COOLING WATER SYSTEM

DEVELOPMENT

IN UTILITY
Cooling Tower Specification:
• Number of systems : 2
• Capacity : 150 m3 / hr each (circulating water)
• Type : Counter Current Flow Induced draft.
• Overall size of the tower L x B x H (m) : 2.94 x 2.94 x 4.075
Hot water circulation pump capacity:
180m3/hr
• Cooling water recirculation pump capacity for process plant
• 90 m3/hr each (2W +1S) = 180 m3 /hr
• Cooling water requirement for process plant = 140 m3/hr

• Cooling water recirculation pump capacity for compressors


• 90 m3/hr each (1W +1S) = 90 m3/hr
• Cooling water requirement for compressors = 72 m3/hr
Operation difficulties
• No stand-by
• Risky operation
• Plant shutdown (1 day ) is required for Preventive maintenance
• Pump & Motor PM Maintenance Not possible
• Electrical panel maintenance Not possible
• Power consumption more
C/W SUPPLY TO COMPRESSOR C/W SUPPLY TO OPF/SPF

C/W RETUEN FROM SPF


C/W RETUEN FROM COMPRESSOR

EXISTING COOLING TOWER

COLD WELL COLD WELL


COLD WELL
PROPOSED COOLING TOWER
CT HOT WELL
C/W RETURN FROM OPF

C/W MAKE UP LINE


C/W SUPPLY TO COMPRESSOR C/W SUPPLY TO OPF/SPF

C/W RETUEN FROM SPF


C/W RETUEN FROM COMPRESSOR

EXISTING COOLING TOWER

COLD WELL COLD WELL


COLD WELL

CT HOT WELL
C/W RETURN FROM OPF
PROPOSED COOLING TOWER

C/W MAKE UP LINE


Advantages
• Single mode of operation ( No hot well collection sump)
• Hot well pump NOT required
• Operation free, pump flood suction
• Pump primming NOT required
• Cooling water temperature can be regulated
• Better COC can be maintain
• Emergency power (Class – III) NOT required
• Plant shut down is NOT required for PM
• Planning for Preventive maintenance
• Pump & Motor PM Maintenance easy
• Power saving
• Can be used augmentation
Power saving
Estimate
• New cooling tower = 3,00,000/-
• Civil work = 2,50,000/-
• Other miscellaneous work = 1,00,000/-
• Total = 6,50,000/-