Follow-up Piston
+100%
-100%
What is Droop?
% of frequency change ( % of RPM change)
will lead to full travel of Governing valves or
full load change.
5% droop means: 5%*50 Hz= 2.5 Hz
Will change 500MW. In terms of output total
change should take place is 100%
TURBINE DROOP 5% & NO DEAD BAND
3000
2700 2850 RPM 3150 3300
+100%
-100%
2790
+100%
0%
2940 3060
-100%
3210
1) Speed Controller
• Speed Controller is used to increase turbine speed
from barring speed to rated speed in a controlled
manner and to assist Auto synchronizer in
synchronizing the machine and taking the blocking
load. After synchronization speed controller can be
used for taking load up to 100% but as a normal
practice approx. 10% of load should be taken and
then load controller should be taken into service. It is
done because during speed controller mode a small
frequency change will cause corresponding opening
in valve opening ( hence in load)
Speed controller can be divided into sub section:
Speed set point,
Speed set point control, Dn/Dt monitoring,
Speed control Loop, No load correction.
Speed Control
Loop
EH-CONV
Press Control
Loop
4
CONTROL TRANSFER LOGIC & ADMISSION CONT
ACTUALPR –SET
THROTTLE PR.
MIN
SUMMER
PI CONTR
COLLINS
10 KSC EHC
PI
MIN CONT. CONV
INITIAL PR. MODE
LOAD CONT
MAX MIN
SPEED CONT
100% -0-+100%
PI EHC
controller HP sec. oil
Plunger
Admission Coil
controller IP sec oil
AND
PLUNGER COIL
EHC>
ON/OFF PB
100%
Electro-Hydraulic Controller (EHC)
2
Trim -Device
• To limit rise in H.P.exhaust hood
temperature in case of load drop below 20%
coupled with rise in CRH pressure.
• To facilitate Turbine operation with OR
without HP-LP bypass.
• This is achieved by adjusting relative
opening of IPCV with respect To HPCV
LOAD SHEDDING RELAY
• LOAD shedding relay is used to support the function of
the turbine governor. A quick correction value input to
the hydraulic governor output & secondary oil pr. of
IPCV min speed building
• When acceleration time constant is very small or when
governor under load or pressure control.
• Sudden negative jump in load is detected electrically
instantaneously by the load shedding relay
• 200MW: Load throw off>40% & residual load<15% &
frequency>49 Hz
• 500 MW: Load throw off>50% & residual load<30% &
frequency>49 Hz in a response time of 100mili seconds.
Full load through off <6% the total interrogation time