Objectives
On completion of this module you will be able to:
• Describe the four primary kick-off methods
• Explain where and why each method is preferred
• Design a BHA for each type of method
• Select appropriate Bits for the chosen technique
• Work as a second hand on a kick-off operation
2 C.R.
03/03/2023
What is a Kick-off
3 C.R.
03/03/2023
Kick-off Methods
4 C.R.
03/03/2023
Kick-off Methods
Lithology is the key to selecting the most appropriate method:
Igneous &
Sedimentary
Metamorphic
1 4 5 6 7 8
5 C.R.
03/03/2023
Kick-off Methods
Igneous &
Sedimentary
Metamorphic
1 4 5 6 7 8
Motor
Jetting Whipstock
6 C.R.
03/03/2023
Jetting
Jetting is the utilization of hydraulics to wash a pocket
beneath and to the side of the bit to cause deflection.
7 C.R.
03/03/2023
Jetting Bits
Two cone jetting bits like this
one from RBI® are available
but rarely seen in the field:
8 C.R.
03/03/2023
Jetting Bits
Conventional roller cone bits
are commonly used for
jetting and are adequate for
the task :
9 C.R.
03/03/2023
Jetting BHA
BHAs for jetting need to be designed on the principles of
conventional “Rotary Build BHAs”:
• Jetting Bit (oriented)
• Near Bit Full Gauge Stabilizer
• Orientation Sub (UBHO) (dependent on measurement tool)
• Up to 3 Drill Collars ( 12” to 26” hole) or (MWD + 2 DCs)
• String Stabilizer (optional, as is gauge if present)
• Transition string, jars etc. as required
10 C.R.
03/03/2023
Jetting Procedure
The steps to follow are:
1. Orient BHA prior to commencing (Scribe or survey)
2. Come on bottom using maximum flow rate
(>500’/sec)
3. Spud for +/- 6’ (2m)
4. Rotate remainder of double at reduced flow rate.
5. Survey (if retrievable tool or use cont. D&I if MWD)
6. Adjust orientation and distance spudded as required
7. Repeat from 2.
11 C.R.
03/03/2023
Whipstocks
12 C.R.
03/03/2023
Whipstocks
Whipstocks come in five primary types:
13 C.R.
03/03/2023
Open / Cased Hole Cemented Whipstock
Features:
• 2 run (minimum) system
• Hollow, Bladed & Ported tail
• Inexpensive
• Simple & Reliable
• Problems in field when making “Low
side” kick-offs
14 C.R.
03/03/2023
Open / Cased Hole Cemented Whipstock
15 C.R.
03/03/2023
Open Hole Packer Whipstock
Features:
2 run system
• Cement inflated Packer
• Costly
• Complex but Reliable (hole conditions)
16 C.R.
03/03/2023
Open Hole Packer Whipstock
17 C.R.
03/03/2023
Open Hole Packer Whipstock
18 C.R.
03/03/2023
Cased Hole Mechanical Set Whipstock
Features:
1, 2 or 3 run system
• Mechanically Set Packer
• Inexpensive
• Simple
• Requires Cement Plug or Bridge Plug to
set
19 C.R.
03/03/2023
Cased Hole Mechanical Set Whipstock
20 C.R.
03/03/2023
Cased Hole Hydraulic Set Whipstock
Features:
1, 2 or 3 run system
• Hydraulically Set Packer
• Costly
• Simple
• Set at any depth or orientation required
21 C.R.
03/03/2023
Cased Hole Hydraulic Set Whipstock
22 C.R.
03/03/2023