You are on page 1of 13

ERECTION STEEL

PT JAYA ABADI KONSTRUKSINDO METHOD STRUCTURE MAIN GATE


OF STATEMENT & SECONDARY GATE
GENERAL SITE ARRANGEMENT
Equipment
20 ton mobile crane capacity for main framed and scafolding
during installation supporting panel conwood framed
CRANE CERTIFICATE
SIO (SURAT IJIN OPERATOR)
SURAT IJIN ALAT (SIA)
Erection of steel column and beams

1. Kolom material were arrange close to


the pedestal position.
2. Check Level, and ensure level nut with
position
3. Check at least 3 temporary anchor point
and ensure anchor point after erection for
stand alone column for self supporting
column ensure the column is vertical and
anchor properly
4. Check lifting weigth crane position
boom radius to comply with crane
manufacturing
Erection of steel column and beams – self supporting column
ensure stability and properly anchoring
1Beam assembly on the ground check bolt
tight on endplate during assembly on the
ground
2. Check lifting weigth crane position
boom radius to comply with crane
manufacturing
ERECTION

Maintain good housekeeping procedures and practices - Wear PPE correctly and correct
fitting clothing - Store materials, tools and equipment properly - Use correct manual
handling practices and techniques - Use correct materials handling procedures -
Supervisors to monitor and ensure compliance
Erection of steel column and beams - ensure verticality of steel columns when bolt
connections from beams to columns were tightened
Inspect area to be removed and look for items that may require supporting when other
sections are removed - Suitably prop any items that may be reliant of item that is not
connected - Use only qualified riggers to connect loads and direct loads - Stay well clear
of item when removing final connection - Never leave steel in an unsafe manner
ERECTION.
Inspect area where plant is to operate for stable ground conditions (No underground
services, soft spots, trenchers or excavations)
Ensure that the area is barricaded off, and all persons are aware of plant movement
Ensure that the appropriate P.P.E is worn in each piece of plant - Inspect area to
operate plant for crush points before moving, ensure that anyone working in that
area is aware of your movement
Use spotter in confined areas to negate being hit or crushed
Do not allow anyone to work or operate below you when working above, ensure
that signage and barricades are around area before commencing
Ensure that plant has been inspected before commencing works

You might also like