GENERAL
INFORMATION
SERVICE DEVELOPMENT PT FAJAR MAS MURNI
SERVICE DEVELOPMENT PT FAJAR MAS MURNI
SIERRA
SERVICE DEVELOPMENT PT FAJAR MAS MURNI
INTERCONNECTING PIPING
STAR DELTA STARTER
INTELLISYS CONTROL AND
MONITORING SYSTEM
SAE O-RING OR 37° FLARE PIPING
CONNECTIONS
RESILIENT MOUNTED MOTOR AND
AIREND
RESILIENT MOUNTED COOLER
ASSEMBLY
SIERRA
SERVICE DEVELOPMENT PT FAJAR MAS MURNI
POTENTIAL APPLICATIONS
PHARMACEUTICAL
OPTICAL
ELECTRONICS
TEXTILE
CHEMICAL
BASIC TWO STAGE THEORY
SERVICE DEVELOPMENT PT FAJAR MAS MURNI
THEORETICAL DISCHARGE
TEMPERATURE
SINGLE STAGE TO 125 PSIG .........
600°F
TWO STAGE TO 125 PSIG WITH
PERFECT INTERCOOLING ....
310°F
DATA BASED ON 100°F AMBIENT AIR
TEMPERATURE
BASIC TWO STAGE THEORY
SERVICE DEVELOPMENT PT FAJAR MAS MURNI
SIERRA Nominal Full load FAD* FAD* Length Width Height Weight
SERVICE DEVELOPMENT PT FAJAR MAS MURNI
SIERRA Nominal Full load FAD* FAD* Length Width Height Weight
SERVICE DEVELOPMENT PT FAJAR MAS MURNI
Standard Operating Conditions:Ambient Temp.: 35°F to 115°F, Ambient Pressure: 14.4 PSIA
Cooling Air Temp. (Avg.) : 80°F, Ambient Relative Humidity: 60%, Rating Tolerance: +/- 5% Capacity
and +/- 5% Specific Power, * FAD (Free Air Delivery) = Total Package flow at the rated discharge
pressure.
AIRENDS
SERVICE DEVELOPMENT PT FAJAR MAS MURNI
CD8 (50-100)
– 1st Stage - Oil cooled housing
– 2nd Stage - Oil cooled housing
CD14 (125-200)
– 1st Stage - Air cooled
– 2nd Stage - Oil cooled housing
MOTOR
SERVICE DEVELOPMENT PT FAJAR MAS MURNI
AIR-COOLED
– FINNED TUBE RADIATOR TYPE
– ALL ALUMINUM CONSTRUCTION UP TO 125 PSIG
OPERATION
– STAINLESS STEEL AFTERCOOLER FOR 150 PSIG
OPERATION
– THREE PIECE CONSTRUCTION
– OIL COOLER
– INTERCOOLER
» 20° APPROACH TEMPERATURE
– AFTERCOOLER
» 20°F APPROACH TEMPERATURE
– SUPPORTED VIA ISOLATION MOUNTS
SERVICE DEVELOPMENT PT FAJAR MAS MURNI
SERVICE DEVELOPMENT PT FAJAR MAS MURNI
COOLING AIR FLOW 125-200 HP
SERVICE DEVELOPMENT PT FAJAR MAS MURNI
COOLING AIR FLOW 50-100 HP
SERVICE DEVELOPMENT PT FAJAR MAS MURNI
HEAT EXCHANGERS
SERVICE DEVELOPMENT PT FAJAR MAS MURNI
WATER-COOLED
– SHELL & TUBE HEAT EXCHANGERS
– WATER IN THE SHELL ON INTERCOOLER &
AFTERCOOLER WATER IN THE TUBE ON OIL
COOLER
– INTERCOOLER & AFTERCOOLER ARE
INTERCHANGEABLE
– PARALLEL WATER FLOW IS STANDARD
– HIGH POINT VENT
– AUTOMATIC WATER VALVE ON OUTLET
– SUPPORTED VIA ISOLATION MOUNTS
– INTERCOOLER AND AFTERCOOLER HAVE 15°F
APPROACH
SERVICE DEVELOPMENT PT FAJAR MAS MURNI
SIERRA WATER-COOLED WATER PIPING
AFTERCOOLER INTERCOOLER
OIL COOLER
4SV
WFS
WATER
IN
WATER OUT
INLET CONTROL VALVE
SERVICE DEVELOPMENT PT FAJAR MAS MURNI
ONLINE/OFFLINE OPERATION
SELF-CONTAINED UNIT
EASY ADJUSTMENT
REPLACEABLE PARTS
SERVICE DEVELOPMENT PT FAJAR MAS MURNI
GEARCASE
SERVICE DEVELOPMENT PT FAJAR MAS MURNI
RIGID DESIGN
INTERNALLY RIBBED
INTEGRAL SUMP
BAFFLING SO OIL CIRCULATES THROUGH
COMPLETE SUMP
MACHINED RABBET FITS FOR MOTOR ADAPTER
AND AIRENDS
ACCESS PLATES FOR CLEAN OUT (THRU
APPROX APRIL 1994)
NEW GEARCASE IS SPLIT FOR CORE CLEAN
OUT
AGMA 12 BULL GEAR
LIP SEAL ON INPUT DRIVE SHAFT
SILENCER
SERVICE DEVELOPMENT PT FAJAR MAS MURNI
ONLINE/OFFLINE OPERATION
MONITORS 23 ESSENTIAL VARIABLES 20 TIMES
A SECOND
PROVIDES DIGITAL READOUT FOR PRESSURE
AND TEMPERATURE
STANDARD DISPLAY INCLUDES 14 SELECTABLE
READOUTS
STAR DELTA STARTING IS STANDARD
PROVIDES FOR EASY TROUBLE SHOOTING OF
UNIT
10 ADJUSTABLE PARAMETERS
16 WARNING/ALARMS