. Results

The concepts directly associated with contracting research projects are:


MELHOR: A numbers of concepts directly associated with contracting
research projects identified during the Understanding the Problem
phase

• Four concepts, which result from Question 3 – "The application of research


results", are related to property rights.

• Three concepts derived from Question 6 - “Public – Private Partnership” -


refer to equipment purchased or generated by the research project.

• Concept 5.1, arising from Question 5 - “Regulatory Coherence” - is also


related to project equipment.

12
4. Results

• Other concepts considered relevant to contracting are


the following: Concepts 1.1 Risk, 1.2 Research, 1.5
Accounting planning and 1.7 Evaluation criteria and
Concept 4.1 Risk perception.

• The eight concepts previously mentioned, together with


these five concepts make up 34,2% of all concepts
identified in the discussions, underlining the importance
of the contracting issue in the context of the Brazilian
R&D program studied.

13
4. Results
• The next step was to investigate the relationship
between the concepts
CONCEITO X CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP CP >
influênci
1 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 2 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 3 3.1 3.2 3.3 3.4
a
CP1 2 2 1 1 2 1 1 1 1 1 1 1 1 16
CP1.1 2- 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 21
CP1.2 1 1- 1 1 1 2 2 1 2 1 1 2 1 1 1 1 1 1 2 1 2 1 28
CP1.3 1 1- 1 1 1 1 1 1 1 1 1 11
CP1.4 2 2 1 - 1 1 1 1 1 1 1 2 1 2 1 2 1 2 2 1 26
CP1.5 1 1 - 1 1 1 1 6
CP1.6 1 1 1 - 1 1 1 1 1 1 1 1 11
CP1.7 2 2 2 1 1 1- 1 1 1 1 1 1 15
CP1.8 1 1 1 1- 1 1 1 1 1 1 10
CP1.9 2 - 1 1 1 1 1 1 8
CP2 1- 1 1 1 1 5
CP2.1 1 1 1- 1 1 1 1 1 8
CP2.2 1 1 1 2- 1 1 1 1 1 1 1 12
CP2.3 1 - 1 1 1 1 1 6
CP2.4 1 1 1 1 - 1 1 1 1 1 9
CP2.5 - 0
CP2.6 1 2 1 1 1 1 - 2 1 2 1 1 1 15
CP2.7 1 1 1 1 1 1 1 1 1- 1 1 1 1 1 14
CP2.8 1 2 1 1 1 - 2 2 10
CP2.9 1 1 1 1 1 1 1 1- 1 1 1 1 12
CP2.10 1 1 1 1 - 4
CP3 1 1 1 2 1 1 1 2 1 1 1 1 - 1 1 1 17
CP3.1 1 1 1 1 1 1 1 1 1 1- 1 11
CP3.2 1 1 1 1 1 1 1 1 1 1 1 1 2 1- 15
CP3.3 1 1 1 1 1 1 1 1 1 1- 1 11
CP3.4 1 1 1 1 1 1 1 1- 8
CP3.5 1 1 1 1 4
CP3.6 1 1 1 1 1 1 1 1 8
CP3.7 1 1 1 1 1 1 1 1 2 1 11
CP4 2 2 1 2 2 1 2 1 1 14
CP4.1 1 2 1 1 1 1 1 1 1 1 1 12
CP4.2 1 2 1 1 1 1 1 1 1 1 1 12
14
4. Results

15
4. Results

• Industrial property should not be a stumbling block for contracting research


projects.

– This concern on the part of the institutions involved in the contracting


process of the Brazilian R&D Program seems to indicate a lack of
knowledge with respect to the real value of intellectual property to the
firm.
• In Fischer and Henkel (2013) study, intellectual property was found to be the
least effective tool for value appropriation among the seven surveyed, a
finding consistent with Okamuro's (2007) observation that more companies
achieve commercial success from R&D projects than technological success
measured by the number of patent applications.
– Because these companies lack research capabilities. Previous studies
have pointed out that internal R&D capacity is necessary to absorb
(Cassiman; Veugelers, 2006) and appropriate value (Fey; Birkinshaw,
2005) from external knowledge and that being developed.

16
4. Results

• Our research, in a contribution to the literature on contracting for


R&D, uncovers additional issues that can cause delay or even
render the contract impracticable.

• Issues related to industrial property and equipment are seen, from


study data, to be related to conflicting legislation and to the lack of
an adequate management structure for R&D.

• The analysis carried out revealed that Concept 1.4 (Utility Company
R&D Management Structure) is the factor having the greatest
impact on contracting and able, by itself, to cause delay in the
contracting process.

18
5. Conclusions

• This paper provides a cause and effect framework for


understanding the constraints experienced in the
contracting process of R&D projects.

• The second most cited group of constraints to the R&D


Programme studied were those related to procurement,
specifically those concerning industrial property,
purchase and ownership of equipment. In fact, 34% of
the identified concepts are related to procurement.

• The importance of an adequate management structure


has not been reported previously in the literature and is
also a contribution.

19
5. Conclusions

• It would be relevant to address, in future research, the


proposal of solutions to the constraints identified and
testing the viability of these solutions.

20
Thanks

Contact information:

• Tel.: 55 61 2192-8568

• ambacellar@yahoo.com.br