Smartech LE Control Inc.,
Project Design
Confidential File
Smartech LE Control Inc.,
Overall Project Status and Report
Five Vision System were installed in the Filling Machines. They are
installed in:
1. Corazza 1
2. Corazza 3 Line 1
3. Corazza 3 Line 2
4. Corazza 4
5. Corazza 6
1. Corazza 1
a) Installed Camera Mounting, mounted on the
flooring.
(Readjusted the position due to blockage in panel
door. Final position is approved)
b) Installed Rejector, Bin, Alarm and Sensor Systems
(Readjusted the position with respect to Camera
and Mounting)
c) Configured EXISTING Siemens PLC. Tested and
Reprogrammed
d) Set the camera parameters on Actual Product ,
parameters are OK and based on the actual
packaging
e) Modified the rejector mechanism into new design
(push type instead of divert type)
f) Tested the actual run function with respect to
conveyor
Smartech LE Control Inc., 5
STATUS: COMPLETED AND OPERATIONAL ON
EDEN REGULAR PACKAGE 165G
Overall Project Status and Report
1. Corazza 4
a) Installed Camera Mounting, mounted on the wall.
b) Provided cover for lighting due to operator request.
c) Installed Rejector, Bin, Alarm and Sensor Systems
on the inclined conveyor
d) Configured EXISTING Siemens PLC. Tested and
Reprogrammed
e) Set the camera parameters on Actual Product ,
parameters are OK and based on the actual
packaging
f) Modified the rejector mechanism into new design
(push type instead of divert type)
g) Tested the actual run function with respect to
conveyor
- Vision System Training were conducted during the weekly meeting of each
Cluster. A presentation on operation and troubleshooting was included
during the training. Please check as attached.
13