You are on page 1of 47

TURBINE CONTROL

EQUIPMENT

TURBINE CONTROL DEVICE DESIGN GROUP


KEIHIN PRODUCT OPERATION

1 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
Contents

1.Steam Valves
2. Lube Oil System
3. EHC Oil System
4. Turbine Protection
5. Surveillance Test

2 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
1

1. Steam Valves

1-1. Main Stop / Control Valve


1-2. Combined Reheat Valve
1-3. Overload Valve

3 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
1-1

Steam Valves – Main Stop / Control Valve (Ref. 10098-00-I-71-MA)


Main Stop /
Control Valve

CV-A HP Turbine IP Turbine LP Turbine

MSV-A

Boiler Overload Valve CONDENSER


Super
Heater
OLV CRV-A ICV-A RSV-A
MSV-B CRV-B ICV-B RSV-B
CV-B
Combined Reheat Valve
Boiler
Reheater Main Stop Valve Design Condition for MSV/CV
To shut off the steam flow from boiler when unit tripped. Normal Operation (100%MCR)
Control Valve P= 25.0 MPa, T= 582.0 deg.C
To control steam flow into HIP turbine for speed control Maximum Steam Condition
and load regulation of Steam Turbine. P= 27.1 MPa, T= 589.0 deg.C

4 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
1-1

Main Stop / Control Valve – Outline (Ref. 10098-00-M-55-MAA)


Steam Flow
From Boiler

MSV

HP
Turbine
Steam Flow
From Boiler

HP
Turbine
CV

5 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
1-1

Main Stop Valve / Control valve - Sectional Schematics


MSV
With Bypass Valve MSV
Seat Diameter : 279.4 mm (11”) Coupling
Valve Stroke : 111.8 mm
Bypass Valve Stroke : 16.0 mm
Total Stem Stroke : 127.8 mm
MSV Valve Stem
MSV Upper Head
MSV Actuator
Strainer
Servo Controlled, Single Acting,
Spring return (Fail to Close)
Bypass Valve
Piston Diameter : 220 mm
Rod Diameter : 90 mm Casing
CEOT : 10 mm
MSV Valve Disc

CV
Seat Diameter : 254.0 mm (10”) MSV Valve Seat
Valve Stroke : 88.9 mm CV Sleeve
Total Stem Stroke : 88.9 mm
CV Valve Seat
CV Actuator
Servo Controlled, Single Acting, CV Valve Disc
CV Upper Head
Spring return (Fail to Close)
Piston Diameter : 240 mm
Rod Diameter : 90 mm
CEOT : 10 mm CV CV Valve Stem

6 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
1-1

Main Stop Valve / Control Valve – Steam Flow


MSV
With Bypass Valve MSV
Seat Diameter : 279.4 mm (11”)
Valve Stroke : 111.8 mm
Bypass Valve Stroke : 16.0 mm
Total Stem Stroke : 127.8 mm

MSV Actuator
Servo Controlled, Single Acting,
Spring return (Fail to Close)
Piston Diameter : 220 mm
Rod Diameter : 90 mm
CEOT : 10 mm

CV
Seat Diameter : 254.0 mm (10”)
Valve Stroke : 88.9 mm
Steam Flow
Total Stem Stroke : 88.9 mm From Boiler
CV Actuator
Servo Controlled, Single Acting,
Spring return (Fail to Close)
Piston Diameter : 240 mm
Rod Diameter : 90 mm HP Turbine
CEOT : 10 mm CV

7 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
1-1

Main Stop Valve - Control Diagram (Ref. 10098-00-I-71-MA)


MSV TRIP OIL
Servo Valve control for SUPPLY
Trip
Solenoid Valve bypass valve operation
during Turbine Start-up EHC CONTROL
OIL SUPPLY
sequence. (FAS)

Dump
Valve

Limit
Switch

LVDT
Servo
Valve

From
Boiler
FILTER
To CV

To HP Turbine

8 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
1-1

Control valve - Control Diagram (Ref. 10098-00-I-71-MA)


From MSV
OPEN

Control Valve (CV) To HP Turbine


Servo Valve control for valve
positioning (throttling for speed
control & load regulation).

LVDT
TRIP OIL
SUPPLY

EHC CONTROL
OIL SUPPLY
(FAS) Trip Dump
Solenoid Valve Valve

Servo FILTER
Valve

9 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
1-1

Main Stop Valve / Control - EHC : Normal Operation Ref. 10098-00-I-71-MA)


(Required Opening > Actual Opening)
Trip Solenoid Valve
OPEN To drainTrip
the Trip Oil when
Solenoid Valvethe Dump Valve.
tripped, to open
Operated by the EHC signal.
De-Energized to Trip.

ENERGIZED
LVDT

TRIP OIL SUPPLY


Trip Oil is branched from
Control Oil supply internally.
Dump Valve
To drain the control oil from
EHC CONTROL Actuator Cylinder when
OIL SUPPLY Tripped.
(FAS)
Actuated by Trip Oil via Pilot
TRIP OIL Dump Valve.
SUPPLY Open to Trip

CLOSED

10 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
1-1

Main Stop Valve / Control valve- EHC : Normal Operation (Ref. 10098-00-I-71-MA)
(Required Opening < Actual Opening)
CLOSE Trip Solenoid Valve
To drainTrip
the Trip Oil when
Solenoid Valvethe Dump Valve.
tripped, to open
Operated by the EHC signal.
De-Energized to Trip.
LVDT
ENERGIZED

TRIP OIL SUPPLY


Trip Oil is branched from
Control Oil supply internally.

EHC CONTROL
Dump Valve
OIL SUPPLY To drain the control oil from
(FAS) Actuator Cylinder when
Tripped.
TRIP OIL
Actuated by Trip Oil via Pilot
SUPPLY
Dump Valve.
Open to Trip
EHC CONTROL
OIL DRAIN (FCD)
CLOSED

11 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
1-1

Main Stop Valve / Control valve- EHC : Trip Mode (Ref. 10098-00-I-71-MA)
CLOSE
Trip Solenoid Valve
TRIP OIL is drained thru Dump
Valve to Drain system.
LVDT TRIP OIL is interrupted by Trip
Solenoid Valve.

DE-ENERGIZED

EHC CONTROL
OIL SUPPLY
(FAS)

TRIP OIL
SUPPLY
Dump Valve
EHC CONTROL As Dump Valve opened by De-
OIL DRAIN (FCD) Energizing Trip Solenoid Valve,
Control Oil Supply between Servo
Valve and Cylinder is connected to
TRIP OIL DRAIN
Drain system.

OPENED

12 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
1-2

Steam Valves – Combined Reheat Valve (Ref. 10098-00-I-71-MA)


Main Stop /
Control Valve

CV-A HP Turbine IP Turbine LP Turbine

MSV-A

Boiler Overload Valve CONDENSER


Super
Heater
OLV CRV-A ICV-A RSV-A
MSV-B CRV-B ICV-B RSV-B
CV-B
Combined Reheat Valve
Boiler
Reheater
Design Condition for CRV Reheat Stop Valve (RSV)
Normal Operation (100%MCR) To shut off the steam flow from Reheater when unit tripped.
P= 4.903 MPa, T= 593.0 deg.C Intercept Valve
Maximum Steam Condition To control steam flow into IP turbine for speed control
P= 6.750 MPa, T= 600.0 deg.C during unit start-up and load rejection.

13 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
1-2

Combined Reheat Valve – Outline (Ref. 10098-00-M-55-MAB-0002-0)


From
CRV-A Reheater
ICV Actuator

OIL TRAY CRV Casing

To
IP Turbine

From To
Reheater IP Turbine

CRV Upper Head RSV Actuator


CRV-B From
Reheater

14 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
1-2

Combined Reheat Valve - Sectional Schematics


ICV Connector Balance Chamber
RSV
With bypass valve ICV Valve Stem
Seat Diameter : 463.55 mm (18.25”)
CRV Upper Head
Bypass Valve Stroke : 11 mm
Valve Stroke : 154 mm
Strainer
Total Stroke : 165 mm

RSV Actuator ICV Valve Disc


Servo Controlled, Single Acting,
Spring return (Fail to Close)
Piston Diameter : 190 mm Back Seat
Rod Diameter : 90 mm
CEOT : 10 mm

ICV
Seat Diameter : 533.40 mm (21”) Valve Seat RSV Bypass Valve
Valve Stroke : 127 mm
(Common Seat) RSV Valve Disc
ICV Actuator
Servo Controlled, Single Acting,
Back Seat
Spring return (Fail to Close)
Piston Diameter : 160 mm RSV Valve Stem
Rod Diameter : 60 mm
CEOT : 10 mm

15 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
1-2

Combined Reheat Valve – Steam Flow


RSV
With bypass valve
Seat Diameter : 463.55 mm (18.25”)
Bypass Valve Stroke : 11 mm
Valve Stroke : 154 mm
Total Stroke : 165 mm

RSV Actuator
Servo Controlled, Single Acting,
Spring return (Fail to Close)
Piston Diameter : 190 mm
Rod Diameter : 90 mm
CEOT : 10 mm

ICV
Seat Diameter : 533.40 mm (21”)
Valve Stroke : 127 mm

ICV Actuator
IP Turbine
Servo Controlled, Single Acting,
Spring return (Fail to Close)
Piston Diameter : 160 mm
Rod Diameter : 60 mm
CEOT : 10 mm
Reheater

16 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
1-2

Combined Reheat Valve - Control Diagram(Ref. 10098-00-I-71-MA)


Trip
Solenoid Valve
TRIP OIL
SUPPLY
Dump
Valve
ICV
EHC CONTROL
LVDT OIL SUPPLY
(FAS)
Servo Valve

From
FILTER Reheater
To IP
Turbine
Trip
RSV Solenoid Valve
LVDT
Dump
Limit Switch Valve

RSV-A & B Servo Valve


FILTER
Servo Valve control for
bypass valve operation
during turbine Start-up
sequence.
(Flow control of IP steam)

17 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
1-3

Steam Valves – Overload Valve (Ref. 10098-00-I-71-MA)


Main Stop /
Control Valve

CV-A HP Turbine IP Turbine LP Turbine

MSV-A

Boiler Overload Valve CONDENSER


Super
Heater
OLV CRV-A ICV-A RSV-A
MSV-B CRV-B ICV-B RSV-B
CV-B
Combined Reheat Valve
Boiler
Reheater
Design Condition for OLV
Normal Operation (100%MCR) Overload Valve (OLV)
P= 25.0 MPa, T= 582.0 deg.C To Control steam flow to intermediate stage of HP turbine
Maximum Steam Condition when the steam volume exceeds Control Valve capacity.
P= 27.1 MPa, T= 589.0 deg.C

18 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
1-3

Overload Valve– Outline (Ref. 10098-00-M-55-MAN-0016-01)

OLV Actuator

Oil Tray

STAND
To HP
Turbine OLV Casing

From From
From From
MSV (B) MSV (A)
MSV (B) MSV (A)

HP
Turbine

19 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
1-3

Overload Valve - Sectional Schematics


Yoke

OLV Valve Stem

OLV
Seat Diameter : 127 mm (5”)
Valve Stroke : 6.5 mm

OLV Actuator
Servo Controlled, Single Acting,
Spring return (Fail to Close)
Piston Diameter : 190 mm
Rod Diameter : 90 mm
Valve Disc
CEOT : 10 mm

Casing Valve Seat

20 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
1-3

Overload Valve – Steam Flow

OLV
Seat Diameter : 127 mm (5”)
Valve Stroke : 6.5 mm

OLV Actuator
Servo Controlled, Single Acting,
Spring return (Fail to Close)
Piston Diameter : 190 mm
Rod Diameter : 90 mm
CEOT : 10 mm MSV (B) MSV (A)

HP Turbine

21 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
1-3

Overload - Control Diagram(Ref. 10098-00-I-71-MA)

TRIP OIL
SUPPLY
Trip
Solenoid Valve EHC CONTROL
OIL SUPPLY
Dump (FAS)
Valve
LVDT
Shutoff
Solenoid valve
Energized
Servo Valve OLV

FILTER

From
MSV
Shutoff Solenoid Valve
Not to open OLV during
turbine low load operation.
Shutoff valve is equipped for Overload Valve (OLV) To HP
interlock purpose. Servo Valve control Turbine
for valve positioning.

22 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
2

2. Lube Oil System

2-1. Lube Oil Flow Diagram


2-2. Main Oil Tank
2-3. Front Standard
2-4. Lube Oil Conditioner

23 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
Lube Oil System – Flow Diagram (Ref. 10098-00-M-51-MAV)

Front Standard

Main Oil Main Oil


Strainer B Cooler B
Main Oil Main Oil
Strainer A Cooler A

Main Oil Tank

24 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
2-1

Lube Oil System – Main Oil Tank Flow Diagram (Ref. 10098-00-M-51-MAV)

From STG MAIN OIL PUMP A


Bearing MAIN OIL PUMP B
EMERGENCY OIL PUMP
To STG
Bearing To Mist Separator

VAPOUR EXTRACTOR A
MAIN OIL STRAINER A
VAPOUR EXTRACTOR B
MAIN OIL STRAINER B
Transfer Valve
From Oil Conditioner

MAIN OIL COOLER A To Oil Conditioner


MAIN OIL COOLER B

Flow Discharge Motor


Main Oil Tank Pump Design Condition Rate Press. Power
CAPACITY L/min Mpa kW
Full : 37,120L Main Oil Pump A / B MOP 2970 0.57 75
NOL : 21,000L Emergency Oil Pump EOP 2430 0.41 45

25 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
2-1

Lube Oil System – STG Bearing & Front Standard(Ref. 10098-00-M-51-MAV)


Bearing Pressure
at Normal Operation
0.18 Mpa

FROM / TO GEN
H2 SEAL OIL
SYSTEM

26 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
2-2

Lube Oil System – Main Oil Tank Outline(Ref. 10098-00-55-MAV-0013-01)


MOP-B MOP-A EOP Switch Panel

Strainer Access Door

Top View
OIL RETURN PIPE

VAPOUR EXTRACTOR B
BRG OIL FEED
VAPOUR EXTRACTOR A
Switch Panel

Side View

27 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
2-2

Lube Oil System – MOP & EOP Assembly Drawing

Coupling Flange

Bearing

Shaft
Frame

Impeller
Pump Casing

Suction Strainer

Centrifugal pump
Vertical installation Typical Assembly Drawing
For MOP & EOP

28 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
2-3

Lube Oil System – Front Standard Outline


Differential Shell Expansion
Expansion Detector
Detector

Oil Sight

Eccentricity Detector Oil Deflector


No.1 BRG
No.1 BRG Return Oil
Temperature Indicator No.1 BRG Feed Oil
Temperature Indicator

Front View
No.1 BRG Oil
Pressure Indicator

Center Section
29 / TOSHIBA Energy Systems & Solutions Corporation
Copyright © 2018 Toshiba Corporation. All rights reserved.
2-4

Lube Oil Conditioner – Flow Diagram(Ref. 10098B-00-M-52-MAV)


To Main Oil Tank

Coalescer Filter

Dirty Oil Drain Filter Pump


Suction Strainer
Water drain

From Main Oil Tank


Discgrag
Flow Motor
e
Design Condition Rate Power
Press.
L/min KW
Mpa
Filter Pump 66.7 0.34 1.5
Performance ( Within 5 cycle)
Seperation Capability NAS7
Water Separation 10,000ppm -> 500 ppm
30 / TOSHIBA Energy Systems & Solutions Corporation
Copyright © 2018 Toshiba Corporation. All rights reserved.
2-4

Lube Oil Conditioner – Outline(Ref. 10098-00-M-55-MAV)

Oily Water Drain Step

Filter Pump
To Main Oil Tank

From Main Oil Tank

Top View

Coalescer Filter
Level Gauge
Suction Strainer

Side View

31 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
3

3. EHC Oil System

3-1. EHC Oil System


3-2. EHC Unit

32 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
3-1

EHC Oil System – Flow Diagram(Ref. 10098-00-M-52-MAX)


CRV-A CRV-B
MSV-A MSV-B

CV-A CV-B

System pressure
16.5 Mpa

Working Fluid
Fatty Acid-polyol
Ester Oil
(Quintlubric 888-46
or 822-300SC)
EHC Oil Tank

33 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
3-2

EHC Unit – Flow Diagram.


Hydraulic fluid Actuator
EHC Oil Unit Supply (FAS)
Tank Capacity : Hydraulic Fluid Drain (FCD)
Full 800 L
NOL 674 L
Pump Capacity
Discharge Press. :
16.5 MPa
Flow Rate :
79 L/min EHC Oil Cooler A EHC Oil Cooler B
Accumulator
2 x 57 L
Relief Valve
Pressure
Line Filter
Return Filter B
Accumulator A Accumulator B
Return Filter A N2 Pre-charged

EHC Oil EHC Oil


EHC Oil Tank Pump A Pump B

34 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
3-2

EHC Unit – Outline(Ref. 10098-00-M-55-MAV-0014-01)

Accumulator A Accumulator B

Switch Panel

EHC Oil Tank EHC Oil Cooler A

EHC Oil Cooler B

EHC Oil Pump B EHC Oil Pump A

35 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
4

4. Turbine Protection

4-1. Turbine Protection - Lube Oil Back Up


4-2. Turbine Protection - EHC Oil Back Up
4-3. Turbine Protection – Trip Function

36 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
4-1

Turbine Protection –MOP automatic start MOP Auto Start

PS-3A
MOP-B
40MAV10CP102

Stand-by Main Oil Pump(MOP)


Stand-by MOP must be started automatically in case MOP discharge pressure is decreased.
This Backup system is measured as following pressure switch set point of PS-3A (40MAV10CP102).

PS-3A < 0.47 MPa at MOP discharge header

37 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
4-1

Turbine Protection –EOP automatic start EOP Auto Start

EOP PS-3E
40MAV10CP103

Emergency Oil Pump(EOP)


EOP must be started automatically if Bearing Header oil pressure is decreased.
This Backup system is measured as following pressure switch set point of PS-3E (33MAV10CP103).
PS-3E < 0.110 MPa at Turbine On Center
38 / TOSHIBA Energy Systems & Solutions Corporation
Copyright © 2018 Toshiba Corporation. All rights reserved.
4-2

Turbine Protection –HFP automatic start HFP Auto Start

Hydraulic Control PS-102


Pump(HFP) 40MAX10CP106
HFP must be started
automatically if HFP
discharge oil pressure is
decreased.

This Backup system is


measured as following
pressure switch set point.

PS-102 < 13.5 MPa

HFP
EHC Oil Tank

39 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
4-3

Turbine Protection –Bearing Oil Pressure Low-Low Turbine Trip Turbine Trip

Signal to
D-EHC
FROM / TO GEN
H2 SEAL OIL
SYSTEM

(2 out of 3
system)
PS-10A,B,C
< 69 kPa
(Turbine On
Center)
From Main Oil Tank
40MAV10CP101A
At normal operation, bearing oil pressure is 0.18 MPa (turbine on center). 40MAV10CP101B
If bearing oil pressure is reduced to bearing oil pressure “low-low turbine 4-MAV10CP101C
trip (69 kPa)” STG turbine shall be tripped.
40 / TOSHIBA Energy Systems & Solutions Corporation
Copyright © 2018 Toshiba Corporation. All rights reserved.
4-3

Turbine Protection –HFP Discharge Pressure Low-Low Turbine Trip Turbine Trip
PS-101A~C
To EHC System 40MAX10CP101A
At normal operation,
HFP discharge 40MAX10CP101B
pressure is 16.5MPa. 40MAX10CP101C
If HFP discharge
pressure is reduced, Signal to
STG turbine shall be D-EHC
tripped.

2 out of 3 system
PS-101A~C
< 11.4 MPa

HFP
EHC Oil Tank

41 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
5

5. Surveillance Test

5-1. Valve Test


5-2. Lube Oil Pump
5-3. EHC Oil Pump

42 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
5-1

Surveillance Test – Valve Test Valve Test


Sequence

Valve Position 100%


(MSV, CV, RSV, ICV)
10%
0%

Close signal
Servo Valve
(MSV, CV, RSV, ICV) Open signal
De-Energized

Trip Solenoid
Valve
(MSV, CV, RSV, ICV)

43 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
5-2

Pump Test
Surveillance Test – Lube Oil System MOP Automatic Start Test
Pressure Switch
PS-3A,
40MAV10CP102
Switch Panel
PS-3A

To
Main Oil Tank
(Drain)

From MOP Discharge


To
Main Oil Tank Normal Operation
From MOP Discharge
PS-3A

Test order : To Main Oil Tank


1) Close the Instrument Valve (Drain)
2) Open the Test Valve slowly to release the
MOP must be started automatically if MOP discharge oil oil to drain.
pressure is decreased. 3) When the oil pressure become lower
This MOP discharge oil pressure is measured by PS-3A than the pre-set pressure, MOP will be From MOP Discharge
automatically started.
(40MAV10CP102). 4) Open the Instrument Valve and close the
Test Valve.
At Test
44 / TOSHIBA Energy Systems & Solutions Corporation
Copyright © 2018 Toshiba Corporation. All rights reserved.
5-2

Pump Test
Surveillance Test – Lube Oil System EOP Automatic Start Test
Pressure Switch
PS-3E,
40MAV10CP103
Switch Panel
PS-3E

To
Main Oil Tank
(Drain)
To
Main Oil Tank
From MOP Discharge

Normal Operation

From MOP Discharge PS-3E

To Main Oil Tank


(Drain)
Test order :
1) Close the Instrument Valve
EOP must be started automatically if MOP discharge oil 2) Open the Test Valve slowly to release
the oil to drain.
pressure is decreased (measured after PRV). 3) When the oil pressure become lower
This MOP discharge oil pressure is measured by PS-3E than the pre-set pressure, EOP will be From MOP Discharge
(40MAV10CP103). automatically started.
4) Open the Instrument Valve and close
the Test Valve.
At Test
45 / TOSHIBA Energy Systems & Solutions Corporation
Copyright © 2018 Toshiba Corporation. All rights reserved.
5-3

Pump Test
Surveillance Test –EHC Oil Unit - HFP Automatic Start Test
PS-102
To EHC System Automatic test
To PS-102
EHC Oil Tank
(Drain) PS-102
40MAX10CP106

From HFP Discharge

Normal Operation

PS-102

To EHC Oil Tank


(Drain)

HFP must be started


automatically if HFP discharge
From HFP Discharge oil pressure is decreased.
HFP This HFP discharge oil pressure
At Test is measured by PS-102.
EHC Oil Tank
(40MAX10CP106)

46 / TOSHIBA Energy Systems & Solutions Corporation


Copyright © 2018 Toshiba Corporation. All rights reserved.
END
47 / TOSHIBA Energy Systems & Solutions Corporation
Copyright © 2018 Toshiba Corporation. All rights reserved.

You might also like