You are on page 1of 31

GEOMATICS

ENGINEERING
Aug 19, 2020
CLASS 3

UNIT - II GATE

PREPARATION:2021

Malarmathi divinya
DISTANCE AND ANGLE
MEASUREMENTS
★ Distance measurement
★ Angle measurement
LINEAR MEASUREMENT
Direct measurements

Optic means

Electromagnetic
method
DIRECT MEASUREMENT
Distance between the two points are measured using any
instruments directly on the ground.
1 Pacing Passometer, Pedometer

Measurement with
2 odometer Odometer, Speedometer

Measurement using chains


3
and tapes
INSTRUMENT USED IN CHAINING
➔ Chain ➔Cloth and linen tape
➔ Tape
➔ Arrows
➔ Pegs ➔Metallic tape
➔ Plumb bob
➔ Plasterer’s laths➔and whites
Steel tape
➔ Ranging Rod and Offset rod
➔Invar tape
INSTRUMENT USED IN CHAINING
➔ Cross staff
➔ Optic square
➔ Prism square
➔ Site square
RANGING ON FLAT SURFACE
Direct ranging
Indirect ranging
RANGING ON FLAT SURFACE
RANGING ON SLOPE
Indirect method
Direct method Difference inAngle
Hypotenusallevel measured
allowance
SETTING OUT OFFSET
SETTING OUT PARALLEL
GEOMATICS
ENGINEERING
Aug 22, 2020
CLASS 4

UNIT - II GATE

PREPARATION:2021

Malarmathi divinya
8903357284
malarmathi.siwec@gmail.com
SETTING OUT PARALLEL
OBSTACLES IN CHAINING
CHAIN SURVEYING
ERRORS IN CHAIN AND TAPE
● Erroneous length of chain or tape
● Bad ranging
● Careless holding and marking
● Bad straightening
● Non horizontality
● Sag in chain
● Variation in temperature
● Variation in pull
GEOMATICS
ENGINEERING
Aug 28, 2020
CLASS 5

UNIT - II GATE

PREPARATION:2021

Malarmathi divinya
8903357284
malarmathi.siwec@gmail.com
CORRECTION DUE TO SAG
CORRECTION ALIGNMENT
REDUCTION TO MEAN SEA LEVEL
NORMAL
TENSION
EMD
● Time measurement
● Phase measurement

You might also like