The correct pump and pipe selection go hand in hand for successful dewatering
operation.
What pipe do I select in order to achieve optimum performance from the pump?
What are the main factors that must be considered when selecting the best system?
Argyle Diamonds
2
Weir Minerals Multiflo Mine
Dewatering
Solutions
Pipe Selection
Pipe Selection
The answer is EASY…
..with the right information from the Mine Plan and Mine Planning Department.
A: Static Head is the distance from the Mine pit floor to the top of the mine pit including the
highest RL that the discharge pipeline will have to go over.
So the Mine Pit might look like this from a side profile.
4
Weir Minerals Multiflo Mine
Dewatering
Solutions
Pipe Selection
STATIC HEAD
Pit Floor
KPC - HATARI
5
Weir Minerals Multiflo Mine
Dewatering
Solutions
Pipe Selection
2. How much discharge flow rate must be achieved?
This depends:
On how much water is in the pit at the time
How much rainfall is expected at the time of the year.
But mostly the answer is, as much as possible, as fast as possible.
6
Weir Minerals Multiflo Mine
Dewatering
Solutions
Pipe Selection.
3.What is the length of the discharge pipeline from the pump unit to the
discharge point?
Do not measure a straight line from the pump to the discharge point.
If the pipeline is to follow the haul road out of the pit, from the pump to the discharge
point, simply measure the haul road plus any additional length necessary to reach the
discharge point.
7
Weir Minerals Multiflo Mine
Dewatering
Solutions
Pipe Selection.
4. Selecting the correct pipe diameter.
Selecting the correct diameter pipe depends on the discharge flow
capability of the pump unit at the head duty required.
For Example: at the best performance point of a Model 400, the head
would be approximately 110m and the flow rate may be between 240
and 260 liters per second.
240 liters per second is a very large quantity of water to flow through a
pipe every second. So we must assume that a large diameter pipe
would be required. When selecting pipe, HDPE ( high density
polyethylene) pipe is the most common on the market and is measured
at the outside diameter or OD.
The length of pipe will also affect the selection of pipe diameter.
8
Weir Minerals Multiflo Mine
Dewatering
Solutions
Pipe Selection
Applying the information using a typical
example.
What is the STATIC HEAD of the location in the mine pit? 80m
How much DISCHARGE FLOW rate must be achieved? As much as
possible.
What is the length of the discharge pipeline from the pump unit to
the discharge point? From pump to discharge pipe we would need to
use 800 m of pipe.
Selecting the correct pipe diameter.
Please recommend the optimum pipe so that we get the best
performance from the pump.
9
Weir Minerals Multiflo Mine
Dewatering
Solutions
Pipe Selection
10
Weir Minerals Multiflo Mine
Dewatering
Solutions
Pump Selection
SELECTING THE CORRECT PUMP
What is the STATIC HEAD of the location in the mine pit? 80m
So now look for a curve that will perform above 80m.
The model 385, 390, 400 and 420 are capable of this performance.
11
Weir Minerals Multiflo Mine
Dewatering
Solutions
Pump Selection
12
Weir Minerals Multiflo Mine
Dewatering
Solutions
SELECTING THE CORRECT
DISCHARGE PIPE
What is the length of the discharge pipeline from the pump unit
to the discharge point? From pump to discharge pipe we would need
to use 800 m
A large Pipe diameter is required
13
Weir Minerals Multiflo Mine
Dewatering
Solutions
SELECTING THE CORRECT
DISCHARGE PIPE
The 400 has a shut of head of 150 meters, therefore the pump is capable of attaining a
high of 1500 kPA. When selecting a pipe from PN refers to pressure rating and PN 16
would be suitable in this application. PE relates to the density of the material used in the
manufacture of the pipe. Example PE 80, PE 100.
14
Weir Minerals Multiflo Mine
Dewatering
SELECTING THE CORRECT Solutions
DISCHARGE PIPE
We have determined that the pressure rating required is PN16 and PE100.
PE 100 density pipe is the more commonly manufacture pipe.
Weir Minerals Multiflo uses the Australian Pump Manufacturers Handbook for
calculation and /or figures compiled by Vinidex pipe manufacturers.
Information obtained from these figures is plotted onto the pump performances
curve in order to determine Total Dynamic Head and /or Friction head. The
curve produced from the plotted information allows us to see which pipe is
best suited to the duty required and permits the pump to operate at its best.
15
Weir Minerals Multiflo Mine
Dewatering
DISCHARGE PIPE
Water
16
Weir Minerals Multiflo Mine
Dewatering
SELECTING THE CORRECT Solutions
DISCHARGE PIPE
17
Weir Minerals Multiflo Mine
Dewatering
DISCHARGE PIPE
18
Weir Minerals Multiflo Mine
Dewatering
I have also added in the plot curve for 355mm pipe to compare the increased
performance by increase pipe diameter.
19
Weir Minerals Multiflo Mine
Dewatering
Solutions
20
Weir Minerals Multiflo Mine
Dewatering
Solutions
Increase of 32 l/sec.
21
Weir Minerals Multiflo Mine
Dewatering
Solutions
SUMMARY: SELECTING THE CORRECT
DISCHARGE PIPE
From these four points and the use of the pipe friction figures:
STATIC HEAD of the mine?
DISCHARGE FLOW rate required?
Length of the discharge pipeline from the pump unit to the discharge
point?
Pipe diameter.
DISCHARGE PIPE
23
Weir Minerals Multiflo Mine
Dewatering
Solutions
24
Weir Minerals Multiflo Mine
Dewatering
Solutions
25
Weir Minerals Multiflo Mine
Dewatering
Solutions
26