运行 sap 操作流程

SAP Operation for notification


登录界面
login in
• The two way to login in

1.Select “SH 2.Double click“SH


ECC”click“ 登录 ECC”for login in
”for login
输入账号密码
enter account and password

• 切记不要连续输错三次账号密码,否则将锁定账号,目前解锁账号流程非常复杂。语言
暂时只能选择中文版本。
• Remember that password can not be wrong in 3 times , if not the account will be locked. If
enter wrong password 2 times , exit login in page , open login page again.

User id

Password
第一次登录需要更改密码,与原始密码不同且需 6 位以上数字(数字不能重复)
in the first time for login in , the password needs to be changed , and password should
be different and should be more than 6 numbers ( the numbers can not be the same )

New
password

Repeat
password
• 首次登录会出现该界面,点击菜单选择 sap 菜单则变成我们常用界面 .

click“ 菜单”
Select “SAP
菜单

选择电力板块→国华电力→运行管理(检修管理)
select“ 电力板块” → select“ 国华电力” → select“ 运行管理” ( select 检修管理)

运行管理
operation
management

检修管理
maintenance
management
可将运行常用项目如:运行日志、日志查询、缺陷登记、缺
陷查询、工作票查询。
运行日志 shift log
for writing down the
daily events

日志查询 display shift log

缺陷登记 record
notification

缺陷查询 display
shift log
notification

工作票查询 display work


orders
可将常用操作项目添加至收藏夹
we can add daily operation item to favorite
• 方法:选择子项目如(运行日志),右键选择添加到收藏夹。
• Method : take “ 运行日志” for example , right click , select“ 添加到收藏
夹”
登记缺陷方法
the method for recording fault notification

• 选择双击子菜单:登记缺陷,则转化至建立 PM 通知画面。

Double click
“ 缺陷登记”
通知类型填写 D0, 然后点击执行。
Open command
field

save EXIT
BACK
execute
cancel

2.Click
execute

1 : input“D0

缺陷通知单必填内容:缺陷描述、 kks 编码、缺陷类型。 Kks 编码对照 kks 编码表手动输入。
The following content should be in the notification : description of notification , KKS code , the type of
notification. Input KKS code according to the sheet of KKS code.

Description of notification

KKS
code

Rep.by , it can be
changed

The type of
notification

The type of
leakage

The time that the notification should be


handled
全部填写完成后点击保存键则出现以下画面, after the
notification content has been recorded , click “save” , the
following page will appear.
5.Click
“execute”

• 填写通知类型和通知单号点击执行键返回缺陷通知单。缺陷填写结束。

2.Record the
code 3.Input“
do”

800022749
1.Double
click here

4.Input the code


缺陷验收:就地确认该缺陷已经消除后可以验收缺陷。
Notification acceptance : confirm that the notification has been  eliminated and the
equipment is normal in local. We can accept the notification.

Click it for
notification
acceptance
How to permit a work order
• 双击子菜单:工作票查询,则转化至查询工作票画面
• Double click“ 工作票查询” to the page of display work order.

Double click“ 工
作票查询”
选择需要查询对象后点击执行图标。
Select the items for displaying , and click “execute”

拟票: the ticket


baru dibuat
待签发: belum di
izin oleh engineer
已签发: sudah di
izin oleh engineer
已批准: sudah di
izin oleh supervisor
已许可: sudah di
permitted oleh
operator
押票中: suspend/
return
Usually the state of
the work order has
been changed
to“ 已签发”, we
can permit it
Click “execute”
选择需要办理的工作票,双击工作票编号,转化至工作票修改画面。
Select the order that need to be permitted , double click the work order code to the work order
page.

double click the work


order ( should click in
the red area )
接票人接票后通知值长审批 ( 接票后需关闭该工作票, sap 系统若两个账号同时打开一张工作票则该工作
票无法转化状态)
after accepted the W.O , inform supervisor for permission. ( after accepted W.O , operator should close the
W.O page. because the state of W.O cannot be changed , if two account are editing in the same page in SAP
system )

Click “ 接
票” to accept
the W.O
值长审批工作票隔离措施,并审批工作时间(注意 SAP 系统使用的是北京时间,需要与印尼时间对应上)。
Now the supervisor check the safety measure right or not because of not English in the system.
we need to pay attention to time of the maintenance. ( the time of SAP system use time of Beijing, when we write
down the time of Indonesia , we need to add one hours. For example the time of Indonesia is 2018-2-7
10:55:23 , we write down the time should be 2018-2-7 11:55:23 )

Check
safety
measure

Check the time


Scheduled Scheduled end
of work start
值长批准工作票后通知许可人打印工作票,打印一式两份。注意 sap 无需选择工作票类型,
检修开票时已确定类型。
After the supervisor approved the W.O , operator print W.O two copy. It is not need to select
the type of W.O when printing , because the type has been selected when the W.O was created.

The type of W.O

The state of W.O 50“ 已


批准”, which is has
been approved by
supervisor

Click“ 打印工作

”to print W.O
The state of W.O and risk control order
• 10 拟票 the W.O baru dibuat
• 20 待签发 W.O belum di izin oleh engineer
• 30 已签发 W.O sudah di izin oleh engineer
• 40 已接票 W.O has been accepted
• 50 已批准 W.O sudah di izin oleh supervisor
• 60 已许可 W.O sudah di permitted oleh operator
• 70 已押票 W.O suspend/return
• 80 已终结 end/ close W.O
• 90 作废 cancel W.O
许可人打印风险预控票一式两份
operator print risk control order two copy.
风险预控票: risk control order

Double click“ 风险预控票”


to the page of risk control
order
许可人打印风险预控票一式两份
operator print risk control order two copy.
Click“ 打印风险票
”to print risk control 1.Confirm the
order W.O state 50

2. Confirm risk
control order
state 30
The paper of W.O

The stateof W.O


is “ 已批准 W.O
sudah di izin oleh
supervisor

The paper of risk control order

The stateof W.O


is “ 已签发 W.O
sudah di izin
oleh engineer”
值班员去就地执行完成隔离措施后许可工作票 .
When the safety measures have been done , the system has been isolated , operator permit
W.O.

6.Click the
flag“ 许可开
工” to permit
W.O

1.If the measure has been


done , click the button

2.If it is necessary for safety , we


can add measure in here , if not ,
fill with“none” , can not be blank.
3.Check the time , for
example the time of
Indonesia is 2018-2-7 4.Click the flag , input
10:55:23 , we write the password of the
down the time 2018-2- 5.Click the flag , input work responsible person
7 11:55:23 the password of the
work permit person
the W.O that can be permitted
After permitted , the state of W.O change to 60
The paper of W.O has been approved (已批准) 。
and the risk control order has been issued (已签发), we can not change it to approved.
End W.O
4.Click the
flag“ 工作终
结” to end
W.O

1.Check the end


time , for example
the time of Indonesia
is 2018-2-7
10:55:23 , we write
down the time 2018-2- 2.Click the flag , input
7 11:55:23 the password of the
3.Click the flag , input work responsible person
the password of the
work permit person
80 已终结 end/ close W.O
终结纸质工作票并于工作票和风险票右上角盖已执行章

Grounding line
numbers and how
many sets of
grounding line

End time

Signature of
permitted
Signature of person
responsible
person
PS