Housekeeping Monitoring Presentation by SM
Housekeeping Monitoring Presentation by SM
Elevator opening
railings with green net
35th Floor
Area 2
Rebar
35th Floor
Elevator
Debris, Phenolic
Board, Stair
installed with
scaffold railing, PVC
electrical pipe,
Scrap of rebar
34th Floor
Elevator
Debris, Welded
Tubular Frame
Scaffold (H-Frame),
Elevator Opening
Installed with Railing
and green net,
Phenolic Board
34th Floor Area 2
Debris, Welded Tubular Frame
Scaffold (H-Frame), Scaffold
pipe or Alum beam, B.I pipe
33rd Floor
Elevator
Debris, Elevator
Opening with
Caution tape, green
net
33rd Floor Area 2
Debris, Elevator
Opening Installed
with Railing and
green net,
Phenolic Board,
Alum Beam,
Scaffold Pipe
32st Floor
Area 2
B.I pipe, Welded
tubular frame (H
frame), Rebar dowel,
plywood or Easy set
31st Floor
Area2
Elevator opening
installed scaffold
railing with
green net, I -
beam , H frame ,
B.I pipe
31st Floor
Area 2
B.I Pipes, G.I
Pipes, Rebar
dowels , Rebar
31st Floor
Area 1
Debris, H frames, Stair
installed with scaffold
railings and green net,
Rebar dowels, I - beams
30th Floor
Area 1
A sack of debris?,
Stair installed
with railing and
green net, rebar
dowel, B.I pipe
30th Floor
Elevator
, Elevator opening
installed with
railings and green
net, Stair installed
with railing and
green net, Rebar
dowels
30th Floor
Area 2
Pile of white sand,
Phenolic board, a sack
of debris?, H farame
29th Floor
Area 2
Net, Elevator opening
and stair installed with
railing with green net
29th Floor
Area 2
Rebar dowels, B.I
pipes, Green net,
Containers
29th Floor
Area 1
Debris , Rebar Scarp,
Rebar dowel, PVC
pipes, B.I pipes, white
sand, Stair installed
with railing and green
net
28th Floor
Area 1
Debris, Oxygen tank,
stair installed with
railing and green net,
B.I pipe
28th Floor
Area 2
Debris, scaffold
pipes, pile of white
sand
28th Floor
Area 2
Debris, Oxygen tank, stair
installed with railing and
green net, elevator
opening installed with
railing
27th Floor
Elevator
elevator opening installed
with railing , worker
without PPE
27th Floor
Area 2
Debris, Scaffold
pipe, pile of sand,
workers with out
PPE, rebar
dowels
27th Floor
Area 1
Debris
26th Floor
Area 1
Debris, stairs with
railing and green net, h
frames
26th Floor
Elevator
Railing with green net,
scaffold
26th Floor
Area 2
Debris
25th Floor
Area 2
Debris, Easy set,
Shoring jack (outer
post), G.I pipes
25th Floor
Elevator
Elevator
opening and
stair installed
with railing
and green
net, Debris
25th Floor
Area 1
Debris
24th Floor
Area 1
Debris, stairs with
railings and green
net
24th Floor
Elevator
Debris,
elevator
opening with
railing and
green net
24th Floor
Area 2
v
Debris
23rd Floor
Area 2
Debris
23rd Floor
Elevator
Elevator
opening with
railing and
green net, H
frame,
Scaffold pipe
with green
net, pile of
white sand
23rd Floor
Area 1
Debris , stair with
rail guard system
22nd Floor
Area 1