Demand: 10,000 Unit

Monthly Capacity Standard time Monthly capacity Duration time


Operation
(hour/month) (hour/unit) (unit/month) (month)

1 15000 6 2500 4.0


2 10000 10 1000 10.0
3 21000 15 1400 7.1
4 10000 8 1250 8.0
5 18000 12 1500 6.7