Professional Documents
Culture Documents
Steps Befor - After Paving
Steps Befor - After Paving
1. Checking of: Motor Oil Level; Coolant Level; Oil Level PDO, Auto Greaser and Hydraulic Oil
3. Starting the engine and leave it run for at least 3 minutes in idle (NO functions on!)
4. Lowering the screed a few mm above the ground and turning on Screed Heating.
While heating up the screed for about 20 minutes add mountings like auger and Grade sensors.
5. Turn on Pre-heating function and let it run for 15 more minutes (still with screed heating on))
6. ´ Pre-heating function off; Engine RPM's to MAX and Tampers 100% in Manual Mode: running the Tampers
until maximum Speed is reached.
7. Setting the Paving Function on Automatic and also setting of required Values
8. Positioning of the Paver and lowering the screed; Adjustment of Auger Height and Tow Point Position.
1. Before dumping the last truck, turn off the screed heating system and wash down the hoppers and augers
with cleaning agent.
2. Before raising the screed, turn off the Automatic Grade and Slope Control and move the tow points
to the same height (to avoid twisting of the screed frame).
3. Raising the screed and put the screed arms in the screed locks.
5. Extant the screed completely and switch to Drive Mode Neutral “N”
10. Remove added Parts (like Sensors), protecting remaining parts (like controls and dash)
with the designated covers