At the end of this chapter, you should be able to:


Define work measurement
Identify the importance of work measurement
Understand the methods in measuring work
standard
Explain allowances and the types of allowances
Analyze work measurement

Operations Management All Rights Reserved


© Oxford Fajar Sdn. Bhd. (008974-T), 2016 9– 3
OVERVIEW OF
WORK MEASUREMENT

 Work measurement
• Involves the estimation of the amount of human
effort needed to produce a unit of a specified
output from an operation
 Work standard
• The amount of time that is taken by a well-trained
worker, operating under normal working
conditions, to produce one unit of a specified
output from an operation.

Operations Management All Rights Reserved


© Oxford Fajar Sdn. Bhd. (008974-T), 2016 9– 4
IMPORTANCE OF
WORK MEASUREMENT

Benefits of work measurement:


Manpower planning
Production planning and scheduling
Estimating productions costs
Basis for incentives
Training of employees

Operations Management All Rights Reserved


© Oxford Fajar Sdn. Bhd. (008974-T), 2016 9– 5
METHODS IN MEASURING
WORK STANDARD

Some of the methods include:


1.Historical Experience
2.Predetermined Time and Motion Studies
3.Work Sampling
4.Time Study
a)Observed time
b)Basic (normal) time
c)Standard time

Operations Management All Rights Reserved


© Oxford Fajar Sdn. Bhd. (008974-T), 2016 9– 6
ALLOWANCES AND
TYPES OF ALLOWANCES

Allowances
Break times (extra time) given to employees to
attend to personal needs, such as a lunch break or
tea/coffee break, etc., with the purpose of
overcoming tiredness or fatigue.

Operations Management All Rights Reserved


© Oxford Fajar Sdn. Bhd. (008974-T), 2016 9– 7
ALLOWANCES AND
TYPES OF ALLOWANCES
(cont.)

Types of allowances:
Relaxation allowance
Contingency allowance
Process allowance
Policy allowance

Operations Management All Rights Reserved


© Oxford Fajar Sdn. Bhd. (008974-T), 2016 9– 8
WORK MEASUREMENT
ANALYSIS

The two most common methods used in


measuring work standard are:
Work Sampling Method
Time Study Method

Operations Management All Rights Reserved


© Oxford Fajar Sdn. Bhd. (008974-T), 2016 9– 9
WORK MEASUREMENT
ANALYSIS (cont.)
Work Sampling Method
Under this method, the manager must first determine the
number of observations that is needed. The following formula is
applied.

Operations Management All Rights Reserved


© Oxford Fajar Sdn. Bhd. (008974-T), 2016 9– 10
WORK MEASUREMENT
ANALYSIS (cont.)

Operations Management All Rights Reserved


© Oxford Fajar Sdn. Bhd. (008974-T), 2016 9– 11
WORK MEASUREMENT
ANALYSIS (cont.)

Time study method

Operations Management All Rights Reserved


© Oxford Fajar Sdn. Bhd. (008974-T), 2016 9– 12
WORK MEASUREMENT
ANALYSIS (cont.)

Operations Management All Rights Reserved


© Oxford Fajar Sdn. Bhd. (008974-T), 2016 9– 13
WORK MEASUREMENT
ANALYSIS (cont.)

Operations Management All Rights Reserved


© Oxford Fajar Sdn. Bhd. (008974-T), 2016 9– 14
WORK MEASUREMENT
ANALYSIS (cont.)

Operations Management All Rights Reserved


© Oxford Fajar Sdn. Bhd. (008974-T), 2016 9– 15
WORK MEASUREMENT
ANALYSIS (cont.)

Operations Management All Rights Reserved


© Oxford Fajar Sdn. Bhd. (008974-T), 2016 9– 16
WORK MEASUREMENT
ANALYSIS (cont.)

Operations Management All Rights Reserved


© Oxford Fajar Sdn. Bhd. (008974-T), 2016 9– 17
WORK MEASUREMENT
ANALYSIS (cont.)

Operations Management All Rights Reserved


© Oxford Fajar Sdn. Bhd. (008974-T), 2016 9– 18
WORK MEASUREMENT
ANALYSIS (cont.)

Operations Management All Rights Reserved


© Oxford Fajar Sdn. Bhd. (008974-T), 2016 9– 19

You might also like