Professional Documents
Culture Documents
SAFETY TALK
----------------------------------------------------------------
-----Not following SOP (Standard Operating
Procedure) for lining up of VBU FEED Tank
Causing Starvation of FEED PUMP-78-P-31D
----------------------------------------------------------------
--
An incident of a Petroleum Refinery
A.K. Singh
Hydrocarbon Safety Professional
Safety Talk
PSV routed to
Suction
Motor
Screw Pump
4 Seal
4 Bearing
Timing Gear
Safety Talk
• During normal operation the Screw Pump 78P31D carrying viscous
fluid at 120°C, and discharge pressure around 12Kg/cm2 and initial
observation as usual( seal and bearing failure).
• Within 2-3 months, again same problem pop up which leads to failure
of Pump Seal and bearing.
• There was poor Co-ordination between VBU unit & OMS (Established
with DDCS flow of FEED, and Tank Change over and low Tank temp. )
Unit to observe trend of FEED flow during tank change over and its temperature
and log the data in both log book of O&MS and unit.
SOP to be follow while changing the tank and running the pump.
--------------------------------------------------------------------------------------------------------------
LEARNING FROM MISTAKES IS ONE WAY TO AVOID FUTURE
INCIDENTS